GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SANTA CLARA COUNTY

DETERMINATION: STC-2011-2

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON               |08/22/2011|04/30/2012**|A   37.130|     9.690|     9.430|B    2.500|     0.800|C   0.900|D  8.0|60.450|E   80.260|E   80.260|   100.080
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |08/22/2011|06/30/2012* |A   37.980|     9.690|     8.430|F     -   |     1.100|    0.400|D  8.0|57.600|    76.590|G   76.590|    95.580
# BRICK TENDER              |08/22/2010|06/30/2011* |H   31.490|     7.380|     6.000|F     -   |     0.340|      -  |D  8.0|45.210|E   60.960|E   60.960|    76.700
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   SOFT FLOOR LAYER         |08/22/2011|12/31/2011**|A   44.820|     9.330|     7.300|I     -   |     0.530|    0.340|   8.0|62.320|J   84.730|J   84.730|   107.140
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   AFTER 3 YEARS            |08/22/2011|12/31/2011**|A   22.390|     9.330|     3.650|I     -   |     0.050|    0.340|   8.0|35.760|J   46.950|J   46.950|    58.150
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   LESS THAN 3 YEARS        |08/22/2011|12/31/2011**|A   17.900|     9.330|     2.920|I     -   |     0.050|    0.340|   8.0|30.540|J   39.490|J   39.490|    48.440
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIRST 3 MONTHS  |08/22/2011|12/31/2011**|A   14.310|     9.330|     2.340|I     -   |     0.050|    0.340|   8.0|26.370|J   33.530|J   33.530|    40.680
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SECOND 3 MONTHS |08/22/2011|12/31/2011**|A   16.110|     9.330|     2.630|I     -   |     0.050|    0.340|   8.0|28.460|J   36.510|J   36.510|    44.570
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2011|11/20/2011* |    29.870|     7.850|K    4.000|      -   |     1.100|L   0.210|   8.0|44.080|M   59.530|M   59.530|    74.990
   COMM & SYSTEM TECH.      |02/22/2011|11/20/2011* |    34.010|     7.850|K    4.000|      -   |     1.100|L   0.210|   8.0|48.360|M   65.880|M   65.880|    83.390
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |         |      |      |          |          |
   TECHNICIAN               |08/22/2011|11/30/2011**|N   48.570|    12.480|K   12.700|      -   |     0.850|O   0.380|   8.0|76.440|P  101.450|P  101.450|   126.460
   CABLE SPLICER            |08/22/2011|11/30/2011**|N   55.860|    12.480|K   12.700|      -   |     0.850|O   0.420|   8.0|83.990|P  112.750|P  112.750|   141.520
   MATERIAL HANDLER Q       |08/22/2010|07/31/2011* |    21.720|     7.350|K    2.200|      -   |      -   |    0.220|   8.0|32.140|    43.330|    43.330|    54.510
   MATERIAL HANDLER -       |          |            |          |          |          |          |          |         |      |      |          |          |
   FOURTH SIX MONTHS Q      |08/22/2010|07/31/2011* |    18.460|     7.350|K    2.200|      -   |      -   |    0.220|   8.0|28.780|    38.290|    38.290|    47.800
   MATERIAL HANDLER - THIRD |          |            |          |          |          |          |          |         |      |      |          |          |
   SIX MONTHS Q             |08/22/2010|07/31/2011* |    16.290|     7.350|K    2.200|      -   |      -   |    0.190|   8.0|26.520|    34.910|    34.910|    43.300
   MATERIAL HANDLER -       |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND SIX MONTHS Q      |08/22/2010|07/31/2011* |    14.120|     7.350|K    2.200|      -   |      -   |    0.180|   8.0|24.270|    31.550|    31.550|    38.820
   MATERIAL HANDLER - FIRST |          |            |          |          |          |          |          |         |      |      |          |          |
   SIX MONTHS Q             |08/22/2010|07/31/2011* |    13.030|      -   |K     -   |      -   |      -   |    0.180|   8.0|13.600|    20.310|    20.310|    27.020
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY R         |08/22/2011|03/01/2012* |    37.190|    10.910|S    8.280|T    3.470|     0.720|    0.160|   8.0|60.730|U   79.320|U   79.320|    97.920
   INSTRUMENTMAN R          |08/22/2011|03/01/2012* |    34.100|    10.910|S    8.280|T    3.470|     0.720|    0.160|   8.0|57.640|U   74.690|U   74.690|    91.740
   CHAINMAN/RODMAN R        |08/22/2011|03/01/2012* |    31.220|    10.910|S    8.280|T    3.470|     0.720|    0.160|   8.0|54.760|U   70.370|U   70.370|    85.980
# GLAZIER                   |08/22/2011|12/31/2011**|A   41.880|     9.200|V   10.640|      -   |     0.500|W   0.380|   8.0|62.600|X   83.540|   104.480|   104.480
# MARBLE FINISHER Y         |08/22/2008|07/31/2009* |Z   28.020|     8.720|     2.950|I     -   |     0.450|    0.200|   8.0|40.340|AA  54.350|    68.360|    68.360
# MARBLE MASON Y            |08/22/2008|07/31/2009* |Z   39.220|     8.720|     9.310|I     -   |     0.550|    0.210|   8.0|58.010|AA  77.620|    97.230|    97.230
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   BRUSH AND SPRAY          |08/22/2011|12/31/2011**|H   32.660|     9.580|S    9.220|I     -   |     0.410|    0.380|D  8.0|52.250|    68.580|AB  68.580|    84.910
   INDUSTRIAL PAINTER       |08/22/2011|12/31/2011**|H   32.910|     9.580|S    9.220|I     -   |     0.410|    0.380|D  8.0|52.500|    68.960|AB  68.960|    85.410
   SANDBLASTER, STEAM       |          |            |          |          |          |          |          |         |      |      |          |          |
   CLEANER, WATERBLASTER    |08/22/2011|12/31/2011**|H   33.160|     9.580|S    9.220|I     -   |     0.410|    0.380|D  8.0|52.750|    69.330|AB  69.330|    85.910
   EXOTIC MATERIALS         |08/22/2011|12/31/2011**|H   33.410|     9.580|S    9.220|I     -   |     0.410|    0.380|D  8.0|53.000|    69.710|AB  69.710|    86.410
   PAPERHANGER/WALLCOVERING |08/22/2011|12/31/2011**|H   33.660|     9.580|S    9.220|I     -   |     0.410|    0.380|D  8.0|53.250|    70.080|AB  70.080|    86.910
   TAPER                    |08/22/2011|09/30/2011* |AC  40.320|     9.580|     9.580|AD    -   |     0.360|    0.210|   8.0|60.050|    76.750|D   76.750|AB  93.460
   TAPER CLEAN-UP AE        |02/22/2011|06/30/2011* |AF  15.700|     9.580|      -   |      -   |      -   |      -  |   8.0|25.280|    32.790|D   32.790|AB  40.310
# PLASTERER                 |08/22/2011|06/30/2012**|AG  29.370|    10.230|     7.290|     3.000|     0.900|    0.500|   8.0|51.290|    65.210|AH  65.210|    79.130
# PLASTER TENDER            |02/22/2010|03/31/2010* |A   32.240|     6.330|     4.300|     2.250|     0.100|AI  0.150|   8.0|45.370|AJ  61.120|AJ  61.120|    76.860
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |08/22/2011|06/30/2012**|    26.200|     4.600|     2.600|     2.000|     0.450|    0.600|D  8.0|36.450|    49.550|    49.550|    62.650
   LANDSCAPE PIPEFITTER     |08/22/2011|06/30/2012**|    26.200|     4.600|     2.600|     2.000|     0.450|    0.550|D  8.0|36.400|    49.500|    49.500|    62.600
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN AK  |08/22/2011|06/30/2012**|    15.000|     4.600|     2.600|     2.000|     0.450|    0.600|D  8.0|25.250|    32.750|    32.750|    40.250
   LANDSCAPE ASSISTANT      |          |            |          |          |          |          |          |         |      |      |          |          |
   JOURNEYMAN AK            |08/22/2011|06/30/2012**|    15.000|     4.600|     2.600|     2.000|     0.450|    0.550|D  8.0|25.200|    32.700|    32.700|    40.200
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN AL             |08/22/2011|06/30/2012**|    10.400|     4.600|     2.600|     2.000|     0.450|    0.600|D  8.0|20.650|    25.850|    25.850|    31.050
   LANDSCAPE TRADESMAN I AM |08/22/2011|06/30/2012**|    10.200|     4.600|      -   |     2.000|     0.450|    0.550|D  8.0|17.800|    22.900|    22.900|    28.000
   LANDSCAPE TRADESMAN II AM|08/22/2011|06/30/2012**|    10.400|     4.600|     2.600|     2.000|     0.450|    0.550|D  8.0|20.600|    25.800|    25.800|    31.000
   PLUMBER, STEAMFITTER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   REFRIGERATION FITTER     |          |            |          |          |          |          |          |         |      |      |          |          |
   (HVAC)                   |08/22/2011|12/31/2011**|A   53.660|AN  12.810|AO  11.570|F     -   |     1.450|AP  0.850|   8.0|80.340|E  108.420|E  108.420|   136.500
   CONSTRUCTION TRADESMAN   |          |            |          |          |          |          |          |         |      |      |          |          |
   (YEAR 2)                 |08/22/2010|06/30/2011* |A   17.230|     9.700|     0.500|F     -   |      -   |AQ  0.250|   8.0|27.680|E   36.300|E   36.300|    44.910
   CONSTRUCTION TRADESMAN   |          |            |          |          |          |          |          |         |      |      |          |          |
   (YEAR 3)                 |08/22/2010|06/30/2011* |A   22.830|     9.700|     0.500|F     -   |      -   |AQ  0.250|   8.0|33.280|E   44.700|E   44.700|    56.110
   CONSTRUCTION TRADESMAN   |          |            |          |          |          |          |          |         |      |      |          |          |
   (YEAR 4)                 |08/22/2010|06/30/2011* |A   24.210|     9.700|     0.500|F     -   |      -   |AQ  0.250|   8.0|34.660|E   46.770|E   46.770|    58.870
   CONSTRUCTION TRADESMAN   |          |            |          |          |          |          |          |         |      |      |          |          |
   (YEAR 5)                 |08/22/2010|06/30/2011* |A   27.200|     9.700|     2.250|F     -   |      -   |AQ  0.250|   8.0|39.400|E   53.000|E   53.000|    66.600
   SERVICE AND REPAIR       |08/22/2011|12/31/2011**|A   53.660|AN  12.810|AO  11.570|F     -   |     1.450|AP  0.850|   8.0|80.340|   108.420|AR 108.420|   108.420
   SPRINKLER FITTER (FIRE   |          |            |          |          |          |          |          |         |      |      |          |          |
   PROTECTION AND FIRE      |          |            |          |          |          |          |          |         |      |      |          |          |
   CONTROL SYSTEMS)         |08/22/2011|12/31/2011**|A   50.590|     8.200|    13.200|F     -   |     1.100|    1.600|   8.0|74.690|    99.990|    99.990|   125.280
# ROOFER                    |          |            |          |          |          |          |          |         |      |      |          |          |
   ROOFER, KETTLEMAN        |08/22/2011|07/31/2012**|AF  32.430|     7.000|     3.900|     3.150|     1.200|    0.450|   8.0|48.130|AS  63.790|AT  79.450|    79.450
   HELPER                   |08/22/2011|07/31/2012**|AF  29.300|     7.000|     3.900|     3.150|     1.200|    0.450|   8.0|45.000|AS  59.090|AT  73.190|    73.190
   KETTLEMAN (2 KETTLES)    |08/22/2011|07/31/2012**|AF  34.430|     7.000|     3.900|     3.150|     1.200|    0.450|   8.0|50.130|AS  66.790|AT  83.450|    83.450
   BITUMASTIC, ENAMELER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   COAL TAR, PITCH AND      |          |            |          |          |          |          |          |         |      |      |          |          |
   MASTIC WORKER            |08/22/2011|07/31/2012**|AF  34.430|     7.000|     3.900|     3.150|     1.200|    0.450|   8.0|50.130|AS  66.790|AT  83.450|    83.450
# SHEET METAL WORKER        |08/22/2011|12/31/2011**|H   46.850|    12.610|    17.320|F     -   |     1.210|    0.990|   8.0|78.980|AU 102.400|AU 102.400|   125.830
   TOTAL SHEET METAL        |          |            |          |          |          |          |          |         |      |      |          |          |
   CONTRACT OF $200,000 OR  |          |            |          |          |          |          |          |         |      |      |          |          |
   LESS                     |08/22/2011|12/31/2011**|H   42.470|    12.610|    17.020|F     -   |     1.210|    0.990|   8.0|74.300|AU  95.540|AU  95.540|   116.770
   SERVICE MECHANIC (TOTAL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SHEET METAL CONTRACT OF  |          |            |          |          |          |          |          |         |      |      |          |          |
   $200,000 OR LESS)        |08/22/2011|12/31/2011**|H   30.310|    12.240|    10.990|F     -   |     1.210|    0.990|   8.0|55.740|AV  70.900|AV  70.900|    86.050
   SERVICE TECHNICIAN       |          |            |          |          |          |          |          |         |      |      |          |          |
   (TOTAL SHEET METAL       |          |            |          |          |          |          |          |         |      |      |          |          |
   CONTRACT OF $200,000 OR  |          |            |          |          |          |          |          |         |      |      |          |          |
   LESS)                    |08/22/2011|12/31/2011**|H   26.370|    12.240|     7.660|F     -   |     1.210|    0.990|   8.0|48.470|AV  61.650|AV  61.650|    74.840
   AIR CONDITIONING         |          |            |          |          |          |          |          |         |      |      |          |          |
   SPECIALIST (TOTAL SHEET  |          |            |          |          |          |          |          |         |      |      |          |          |
   METAL CONTRACT OF        |          |            |          |          |          |          |          |         |      |      |          |          |
   $200,000 OR LESS)        |08/22/2011|12/31/2011**|H   23.350|    12.240|     3.240|F     -   |     1.190|    0.990|   8.0|41.010|AU  52.690|AU  52.690|    64.360
   METAL DECK & SIDING      |08/22/2011|06/30/2012* |H   32.430|    13.030|    15.330|F     -   |     0.300|      -  |   8.0|61.090|AU  77.310|AU  77.310|    93.520
# TERRAZZO WORKER           |08/22/2011|06/30/2012**|AC  39.800|     9.690|    12.110|F     -   |     0.800|    0.650|   7.0|63.050|AW  80.300|AW  80.300|    97.560
   TERRAZZO FINISHER        |08/22/2011|06/30/2012**|AC  31.420|     9.690|     4.060|F     -   |     0.800|    0.650|   7.0|46.620|AW  60.500|AW  60.500|    74.380
# TILE FINISHER             |08/22/2011|03/31/2012**|A   20.740|     8.530|     3.380|     0.700|     0.400|    0.630|   8.0|34.380|    44.750|D   44.750|    55.120
   RED CIRCLED FINISHER     |08/22/2011|03/31/2012* |A   26.500|     8.530|     3.610|     1.300|     0.300|    0.530|   8.0|40.770|    54.020|D   54.020|    67.270
# TILE SETTER               |08/22/2011|03/31/2012**|A   36.260|     8.530|     4.610|     2.350|     0.590|    0.870|   8.0|53.210|    71.340|D   71.340|    89.470
  WATER WELL DRILLER        |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AX   0.630|      -   |      -  |   8.0|17.310|AY  23.660|AY  23.660|AY  23.660
   PUMP INSTALLER           |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AX   0.630|      -   |      -  |   8.0|17.310|AY  23.660|AY  23.660|AY  23.660
   HELPER                   |08/22/1998|12/31/1998* |    10.380|     3.200|     0.780|AZ   0.520|      -   |      -  |   8.0|14.880|AY  20.070|AY  20.070|AY  20.070
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT.  EFFECTIVE AS OF JULY 1, 2008, THE ISSUANCE AND PUBLICATION OF THE PREVAILING WAGE APPRENTICE SCHEDULES/APPRENTICE
   WAGE RATES HAVE BEEN REASSIGNED BY THE DEPARTMENT OF INDUSTRIAL RELATIONS FROM THE DIVISION OF LABOR STATISTICS AND RESEARCH TO THE DIVISION OF
   APPRENTICESHIP STANDARDS.  TO OBTAIN ANY APPRENTICE SCHEDULES/APPRENTICE WAGE RATES, PLEASE CONTACT THE DIVISION OF APPRENTICESHIP STANDARDS OR REFER
   TO THE DIVISION OF APPRENTICESHIP STANDARDS' WEBSITE AT http://www.dir.ca.gov/das.das.html.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  AMOUNT INCLUDED IN FACTORING OVERTIME RATES.
C  INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND AND AN AMOUNT FOR INTERNATIONAL MASONRY INSTITUTE (IMI).
D  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
F  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I  INCLUDED IN BASIC HOURLY RATE.
J  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
K  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
L  IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES.
M  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   RATE.
N  INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
O  INCLUDES AMOUNT EQUAL TO 0.5% OF THE HOURLY RATE FOR THE ADMINISTRATIVE MAINTENANCE FUND AND THE REMAINING AMOUNT IS FOR THE JOINT ELECTRICAL INDUSTRY
   FUND.
P  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS UP TO A MAXIMUM OF 10 HOURS IN ANY ONE WEEK OR THE FIRST 8 HOURS WORKED ON SATURDAY IF NO OVERTIME
   HAS BEEN WORKED DURING THE WEEK.  IF OVERTIME IS WORKED MONDAY THROUGH FRIDAY, SUBTRACT THAT AMOUNT OF TIME FROM THE TIME ALLOWED AT TIME AND ONE HALF
   (1 1/2) ON SATURDAY.  ALL OTHER TIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
Q  THE MATERIAL HANDLER MAY BE UTILIZED IN CONJUNCTION WITH BOTH INSIDE AND LINE PROJECTS. THE RATIO OF MATERIAL HANDLER TO JOURNEYMEN SHALL BE ONE (1)
   MATERIAL HANDLER TO THREE (3) JOURNEYMEN.
R  ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY.  A CREW CONSISTS OF ONE (1) OR MORE
   EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
S  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
T  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
U  RATE APPLIES TO THE FIRST 4 DAILY OT HOURS AND THE FIRST 12 OT HOURS ON SATURDAY.  ALL OTHER OT IS PAID AT 2X.
V  INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
W  INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
X  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND
   HOLIDAY OVERTIME RATE.
Y  EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.
Z  INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AA RATE APPLIES TO FIRST OVERTIME HOUR ONLY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AB DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AC INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AD INCLUDED IN STRAIGHT-TIME HOURLY RATE WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AE PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AF INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.
AG INCLUDES AN AMOUNT WITHHELD FOR DUES CHECKOFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.  EMPLOYEES WORKING ON AND BEHIND PLASTER GUNS
   SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE.
AH RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AI AMOUNT IS FOR INDUSTRY PROMOTION FUND.
AJ ALL HOURS OVER 48 HOURS PER WEEK ARE AT THE SUNDAY & HOLIDAY RATE
AK THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AL THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON
   EACH JOBSITE.
AM THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER  COMBINATION EMPLOYED PER CONTRACTOR ON
   EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION
   OF A JOURNEYMAN PIPEFITTER.
AN INCLUDES AN AMOUNT FOR HEALTH AND WELFARE EXTENDED RESERVE WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.
AO INCLUDES AN AMOUNT FOR 401A-PART B PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.
AP $0.50 TO SUPPLEMENTAL UNEMPLOYMENT.
AQ AMOUNT IS FOR CONTRACT ADMINISTRATION
AR SATURDAY MAY BE PAID AT STRAIGHT TIME IF THE WORK WEEK IS TUESDAY THROUGH SATURDAY.
AS RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AT IN THE EVENT THAT CONDITIONS ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK PREVENT EMPLOYEES FROM WORKING ON SCHEDULED WORK DURING SUCH WEEK, WORK
   MAY BE PERFORMED ON SATURDAY AT STRAIGHT TIME RATES OF PAY.
AU RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
AV RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS.  ALL OTHER OVERTIME
   HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AW RATE APPLIES TO THE FIRST 3 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY.  ALL OTHER TIME IS PAID AT THE
   SUNDAY/HOLIDAY OVERTIME RATE.
AX RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
AY RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY
   ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
AZ RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/DLSR/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINAT

TRAVEL AND/OR SUBSISTENCE PAYMENT: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS
   TO EACH WORKER TO EXECUTE THE WORK.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR EACH CRAFT, CLASSIFICATION, OR TYPE OF WORKER MAY BE OBTAINED FROM THE
   PREVAILING WAGE UNIT AT (415) 703-4774.