GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: HUMBOLDT COUNTY

DETERMINATION: HUM-2010-1

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON               |08/22/2009|04/30/2010**|A   35.330|     9.060|     9.260|B    3.400|     0.650|C   0.650|D  8.0|58.350|E   77.720|E   77.720|    97.080
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |02/22/2010|06/30/2010**|A   37.480|     9.060|     7.060|F     -   |     0.850|    0.400|D  8.0|54.850|    73.590|G   73.590|    92.330
# BRICK TENDER              |08/22/2009|06/30/2010**|H   29.560|     5.540|     6.770|F     -   |     0.340|      -  |D  8.0|42.210|E   56.990|E   56.990|    71.770
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   RESILIENT TILE LAYER     |08/22/2009|05/30/2010* |A   25.640|I    4.650|     2.200|J    1.980|     0.200|    0.110|   8.0|34.780|    62.400|K   48.590|    62.400
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2010|11/30/2010**|    29.870|     7.350|L    4.000|      -   |     1.100|M   0.210|   8.0|43.580|N   59.030|N   59.030|    74.490
   COMM & SYSTEM TECH.      |02/22/2010|11/30/2010**|    34.010|     7.350|L    4.000|      -   |     1.100|M   0.210|   8.0|47.860|N   65.380|N   65.380|    82.890
   INSIDE WIREMAN           |08/22/2009|05/31/2010**|A   44.000|     8.000|L    4.000|      -   |     1.000|    0.310|   8.0|58.630|O   81.290|O   81.290|   103.950
   CABLE SPLICER            |08/22/2009|05/31/2010**|A   48.400|     8.000|L    4.000|      -   |     1.000|    0.310|   8.0|63.160|O   88.090|O   88.090|   113.010
   TUNNEL WIREMAN           |08/22/2009|05/31/2010**|A   44.500|     8.000|L    4.000|      -   |     1.000|    0.310|   8.0|59.150|O   82.060|O   82.060|   104.980
   TUNNEL CABLE SPLICER     |08/22/2009|05/31/2010**|A   48.900|     8.000|L    4.000|      -   |     1.000|    0.310|   8.0|63.680|O   88.860|O   88.860|   114.040
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-010) P          |02/22/2010|02/28/2011**|    36.440|    10.560|Q    7.640|R    3.390|     0.640|    0.160|   8.0|58.830|S   77.050|S   77.050|    95.270
   INSTRUMENTMAN            |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-034) P          |02/22/2010|02/28/2011**|    33.350|    10.560|Q    7.640|R    3.390|     0.640|    0.160|   8.0|55.740|S   72.410|S   72.410|    89.090
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |         |      |      |          |          |
   (869.567-010) P          |02/22/2010|02/28/2011**|    30.470|    10.560|Q    7.640|R    3.390|     0.640|    0.160|   8.0|52.860|S   68.100|S   68.100|    83.330
# GLAZIER                   |08/22/1997|08/31/1998* |&   10.000|      -   |      -   |     0.190|      -   |      -  |   8.0|10.190|    15.190|    15.190|    15.190
# MARBLE FINISHER T         |08/22/2008|07/31/2009* |U   28.020|     8.720|     2.950|V     -   |     0.450|    0.200|   8.0|40.340|W   54.350|    68.360|    68.360
# MARBLE MASON T            |08/22/2008|07/31/2009* |U   39.220|     8.720|     9.310|V     -   |     0.550|    0.210|   8.0|58.010|W   77.620|    97.230|    97.230
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   TAPER                    |08/22/2009|06/30/2010**|A   33.480|     6.790|     7.180|     3.500|     0.360|    0.210|   8.0|51.520|    68.260|D   68.260|X   85.000
   TAPER CLEAN-UP Y         |08/22/2009|06/30/2010* |A   15.310|     6.790|      -   |      -   |      -   |      -  |   8.0|22.100|    29.760|D   29.760|X   37.410
   BRUSH & ROLLER           |02/19/1994|05/31/1994* |    13.950|     2.060|     0.900|     1.000|     0.020|      -  |   8.0|17.930|Z   24.900|    24.900|AA  31.880
   PAPERHANGER,             |          |            |          |          |          |          |          |         |      |      |          |          |
   SANDBLASTER, SPRAY       |          |            |          |          |          |          |          |         |      |      |          |          |
   PAINTER, STRUCTURAL STEEL|08/22/1998|09/30/1998* |    14.200|     2.060|     0.900|     1.000|     0.020|      -  |   8.0|18.180|Z   25.280|    25.280|AA  32.380
# PLASTERER                 |02/22/2010|06/30/2010**|AB  28.570|     8.230|     6.120|     4.250|     0.950|    0.550|   8.0|48.670|    62.220|K   62.220|    75.770
# PLASTER TENDER            |08/22/2009|06/30/2010* |    28.370|     5.540|     6.320|     2.280|     0.340|AC  1.020|   8.0|43.870|AD  58.060|AD  58.060|    72.240
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, PIPEFITTER      |02/22/2010|03/31/2010**|A   35.690|     9.460|     7.850|F     -   |     1.050|AE  0.160|   8.0|54.210|AF  72.050|AF  72.050|    89.900
   LIGHT COMMERCIAL PLUMBER |          |            |          |          |          |          |          |         |      |      |          |          |
   (LESS THAN 20,000 SQUARE |          |            |          |          |          |          |          |         |      |      |          |          |
   FEET OR 20 PLUMBING      |          |            |          |          |          |          |          |         |      |      |          |          |
   FIXTURES)                |02/22/2010|03/31/2010**|A   24.400|     9.460|     7.350|F     -   |     0.580|AE  0.160|   8.0|41.950|AF  54.150|AF  54.150|    66.350
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |08/22/2009|06/30/2010**|    25.450|     3.950|     2.500|     1.900|     0.400|    0.600|D  8.0|34.800|    47.530|    47.530|    60.250
   LANDSCAPE PIPEFITTER     |08/22/2009|06/30/2010**|    25.450|     3.950|     2.500|     1.900|     0.400|    0.550|D  8.0|34.750|    47.480|    47.480|    60.200
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN AG  |08/22/2009|06/30/2010**|    14.250|     3.950|     2.500|     1.900|     0.400|    0.600|D  8.0|23.600|    30.720|    30.720|    37.850
   LANDSCAPE ASSISTANT      |          |            |          |          |          |          |          |         |      |      |          |          |
   JOURNEYMAN AG            |08/22/2009|06/30/2010**|    14.250|     3.950|     2.500|     1.900|     0.400|    0.550|D  8.0|23.550|    30.670|    30.670|    37.800
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN AG             |08/22/2009|06/30/2010**|     9.950|     3.950|     2.500|     1.900|     0.400|    0.600|D  8.0|19.300|    24.270|    24.270|    29.250
   LANDSCAPE TRADESMAN I AH |08/22/2009|06/30/2010**|     9.950|     3.950|      -   |     1.900|     0.400|    0.550|D  8.0|16.750|    21.720|    21.720|    26.700
   LANDSCAPE TRADESMAN II AH|08/22/2009|06/30/2010**|     9.950|     3.950|     2.500|     1.900|     0.400|    0.550|D  8.0|19.250|    24.220|    24.220|    29.200
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND)             |02/22/2010|03/31/2010* |    33.350|     7.600|AI   9.700|      -   |     0.300|    0.250|   8.0|51.200|    67.880|    67.880|    84.550
# ROOFER                    |02/22/2000|03/31/2000* |&   10.000|      -   |      -   |      -   |     2.000|      -  |   8.0|12.000|    17.000|    17.000|    17.000
# SHEET METAL WORKER        |08/22/2009|06/30/2010**|H   47.730|    10.670|    14.380|F     -   |     1.210|    0.990|   8.0|74.980|O   98.850|O   98.850|   122.710
   TOTAL SHEET METAL        |          |            |          |          |          |          |          |         |      |      |          |          |
   CONTRACT OF $200,000 OR  |          |            |          |          |          |          |          |         |      |      |          |          |
   LESS                     |08/22/2009|06/30/2010**|H   43.320|    10.670|    14.110|F     -   |     1.210|    0.990|   8.0|70.300|O   91.960|O   91.960|   113.620
   SERVICE MECHANIC         |08/22/2009|06/30/2010**|H   32.730|     8.860|     9.130|F     -   |     1.210|    0.990|   8.0|52.920|AJ  69.290|AJ  69.290|    85.650
   SERVICE TECHNICIAN       |08/22/2009|06/30/2010**|H   28.440|     8.860|     6.520|F     -   |     1.210|    0.990|   8.0|46.020|AJ  60.240|AJ  60.240|    74.460
   AIR CONDITIONING         |          |            |          |          |          |          |          |         |      |      |          |          |
   SPECIALIST               |08/22/2009|06/30/2010**|H   25.090|     8.860|     2.780|F     -   |     1.190|    0.990|   8.0|38.910|O   51.460|O   51.460|    64.000
   METAL DECK & SIDING      |08/22/2009|06/30/2010* |H   33.340|    11.090|    12.940|F     -   |     0.280|      -  |   8.0|57.650|O   74.320|O   74.320|    90.990
# TERRAZZO WORKER           |08/22/2009|06/30/2010**|AK  38.930|     9.060|     9.860|F     -   |     0.400|    0.400|   7.0|58.650|AL  75.530|AL  75.530|    92.420
   TERRAZZO FINISHER        |08/22/2009|06/30/2010**|AK  30.250|     7.310|     3.860|F     -   |     0.400|    0.400|   7.0|42.220|AL  55.950|AL  55.950|    69.690
# TILE FINISHER             |08/22/2009|03/31/2010**|A   20.640|     7.310|     3.180|     0.700|     0.400|    0.430|   8.0|32.660|    42.980|D   42.980|    53.300
   RED CIRCLED FINISHER     |08/22/2009|03/31/2010**|A   26.400|     7.310|     3.410|     1.300|     0.400|    0.430|   8.0|39.250|    52.450|D   52.450|    65.650
# TILE SETTER               |08/22/2009|03/31/2010**|A   36.160|     7.310|     4.410|     2.350|     0.450|    0.530|   8.0|51.210|    69.290|D   69.290|    87.370
  WATER WELL DRILLER        |          |            |          |          |          |          |          |         |      |      |          |          |
   DRILLER, PUMP REPAIRMAN  |08/22/2007|01/31/2008* |    20.170|     8.120|     3.690|AM   0.800|      -   |      -  |   8.0|32.780|AN  42.870|AN  42.870|AN  42.870
   PUMP INSTALLER           |08/22/2007|01/31/2008* |    17.860|     8.120|     3.690|AO   0.720|      -   |      -  |   8.0|30.390|AN  39.320|AN  39.320|AN  39.320
   HELPER                   |08/22/2007|01/31/2008* |    12.470|     8.120|     3.690|AP   0.530|      -   |      -  |   8.0|24.810|AN  31.040|AN  31.040|AN  31.040
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT.  EFFECTIVE AS OF JULY 1, 2008, THE ISSUANCE AND PUBLICATION OF THE PREVAILING WAGE APPRENTICE SCHEDULES/APPRENTICE
   WAGE RATES HAVE BEEN REASSIGNED BY THE DEPARTMENT OF INDUSTRIAL RELATIONS FROM THE DIVISION OF LABOR STATISTICS AND RESEARCH TO THE DIVISION OF
   APPRENTICESHIP STANDARDS.  TO OBTAIN ANY APPRENTICE SCHEDULES/APPRENTICE WAGE RATES, PLEASE CONTACT THE DIVISION OF APPRENTICESHIP STANDARDS OR REFER
   TO THE DIVISION OF APPRENTICESHIP STANDARDS' WEBSITE AT http://www.dir.ca.gov/das.das.html.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  AMOUNT INCLUDED IN FACTORING OVERTIME RATES.
C  INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND AND AN AMOUNT FOR INTERNATIONAL MASONRY INSTITUTE (IMI).
D  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
F  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I  THE HEALTH & WELFARE CONTRIBUTION IS REQUIRED FOR EACH HOUR WORKED UP TO A MAXIMUM OF 40 HOURS IN ANY ONE WEEK. THIS COULD AFFECT EITHER THE TOTAL
   HOURLY RATE OR THE OVERTIME HOURLY RATES.
J  AMOUNT IS EQUAL TO 8% OF THE HOURLY RATE AND  IS FACTORED AT THE APPLICABLE OVERTIME HOURLY RATES.
K  RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
L  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
M  IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES.
N  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   RATE.
O  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
P  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
Q  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
R  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
S  RATE APPLIES TO THE FIRST 4 DAILY OT HOURS AND THE FIRST 12 OT HOURS ON SATURDAY.  ALL OTHER OT IS PAID AT 2X.
T  EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.
U  INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
V  INCLUDED IN BASIC HOURLY RATE.
W  RATE APPLIES TO FIRST OVERTIME HOUR ONLY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
X  DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
Y  PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
Z  PURSUANT TO SECTION 1815 OF THE LABOR CODE, "WORK PERFORMED BY EMPLOYEES OF CONTRACTORS IN EXCESS OF 8 HOURS PER DAY, AND 40 HOURS DURING ANY ONE
   WEEK, SHALL BE PERMITTED UPON PUBLIC WORK UPON COMPENSATION FOR ALL HOURS WORKED IN EXCESS OF 8 HOURS PER DAY AT NOT LESS THAN 1-1/2 TIMES THE BASIC
   RATE OF PAY."
AA RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
AB INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES. EMPLOYEES OPERATING AND WORKING BEHIND
   PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $2.00 PER DAY ABOVE THE WAGE RATE.
AC AMOUNT IS FOR VALLEY MORTAR TRADES FUND ($1.00) AND INDUSTRY STABILIZATION ($0.02)
AD RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
AE AMOUNT IS FOR EDUCATION REIMBURSEMENT
AF RATE APPLIES TO THE FIRST 4 HOURS MONDAY THROUGH FRIDAY AND FIRST 10 HOURS ON SATURDAY; ALL OTHERTIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AG THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AH THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT
   PERIOD, MAY BE PERFORMED BY LANDSCAPE IRRIGATION TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN.
AI INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AJ RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS.  ALL OTHER OVERTIME
   HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AK INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AL RATE APPLIES TO THE FIRST 3 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY.  ALL OTHER TIME IS PAID AT THE
   SUNDAY/HOLIDAY OVERTIME RATE.
AM RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.35 AFTER 2 YEARS; $1.45 AFTER 5 YEARS; $1.60 AFTER 10 YEARS
AN COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
AO RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.27 AFTER 2 YEARS; $1.37 AFTER 5 YEARS; $1.52 AFTER 10 YEARS.
AP RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.08 AFTER 2 YEARS; $1.18 AFTER 5 YEARS; $1.33 AFTER 10 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/DLSR/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINAT

TRAVEL AND/OR SUBSISTENCE PAYMENT: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS
   TO EACH WORKER TO EXECUTE THE WORK.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR EACH CRAFT, CLASSIFICATION, OR TYPE OF WORKER MAY BE OBTAINED FROM THE
   PREVAILING WAGE UNIT AT (415) 703-4774.