GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: TUOLUMNE COUNTY

DETERMINATION: TUO-2012-1

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON               |08/22/2011|04/30/2012**|A   32.610|     9.690|     8.500|B    2.500|     0.800|C   0.900|D  8.0|55.000|E   72.560|E   72.560|    90.110
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |02/22/2012|06/30/2012* |A   33.680|     9.690|     6.930|F     -   |     0.800|    0.700|D  8.0|51.800|    68.640|G   68.640|    85.480
# BRICK TENDER              |08/22/2010|06/30/2011* |H   30.420|     6.040|     7.160|F     -   |     0.340|      -  |D  8.0|43.960|E   59.170|E   59.170|    74.380
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   RESILIENT TILE LAYER     |02/22/2012|12/31/2012**|A   28.200|     9.700|     6.330|I     -   |     0.500|    0.110|   8.0|44.840|J   58.940|J   58.940|    73.040
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2012|03/31/2012* |    26.240|     7.850|K    4.000|      -   |     1.100|L   0.310|   8.0|40.420|M   54.000|M   54.000|    67.570
   COMM & SYSTEM TECH.      |02/22/2012|03/31/2012* |    29.880|     7.850|K    4.000|      -   |     1.100|L   0.310|   8.0|44.190|M   59.650|M   59.650|    75.110
   INSIDE WIREMAN           |02/22/2012|05/31/2013* |N   34.600|     9.020|K    7.130|F     -   |     1.000|O   0.010|   8.0|54.010|P   72.430|P   72.430|    90.860
   CABLE SPLICER            |02/22/2012|05/31/2013* |N   38.060|     9.020|K    7.130|F     -   |     1.000|O   0.010|   8.0|57.690|P   77.960|P   77.960|    98.220
   HEADING WIREMAN          |02/22/2012|05/31/2013* |N   36.500|     9.020|K    7.130|F     -   |     1.000|O   0.010|   8.0|56.030|P   75.470|P   75.470|    94.910
   HEADING CABLE SPLICER    |02/22/2012|05/31/2013* |N   40.150|     9.020|K    7.130|F     -   |     1.000|O   0.010|   8.0|59.920|P   81.310|P   81.310|   102.690
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY Q         |02/22/2012|02/28/2013**|    37.190|    11.580|R    8.720|S    3.320|     0.720|    0.160|   8.0|61.690|T   80.280|T   80.280|    98.880
   INSTRUMENTMAN Q          |02/22/2012|02/28/2013**|    34.100|    11.580|R    8.720|S    3.320|     0.720|    0.160|   8.0|58.600|T   75.650|T   75.650|    92.700
   CHAINMAN/RODMAN Q        |02/22/2012|02/28/2013**|    31.220|    11.580|R    8.720|S    3.320|     0.720|    0.160|   8.0|55.720|T   71.330|T   71.330|    86.940
# GLAZIER                   |02/22/2012|12/31/2012**|A   32.190|     9.700|U    8.890|      -   |     0.540|V   0.380|   8.0|51.700|W   67.790|    83.890|    83.890
# MARBLE FINISHER X         |08/22/2008|07/31/2009* |Y   28.020|     8.720|     2.950|I     -   |     0.450|    0.200|   8.0|40.340|Z   54.350|    68.360|    68.360
# MARBLE MASON X            |08/22/2008|07/31/2009* |Y   39.220|     8.720|     9.310|I     -   |     0.550|    0.210|   8.0|58.010|Z   77.620|    97.230|    97.230
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   BRUSH, SPRAY, PAPERHANGER|02/22/2012|12/31/2012**|AA  28.300|     9.700|     5.730|I     -   |     0.310|    0.360|D  8.0|44.400|    58.550|AB  58.550|    72.700
   SANDBLASTER, STEAM       |          |            |          |          |          |          |          |         |      |      |          |          |
   CLEANER, WATERBLASTER    |02/22/2012|12/31/2012**|AA  28.800|     9.700|     5.730|I     -   |     0.310|    0.360|D  8.0|44.900|    59.300|AB  59.300|    73.700
   EXOTIC MATERIALS         |02/22/2012|12/31/2012**|AA  29.300|     9.700|     5.730|I     -   |     0.310|    0.360|D  8.0|45.400|    60.050|AB  60.050|    74.700
   TAPER                    |02/22/2012|12/31/2012**|AC  36.190|     9.700|     8.180|AD    -   |     0.360|    0.290|   8.0|54.720|    69.670|D   69.670|AB  84.620
   TAPER CLEAN-UP AE        |02/22/2012|12/31/2012* |AF  14.450|     9.700|      -   |      -   |      -   |      -  |   8.0|24.150|    30.900|D   30.900|AB  37.660
# PLASTERER                 |08/22/2011|06/30/2012**|AG  29.190|    10.230|     7.290|     3.000|     0.900|    0.500|   8.0|51.110|    64.940|AH  64.940|    78.770
# PLASTER TENDER            |08/22/2009|06/30/2010* |    28.370|     5.540|     6.320|     2.280|     0.340|AI  1.020|   8.0|43.870|J   58.060|J   58.060|    72.240
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, STEAMFITTER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   REFRIGERATION FITTER     |          |            |          |          |          |          |          |         |      |      |          |          |
   (HVAC)                   |02/22/2012|06/30/2012* |    35.950|    10.160|    11.810|F     -   |     1.200|    1.570|   8.0|60.690|E   78.670|E   78.670|    96.640
   PIPE TRADESMAN           |02/22/2012|06/30/2012* |    13.000|     8.230|     1.000|F     -   |      -   |    0.710|   8.0|22.940|E   29.440|E   29.440|    35.940
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |08/22/2011|06/30/2012**|    26.200|     4.600|     2.600|     2.000|     0.450|    0.600|D  8.0|36.450|    49.550|    49.550|    62.650
   LANDSCAPE PIPEFITTER     |08/22/2011|06/30/2012**|    26.200|     4.600|     2.600|     2.000|     0.450|    0.550|D  8.0|36.400|    49.500|    49.500|    62.600
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN AJ  |08/22/2011|06/30/2012**|    15.000|     4.600|     2.600|     2.000|     0.450|    0.600|D  8.0|25.250|    32.750|    32.750|    40.250
   LANDSCAPE ASSISTANT      |          |            |          |          |          |          |          |         |      |      |          |          |
   JOURNEYMAN AJ            |08/22/2011|06/30/2012**|    15.000|     4.600|     2.600|     2.000|     0.450|    0.550|D  8.0|25.200|    32.700|    32.700|    40.200
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN AK             |08/22/2011|06/30/2012**|    10.400|     4.600|     2.600|     2.000|     0.450|    0.600|D  8.0|20.650|    25.850|    25.850|    31.050
   LANDSCAPE TRADESMAN I AL |08/22/2011|06/30/2012**|    10.200|     4.600|      -   |     2.000|     0.450|    0.550|D  8.0|17.800|    22.900|    22.900|    28.000
   LANDSCAPE TRADESMAN II AL|08/22/2011|06/30/2012**|    10.400|     4.600|     2.600|     2.000|     0.450|    0.550|D  8.0|20.600|    25.800|    25.800|    31.000
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND)             |02/22/2012|03/31/2012**|    32.330|     8.420|AM   9.350|      -   |     0.450|    0.250|   8.0|50.800|    66.970|    66.970|    83.130
# ROOFER                    |08/22/2011|07/31/2012* |    28.490|     7.000|     3.850|F     -   |     0.320|      -  |   8.0|39.660|    52.320|    52.320|    64.990
   PITCH WORK               |08/22/2011|07/31/2012* |    30.990|     7.000|     3.850|F     -   |     0.320|      -  |   8.0|42.160|    56.070|    56.070|    69.990
   TEAR-OFF                 |08/22/2009|07/31/2010* |    18.740|      -   |     0.500|      -   |     0.300|      -  |   8.0|19.540|    28.910|    28.910|    38.280
# SHEET METAL WORKER        |02/22/2012|06/30/2012**|H   34.640|    10.280|    14.980|F     -   |     0.650|    0.360|   8.0|60.910|AN  78.230|AN  78.230|AO  95.550
   METAL DECK & SIDING      |02/22/2012|06/30/2012* |H   33.310|    10.030|    16.910|F     -   |     0.790|    0.050|   8.0|61.090|P   77.750|P   77.750|    94.400
# TERRAZZO WORKER           |08/22/2011|06/30/2012**|AC  39.800|     9.690|    12.110|F     -   |     0.800|    0.650|   7.0|63.050|AP  80.300|AP  80.300|    97.560
   TERRAZZO FINISHER        |08/22/2011|06/30/2012**|AC  31.420|     9.690|     4.060|F     -   |     0.800|    0.650|   7.0|46.620|AP  60.500|AP  60.500|    74.380
# TILE FINISHER             |08/22/2011|03/31/2012**|A   20.560|     8.530|     3.560|     0.700|     0.350|    0.630|   8.0|34.330|    44.610|D   44.610|    54.890
   RED CIRCLED FINISHER     |08/22/2011|03/31/2012* |A   25.250|     8.530|     3.860|     1.300|     0.350|    0.530|   8.0|39.820|    52.440|D   52.440|    65.070
# TILE SETTER               |08/22/2011|03/31/2012**|A   32.060|     8.530|     4.610|     2.350|     0.540|    0.870|   8.0|48.960|    64.990|D   64.990|    81.020
  WATER WELL DRILLER        |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AQ   0.630|      -   |      -  |   8.0|17.310|AR  23.660|AR  23.660|AR  23.660
   PUMP INSTALLER           |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AQ   0.630|      -   |      -  |   8.0|17.310|AR  23.660|AR  23.660|AR  23.660
   HELPER                   |08/22/1998|12/31/1998* |    10.380|     3.200|     0.780|AS   0.520|      -   |      -  |   8.0|14.880|AR  20.070|AR  20.070|AR  20.070
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT.  EFFECTIVE AS OF JULY 1, 2008, THE ISSUANCE AND PUBLICATION OF THE PREVAILING WAGE APPRENTICE SCHEDULES/APPRENTICE
   WAGE RATES HAVE BEEN REASSIGNED BY THE DEPARTMENT OF INDUSTRIAL RELATIONS FROM THE DIVISION OF LABOR STATISTICS AND RESEARCH TO THE DIVISION OF
   APPRENTICESHIP STANDARDS.  TO OBTAIN ANY APPRENTICE SCHEDULES/APPRENTICE WAGE RATES, PLEASE CONTACT THE DIVISION OF APPRENTICESHIP STANDARDS OR REFER
   TO THE DIVISION OF APPRENTICESHIP STANDARDS' WEBSITE AT http://www.dir.ca.gov/das.das.html.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  AMOUNT INCLUDED IN FACTORING OVERTIME RATES.
C  INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND AND AN AMOUNT FOR INTERNATIONAL MASONRY INSTITUTE (IMI).
D  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
F  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I  INCLUDED IN BASIC HOURLY RATE.
J  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
K  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
L  IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES.
M  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   RATE.
N  RATE APPLIES TO WORK LOCATED 0-2 AIR MILES FROM THE INTERSECTION OF WASHINGTON STREET AND STOCKTON ROAD, SONORA(ZONE A). PLEASE CONTACT THE DIVISION
   OF LABOR STATISTICS AND RESEARCH FOR RATES OUTSIDE OF ZONE A.
O  IN ADDITION, 3.5% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE LABOR MANAGEMENT COOPERATIVE TRUST,
   CONTRACT ADMINISTRATION FUND, AND NEIF
P  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
Q  ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY.  A CREW CONSISTS OF ONE (1) OR MORE
   EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
R  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
S  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
T  RATE APPLIES TO THE FIRST 4 DAILY OT HOURS AND THE FIRST 12 OT HOURS ON SATURDAY.  ALL OTHER OT IS PAID AT 2X.
U  INCLUDES $2.50 FOR THE INDIVIDUAL ACCOUNT RETIREMENT PLAN.
V  INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
W  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND
   HOLIDAY OVERTIME RATE.
X  EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.
Y  INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
Z  RATE APPLIES TO FIRST OVERTIME HOUR ONLY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AA INCLUDES AN AMOUNT FOR DUES CHECK-OFF, WAGE EQUALITY DUES, ORGANIZING DUES, BENEFICIAL AND HOLIDAY.
AB DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AC INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AD INCLUDED IN STRAIGHT-TIME HOURLY RATE WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AE PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AF INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.
AG INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES. EMPLOYEES OPERATING AND WORKING BEHIND
   PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $2.00 PER DAY ABOVE THE WAGE RATE.
AH RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AI AMOUNT IS FOR VALLEY MORTAR TRADES FUND ($1.00) AND INDUSTRY STABILIZATION ($0.02)
AJ THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AK THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON
   EACH JOBSITE.
AL THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER  COMBINATION EMPLOYED PER CONTRACTOR ON
   EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION
   OF A JOURNEYMAN PIPEFITTER.
AM INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AN RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
AO RATE ONLY APPLIES TO SUNDAYS AND THE 7 REGULAR HOLIDAYS. PLEASE REFER TO THE HOLIDAY PROVISIONS FOR DETAILS.
AP RATE APPLIES TO THE FIRST 3 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY.  ALL OTHER TIME IS PAID AT THE
   SUNDAY/HOLIDAY OVERTIME RATE.
AQ RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
AR RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY
   ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
AS RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/DLSR/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINAT

TRAVEL AND/OR SUBSISTENCE PAYMENT: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS
   TO EACH WORKER TO EXECUTE THE WORK.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR EACH CRAFT, CLASSIFICATION, OR TYPE OF WORKER MAY BE OBTAINED FROM THE
   PREVAILING WAGE UNIT AT (415) 703-4774.