GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SANTA CRUZ COUNTY

DETERMINATION: STZ-2012-2

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER, |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND SHIFT             |08/22/2012|11/30/2012**|    33.140|     8.600|A    4.000|      -   |     1.100|B   0.210|   7.5|48.210|C   65.370|C   65.370|D   82.520
   COMM & SYSTEM INSTALLER, |          |            |          |          |          |          |          |         |      |      |          |          |
   THIRD SHIFT              |08/22/2012|11/30/2012**|    34.640|     8.600|A    4.000|      -   |     1.100|B   0.210|   7.0|49.760|C   67.680|C   67.680|D   85.610
   COMM & SYSTEM TECH.,     |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND SHIFT             |08/22/2012|11/30/2012**|    37.720|     8.600|A    4.000|      -   |     1.100|B   0.210|   7.5|52.950|C   72.470|C   72.470|D   91.990
   COMM & SYSTEM TECH.,     |          |            |          |          |          |          |          |         |      |      |          |          |
   THIRD SHIFT              |08/22/2012|11/30/2012**|    39.440|     8.600|A    4.000|      -   |     1.100|B   0.210|   7.0|54.730|C   75.140|C   75.140|D   95.560
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |         |      |      |          |          |
   TECHNICIAN SECOND SHIFT  |08/22/2012|09/23/2012**|E   45.320|F    9.800|G    9.500|      -   |F    0.950|H   0.200|I  7.5|67.470|J  101.100|J  101.100|D  134.740
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |         |      |      |          |          |
   TECHNICIAN THIRD SHIFT   |08/22/2012|09/23/2012**|E   47.380|F    9.800|G    9.500|      -   |F    0.950|H   0.200|K  7.0|69.610|J  104.320|J  104.320|D  139.020
   CABLE SPLICER SECOND     |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT                    |08/22/2012|09/23/2012**|E   50.990|F    9.800|G    9.500|      -   |F    0.950|H   0.200|I  7.5|73.350|J  109.920|J  109.920|D  146.500
   CABLE SPLICER THIRD SHIFT|08/22/2012|09/23/2012**|E   53.300|F    9.800|G    9.500|      -   |F    0.950|H   0.200|K  7.0|75.750|J  113.520|J  113.520|D  151.300
   INSIDE WIREMAN (WHEN     |          |            |          |          |          |          |          |         |      |      |          |          |
   WELDING) - 2ND SHIFT     |08/22/2012|09/23/2012**|E   49.850|F    9.800|G    9.500|      -   |F    0.950|H   0.200|I  7.5|72.170|J  108.150|J  108.150|D  144.130
   INSIDE WIREMAN (WHEN     |          |            |          |          |          |          |          |         |      |      |          |          |
   WELDING) - 3RD SHIFT     |08/22/2012|09/23/2012**|E   52.120|F    9.800|G    9.500|      -   |F    0.950|H   0.200|K  7.0|74.520|J  111.690|J  111.690|D  148.850
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT
   AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.


** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED.  IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW.  CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT.  THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @
   HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.  TO OBTAIN ANY APPRENTICE WAGE RATES AS OF JULY 1, 2008 AND PRIOR TO SEPTEMBER 1, 2012,
   PLEASE CONTACT THE DIVISION OF APPRENTICESHIP STANDARDS OR REFER TO THE DIVISION OF APPRENTICESHIP STANDARDS' WEBSITE AT
   HTTP://WWW.DIR.CA.GOV/DAS/DAS.HTML.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
B  IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES.
C  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   RATE.
D  DISREGARD THIS RATE.  USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING
   WAGE DETERMINATIONS.
E  ALL OF SANTA CRUZ, MONTEREY, AND SAN BENITO COUNTIES WITHIN TWENTY-FIVE (25) AIR-MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN AREA
   EXTENDING FIVE (5) MILES EAST AND WEST OF HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY LINE.  FOR WAGE RATES IN AN AREA OUTSIDE OF THIS
   DESCRIPTION, PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT.
F  CONTRIBUTION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR WORKED.
G  CONTRIBUTION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR WORKED. IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE HOURLY RATE IS
   ADDED TO THE DAILY AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
H  IN ADDITION, .75% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
I  8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE
J  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY.  ALL OTHER TIME AND WORK PERFORMED ON A SATURDAY THAT
   IMMEDIATELY FOLLOWS A DESIGNATED HOLIDAY THAT IS OBSERVED ON A FRIDAY ARE PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
K  8 HOURS PAY FOR 7 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINAT

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH
   WORKER TO EXECUTE THE WORK.  YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT
   HTTP://WWW.DIR.CA.GOV/OPRL/PWD.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE
   OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.