GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN BERNARDINO COUNTY

DETERMINATION: SBR-2012-2

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, STONEMASON,   |          |            |          |          |          |          |          |         |      |      |          |          |
   MARBLE MASON, CEMENT     |          |            |          |          |          |          |          |         |      |      |          |          |
   BLOCKLAYER, POINTER,     |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, CLEANER         |08/22/2012|04/30/2013* |A   35.960|     5.700|     5.220|      -   |     0.400|    0.900|B  8.0|48.180|C   66.160|C   66.160|    84.140
# BRICKLAYER:               |          |            |          |          |          |          |          |         |      |      |          |          |
   MASON FINISHER           |08/22/2012|04/30/2013* |A   25.700|     5.650|     6.750|      -   |     0.400|    0.900|B  8.0|39.400|C   52.250|C   52.250|    65.100
# BRICK TENDER              |08/22/2012|06/30/2013* |    27.170|     6.810|     6.000|D    3.900|     0.650|    0.420|B  8.0|44.950|    58.530|    58.530|    72.120
# BRICK TENDER:             |          |            |          |          |          |          |          |         |      |      |          |          |
   FORKLIFT OPERATOR        |08/22/2012|06/30/2013* |    27.620|     6.810|     6.000|D    3.900|     0.650|    0.420|B  8.0|45.400|    59.210|    59.210|    73.020
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   RESILIENT TILE LAYER     |08/22/2012|04/29/2013**|A   30.850|     4.980|     2.700|     2.050|     0.830|    0.200|   8.0|41.610|    57.040|E   57.040|    72.460
   MATERIAL HANDLER F       |08/22/2012|04/29/2013**|A    9.250|     4.980|     0.950|     0.550|     0.830|    0.100|   8.0|16.660|    21.280|E   21.280|    25.910
# DRYWALL FINISHER          |          |            |          |          |          |          |          |         |      |      |          |          |
   DRYWALL FINISHER         |02/22/2012|09/30/2012* |A   33.220|     5.950|     4.120|     3.070|     0.670|    0.470|   8.0|47.500|    64.110|G   64.110|    80.720
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |08/22/2012|11/25/2012**|    27.680|     6.950|H    2.850|      -   |     0.650|I   0.210|   8.0|39.170|J   53.430|J   53.430|    67.680
   COMM & SYSTEM TECH.      |08/22/2012|11/25/2012**|    29.480|     6.950|H    2.850|      -   |     0.650|I   0.210|   8.0|41.020|J   56.210|J   56.210|    71.390
   INSIDE WIREMAN - ZONE A K|08/22/2012|06/02/2013**|L   35.600|     7.450|H    9.200|      -   |     0.700|M   0.500|   8.0|54.780|N   73.360|N   73.360|    91.950
   CABLE SPLICER - ZONE A K |08/22/2012|06/02/2013**|L   36.600|     7.450|H    9.200|      -   |     0.700|M   0.510|   8.0|55.820|N   74.920|N   74.920|    94.030
   TUNNEL WIREMAN - ZONE A K|08/22/2012|06/02/2013**|L   39.160|     7.450|H    9.200|      -   |     0.700|M   0.540|   8.0|58.480|N   78.920|N   78.920|    99.360
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-010) O          |02/22/2012|09/30/2012**|    40.940|    11.200|     5.950|D    4.020|     0.900|    0.150|   8.0|63.160|J   83.630|J   83.630|P  104.100
   INSTRUMENTMAN            |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-034) O          |02/22/2012|09/30/2012**|    38.440|    11.200|     5.950|D    4.020|     0.900|    0.150|   8.0|60.660|J   79.880|J   79.880|P   99.100
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |         |      |      |          |          |
   (869.567-010) O          |02/22/2012|09/30/2012**|    37.860|    11.200|     5.950|D    4.020|     0.900|    0.150|   8.0|60.080|J   79.010|J   79.010|P   97.940
# GLAZIER                   |08/22/2012|05/31/2013* |Q   38.950|R    6.250|    12.890|S     -   |     0.770|    0.530|   8.0|59.390|T   77.870|T   77.870|    96.340
  MARBLE FINISHER           |08/22/2012|05/31/2013**|U   27.040|     7.560|     2.710|      -   |     0.530|    0.330|V  8.0|38.170|W   51.690|X   51.690|Y   65.210
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PAINTER, LEAD ABATEMENT Z|08/22/2012|06/30/2013* |L   29.320|     5.700|     3.040|     1.050|     0.590|    0.820|   8.0|40.520|AA  55.180|AA  55.180|AA  55.180
   REPAINT PAINTER, LEAD    |          |            |          |          |          |          |          |         |      |      |          |          |
   ABATEMENT Z              |08/22/2012|06/30/2013* |L   26.050|     5.700|     3.040|     1.050|     0.590|    0.820|   8.0|37.250|AB  50.270|AB  50.270|AB  50.270
   INDUSTRIAL PAINTER Z     |08/22/2012|06/30/2013* |L   29.320|     5.700|     3.040|     1.050|     0.590|    0.820|   8.0|40.520|AA  55.180|AA  55.180|AA  55.180
   INDUSTRIAL REPAINT       |          |            |          |          |          |          |          |         |      |      |          |          |
   PAINTER Z                |08/22/2012|06/30/2013* |L   26.050|     5.700|     3.040|     1.050|     0.590|    0.820|   8.0|37.250|AB  50.270|AB  50.270|AB  50.270
# PLASTERER                 |08/22/2012|08/06/2013**|AC  32.650|     7.880|     4.210|     3.010|     0.500|    0.950|AD 8.0|49.200|    64.460|AE  64.460|    79.710
# PLASTER TENDER AF         |08/22/2012|08/06/2013**|    30.000|     6.810|     5.400|AG   4.500|     0.900|    0.840|   8.0|48.450|    63.450|AH  63.450|    78.450
   PLASTER CLEAN-UP LABORER |08/22/2012|08/06/2013**|    27.450|     6.810|     5.400|AG   4.500|     0.900|    0.840|   8.0|45.900|    59.630|AH  59.630|    73.350
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, INDUSTRIAL AND  |          |            |          |          |          |          |          |         |      |      |          |          |
   GENERAL PIPEFITTER       |08/22/2012|06/30/2013**|U   38.570|     7.660|AI  10.520|AJ   3.030|     1.500|AK  0.620|   8.0|61.900|AL  81.900|AL  81.900|   100.390
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPELAYER                |08/22/2012|06/30/2013**|U   30.000|     7.160|AI   7.620|AJ   1.000|     1.230|AK  0.620|   8.0|47.630|    62.330|V   62.330|    76.530
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPE TRADESMAN AM        |08/22/2012|06/30/2013**|U   16.020|     7.160|     0.380|      -   |     0.660|AK  0.470|   8.0|24.690|    31.900|V   31.900|    39.110
   SERVICE & REPAIR         |          |            |          |          |          |          |          |         |      |      |          |          |
   (PLUMBER/HVAC-FITTER)    |08/22/2012|06/30/2013**|U   37.300|     7.660|AI  10.210|AJ   3.030|     0.830|AK  0.620|   8.0|59.650|    79.010|AN  79.010|AO  96.870
   LANDSCAPE/IRRIGATION     |          |            |          |          |          |          |          |         |      |      |          |          |
   FITTER                   |08/22/2012|12/31/2012**|U   24.860|     7.660|AI   8.630|AJ   2.490|     0.800|AK  0.370|V  8.0|44.810|    58.480|    58.480|    70.910
   LANDSCAPE/IRRIGATION     |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN                |08/22/2012|12/31/2012* |U   12.430|     2.000|AI   0.880|      -   |     0.100|AK  0.370|V  8.0|15.780|    22.000|    22.000|    28.210
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND) AP          |08/22/2012|12/31/2012**|    33.430|     8.420|AQ  10.360|      -   |     0.450|    0.250|   8.0|52.910|    69.630|    69.630|    86.340
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND) AR          |02/22/2012|12/31/2013**|    40.560|     8.670|    13.600|AS    -   |     1.350|AT  0.500|   8.0|64.680|    84.960|AU  84.960|   105.240
# ROOFER                    |08/22/2011|07/31/2012* |AV  34.650|     5.860|AW   4.410|S     -   |     0.300|    0.350|   8.0|45.570|AL  61.110|AL  61.110|    76.640
   PITCH WORK               |08/22/2011|07/31/2012* |AV  36.400|     5.860|AW   4.410|S     -   |     0.300|    0.350|   8.0|47.320|AL  63.730|AL  63.730|    80.140
   PREPARER                 |08/22/2011|07/31/2012* |AV  35.650|     5.860|AW   4.410|S     -   |     0.300|    0.350|   8.0|46.570|AL  62.600|AL  62.600|    78.640
# SHEET METAL WORKER        |08/22/2012|12/31/2012**|L   41.450|     8.370|    10.850|      -   |     1.120|    0.470|   8.0|62.260|AX  82.990|AX  82.990|   103.710
# TERRAZZO WORKER           |08/22/2008|08/30/2009* |A   33.630|     6.860|     3.150|AS    -   |     0.570|    0.120|V  8.0|44.330|W   61.150|X   61.150|Y   77.960
   TERRAZZO FINISHER        |08/22/2008|08/30/2009* |A   26.590|     6.200|     3.150|AS    -   |     0.360|    0.120|V  8.0|36.420|W   49.720|X   49.720|Y   63.010
# TILE FINISHER             |08/22/2012|05/31/2013**|U   22.370|     7.000|     1.800|      -   |     0.520|    0.330|V  8.0|32.020|W   43.210|X   43.210|Y   54.390
# TILE LAYER                |08/22/2012|05/31/2013**|U   33.550|     7.660|     5.500|      -   |     0.680|    0.330|V  8.0|47.720|W   64.490|X   64.490|Y   81.270
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT
   AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.


** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED.  IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW.  CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT.  THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @
   HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.  TO OBTAIN ANY APPRENTICE WAGE RATES AS OF JULY 1, 2008 AND PRIOR TO SEPTEMBER 1, 2012,
   PLEASE CONTACT THE DIVISION OF APPRENTICESHIP STANDARDS OR REFER TO THE DIVISION OF APPRENTICESHIP STANDARDS' WEBSITE AT
   HTTP://WWW.DIR.CA.GOV/DAS/DAS.HTML.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER, OR REASONS
   BEYOND THE CONTROL OF THE EMPLOYER.
C  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
D  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
E  RATE APPLIES TO THE FIRST 12 HOURS ON SATURDAY, ALL OTHER TIME IS PAID AT 2X
F  A MATERIAL HANDLER MAY BE UTILIZED IN RATIO OF ONE (1) MATERIAL HANDLER WITH ANY FIVE (5) JOURNEYMEN ON ANY GIVEN PROJECT.
G  RATE APPLIES TO FIRST 8 HOURS ONLY.  DOUBLE TIME THEREAFTER.  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN
   DURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
H  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
I  INCLUDES AN AMOUNT FOR THE NATIONAL LABOR-MANAGEMENT COOPERATION FUND AND THE ADMINISTRATIVE MAINTENANCE FUND.
J  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
K  ZONE A IS DEFINED AS THE PORTION OF THE COUNTY 80 ROAD MILES FROM U.S. POST OFFICE, 455 W. ORANGE SHOW ROAD, SAN BERNARDINO.  RATES FOR ZONE B WILL BE
   FURNISHED UPON REQUEST.
L  INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
M  IN ADDITION TO THE AMOUNT SHOWN, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR, $0.26 IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES FOR THE LABOR MANAGEMENT COOPERATION COMMITTEE FUND.
N  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.  ALL OVERTIME WORKED DAILY OR ON SATURDAYS,  FOR SERVICE AND REPAIR WORK OTHER THAN NEW WORK,  MAY BE PAID AT THE RATE OF TIME AND
   ONE-HALF.
O  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
P  RATE APPLIES TO WORK PERFORMED ON SUNDAYS AND HOLIDAYS
Q  INCLUDES AMOUNT WITHHELD FOR DUES CHECKOFF, WHICH IS FACTORED IN THE OVERTIME RATES.  INCLUDES $2.00 OF VACATION THAT IS NOT FACTORED IN THE OVERTIME
   RATES.
R  INCLUDES AN AMOUNT PER HOUR WORKED OR PAID TO DISABILITY FUND.
S  INCLUDED IN STRAIGHT-TIME HOURLY RATE WHICH IS NOT FACTORED IN THE OVERTIME RATES.
T  RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
U  INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
V  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
W  RATE APPLIES TO FIRST TWO DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE HOLIDAY OVERTIME HOURLY RATE.
X  RATE APPLIES TO THE FIRST 8 HOURS WORKED ON A SIXTH OR SEVENTH CONSECUTIVE DAY DURING ANY ONE CALENDAR WEEK UP TO 50 HOURS IN ANY ONE CALENDAR WEEK. 
   ALL OTHER TIME IS PAID AT THE HOLIDAY RATE.
Y  RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
Z  AN ADDITIONAL $0.25 PER HOUR WILL BE ADDED TO THE BASIC HOURLY RATE WHEN PERFORMING PAPERHANGING WORK.
AA DOUBLE TIME SHALL BE PAID FOR ALL HOURS WORKED OVER 12 HOURS IN ANY ONE DAY.
AB ON REPAINT WAGE WORK ANY 8 HOURS IN A 24 HOUR PERIOD MONDAY THROUGH SUNDAY SHALL BE THE WORK DAY AND ANY 40 HOURS IN A WEEK SHALL BE THE WORK WEEK,
   PROVIDED THAT THE 40 HOURS IS WORKED IN 5 CONSECUTIVE DAYS (LEGAL HOLIDAYS WILL NOT BE COUNTED IN THE 5 CONSECUTIVE DAYS). FOR ALL WORK UNDER THIS
   CRAFT/CLASSIFICATION DOUBLE TIME SHALL BE PAID FOR ALL HOURS WORKED OVER 12 HOURS IN ANY ONE DAY.
AC INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF.  EMPLOYEES WORKING ON SCAFFOLDS SUSPENDED BY CABLE OR ROPE SHALL RECEIVE AN ADDITIONAL ONE DOLLAR
   ($1.00) PER HOUR.
AD SATURDAY IN THE SAME WORKWEEK MAY BE WORKED AT THE STRAIGHT-TIME HOURLY RATE IF IT IS NOT POSSIBLE TO COMPLETE FORTY HOURS OF WORK MONDAY THROUGH
   FRIDAY WHEN THE JOB IS SHUT DOWN DUE TO INCLEMENT WEATHER OR SIMILAR ACT OF GOD, OR BEYOND THE CONTRACTOR'S CONTROL.
AE RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AF THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS:  FOR INSIDE BROWN COATINGS THERE SHALL BE NOT MORE THAN 3 PLASTERERS TO 2 PLASTER
   TENDERS; FOR INSIDE FINISH COATINGS THERE SHALL BE NOT MORE THAN 3 PLASTERERS TO 1 PLASTER TENDER; ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL
   OTHER WORK, THERE SHALL BE NOT MORE THAN 2 PLASTERERS TO 1 PLASTER TENDER.
AG INCLUDES AN AMOUNT PER HOUR WORKED OR PAID FOR SUPPLEMENTAL DUES.
AH RATE APPLIES TO THE FIRST EIGHT HOURS ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE. SATURDAY WORK MAY BE PAID AT THE
   STRAIGHT TIME RATE IF THE JOB IS SHUT DOWN DURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
AI INCLUDES AMOUNT FOR NATIONAL PENSION AND RETIREE'S X-MAS FUND.
AJ FACTORED AT 1.5 TIMES FOR ALL OVERTIME.
AK INCLUDES AN AMOUNT FOR THE P.I.P.E. LABOR MANAGEMENT COOPERATION COMMITTEE AND THE CONTRACTOR EDUCATION & DEVELOPMENT FUND.
AL RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
AM PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT  A JOURNEYMAN.
AN SATURDAY MAY BE WORKED AT STRAIGHT-TIME RATE, PROVIDED THAT THE HOURS DO NOT EXCEED 8 HOURS PER DAY OR 40 HOURS PER WEEK.
AO DOUBLE TIME SHALL BE PAID FOR NEW YEAR'S DAY, EASTER SUNDAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS.
AP RATE APPLIES TO REMAINDER OF COUNTY.
AQ INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AR APPLIES TO THE CITIES OF ONTARIO AND MONTCLAIR.
AS INCLUDED IN STRAIGHT-TIME HOURLY RATE.
AT AMOUNT IS FOR INDUSTRY PROMOTION FUND AND P.I.P.E. FUND.
AU RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
AV INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.
AW INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
AX RATE APPLIES FOR THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 12 HOURS WORKED ON SATURDAY.  ALL OTHER TIME IS PAID AT THE
   SUNDAY/HOLIDAY RATE.  SATURDAYS IN THE SAME WORKWEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT
   WEATHER.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINAT

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH
   WORKER TO EXECUTE THE WORK.  YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT
   HTTP://WWW.DIR.CA.GOV/OPRL/PWD.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE
   OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.