GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: NAPA COUNTY

DETERMINATION: NAP-2009-1

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON               |08/22/2008|04/30/2009**|A   34.580|     8.720|     8.050|B    3.400|     0.550|C   0.650|D  8.0|55.950|E   74.940|E   74.940|    93.930
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |08/22/2008|06/30/2009* |A   37.480|     8.820|     6.400|F     -   |     0.750|    0.400|D  8.0|53.850|    72.590|G   72.590|    91.330
# BRICK TENDER              |02/22/2009|06/30/2009**|H   28.560|     5.540|     5.970|F     -   |     0.340|      -  |D  8.0|40.410|E   54.690|E   54.690|    68.970
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   SOFT FLOOR LAYER         |02/22/2009|06/30/2009**|A   41.110|     6.540|     7.300|I     -   |     0.530|    0.340|   8.0|55.820|J   76.380|J   76.380|    96.930
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   AFTER 3 YEARS            |02/22/2009|06/30/2009* |A   20.530|     6.540|     3.650|I     -   |      -   |    0.340|   8.0|31.060|J   41.330|J   41.330|    51.590
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   LESS THAN 3 YEARS        |02/22/2009|06/30/2009* |A   16.410|     6.540|     2.920|I     -   |      -   |    0.340|   8.0|26.210|J   34.420|J   34.420|    42.620
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIRST 3 MONTHS  |02/22/2009|06/30/2009* |A   13.110|     6.540|     2.340|I     -   |      -   |    0.340|   8.0|22.330|J   28.880|J   28.880|    35.440
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SECOND 3 MONTHS |02/22/2009|06/30/2009* |A   14.760|     6.540|     2.630|I     -   |      -   |    0.340|   8.0|24.270|J   31.650|J   31.650|    39.030
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2009|11/30/2009* |    29.870|     6.850|K    4.000|      -   |     1.100|L   0.210|   8.0|43.080|M   58.530|M   58.530|    73.990
   COMM & SYSTEM TECH.      |02/22/2009|11/30/2009* |    34.010|     6.850|K    4.000|      -   |     1.100|L   0.210|   8.0|47.360|M   64.880|M   64.880|    82.390
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |         |      |      |          |          |
   TECHNICIAN               |08/22/2008|05/31/2009**|A   40.750|    10.580|K    4.450|      -   |     0.880|N   0.950|   8.0|59.020|E   80.480|E   80.480|   101.940
   CABLE SPLICER            |08/22/2008|05/31/2009**|A   45.840|    10.580|K    4.450|      -   |     0.880|N   1.070|   8.0|64.390|E   88.530|E   88.530|   112.670
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-010) O          |02/22/2009|02/28/2010**|    35.240|    10.560|P    7.570|Q    3.360|     0.640|    0.160|   8.0|57.530|R   75.150|R   75.150|    92.770
   INSTRUMENTMAN            |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-034) O          |02/22/2009|02/28/2010**|    32.150|    10.560|P    7.570|Q    3.360|     0.640|    0.160|   8.0|54.440|R   70.510|R   70.510|    86.590
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |         |      |      |          |          |
   (869.567-010) O          |02/22/2009|02/28/2010**|    29.270|    10.560|P    7.570|Q    3.360|     0.640|    0.160|   8.0|51.560|R   66.190|R   66.190|    80.830
# GLAZIER                   |02/22/2009|06/30/2009**|A   39.310|     6.410|S   10.050|      -   |     0.450|T   0.380|   8.0|56.600|U   76.260|    95.910|    95.910
# MARBLE FINISHER V         |08/22/2008|07/31/2009* |W   28.020|     8.720|     2.950|I     -   |     0.450|    0.200|   8.0|40.340|X   54.350|    68.360|    68.360
# MARBLE MASON V            |08/22/2008|07/31/2009* |W   39.220|     8.720|     9.310|I     -   |     0.550|    0.210|   8.0|58.010|X   77.620|    97.230|    97.230
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   BRUSH AND SPRAY          |02/22/2009|06/30/2009* |H   33.750|     6.790|P    8.220|I     -   |     0.360|    0.380|D  8.0|49.500|    66.380|Y   66.380|    83.250
   INDUSTRIAL PAINTER       |02/22/2009|06/30/2009* |H   34.000|     6.790|P    8.220|I     -   |     0.360|    0.380|D  8.0|49.750|    66.750|Y   66.750|    83.750
   SANDBLASTER, STEAM       |          |            |          |          |          |          |          |         |      |      |          |          |
   CLEANER, WATERBLASTER    |02/22/2009|06/30/2009* |H   34.250|     6.790|P    8.220|I     -   |     0.360|    0.380|D  8.0|50.000|    67.130|Y   67.130|    84.250
   EXOTIC MATERIALS         |02/22/2009|06/30/2009* |H   34.500|     6.790|P    8.220|I     -   |     0.360|    0.380|D  8.0|50.250|    67.500|Y   67.500|    84.750
   PAPERHANGER/WALLCOVERING |02/22/2009|06/30/2009* |H   34.750|     6.790|P    8.220|I     -   |     0.360|    0.380|D  8.0|50.500|    67.880|Y   67.880|    85.250
   TAPER                    |02/22/2009|06/30/2009**|A   35.660|     6.790|     8.080|     3.000|     0.310|    0.210|   8.0|54.050|    71.880|D   71.880|Y   89.710
   TAPER CLEAN-UP Z         |02/22/2009|06/30/2009* |A   16.400|     6.790|      -   |      -   |      -   |      -  |   8.0|23.190|    31.390|D   31.390|Y   39.590
# PLASTERER                 |08/22/2008|06/30/2009* |AA  28.570|     7.980|     5.570|     4.250|     0.950|    0.550|   8.0|47.870|    61.420|AB  61.420|    74.970
# PLASTER TENDER            |08/22/2008|06/30/2009**|    27.170|     5.540|     5.520|     2.280|     0.340|AC  1.020|   8.0|41.870|J   55.460|J   55.460|    69.040
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, STEAMFITTER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   REFRIGERATION FITTER     |          |            |          |          |          |          |          |         |      |      |          |          |
   (HVAC)                   |02/22/2009|06/30/2009**|AD  41.950|     8.650|     8.550|      -   |     1.050|    0.740|   8.0|60.940|E   81.920|E   81.920|   102.890
   PLUMBER, STEAMFITTER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   REFRIGERATION FITTER     |          |            |          |          |          |          |          |         |      |      |          |          |
   (HVAC) FOR TOTAL         |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBING BID OF $250,000 |          |            |          |          |          |          |          |         |      |      |          |          |
   OR LESS.                 |02/22/2009|06/30/2009**|AD  30.600|     8.400|     7.300|      -   |     0.900|    0.490|D  8.0|47.690|E   62.990|E   62.990|    78.290
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |08/22/2008|06/30/2009**|    24.950|     3.700|     2.400|     1.800|     0.350|    0.600|D  8.0|33.800|    46.280|    46.280|    58.750
   LANDSCAPE PIPEFITTER     |08/22/2008|06/30/2009**|    24.950|     3.700|     2.400|     1.800|     0.350|    0.550|D  8.0|33.750|    46.230|    46.230|    58.700
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN AE  |08/22/2008|06/30/2009**|    13.950|     3.700|     2.400|     1.800|     0.350|    0.600|D  8.0|22.800|    29.770|    29.770|    36.750
   LANDSCAPE ASSISTANT      |          |            |          |          |          |          |          |         |      |      |          |          |
   JOURNEYMAN AE            |08/22/2008|06/30/2009**|    13.950|     3.700|     2.400|     1.800|     0.350|    0.550|D  8.0|22.750|    29.720|    29.720|    36.700
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN AE             |08/22/2008|06/30/2009**|     9.750|     3.700|     2.400|     1.800|     0.350|    0.600|D  8.0|18.600|    23.480|    23.480|    28.350
   LANDSCAPE TRADESMAN I AF |08/22/2008|06/30/2009**|     9.750|     3.700|      -   |     1.800|     0.350|    0.550|D  8.0|16.150|    21.020|    21.020|    25.900
   LANDSCAPE TRADESMAN II AF|08/22/2008|06/30/2009**|     9.750|     3.700|     2.400|     1.800|     0.350|    0.550|D  8.0|18.550|    23.420|    23.420|    28.300
   SPRINKLER FITTER (FIRE   |          |            |          |          |          |          |          |         |      |      |          |          |
   PROTECTION AND FIRE      |          |            |          |          |          |          |          |         |      |      |          |          |
   CONTROL SYSTEMS)         |02/22/2009|08/02/2009**|A   45.590|     7.800|    11.300|F     -   |     0.850|    0.300|   8.0|65.840|    88.640|    88.640|   111.430
# ROOFER                    |08/22/2008|07/31/2009**|    29.950|     5.790|     3.450|     3.110|     0.300|    0.350|D  8.0|42.950|    57.930|    57.930|    72.900
   BITUMASTIC, ENAMELER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPE WRAPPER, COAL TAR   |          |            |          |          |          |          |          |         |      |      |          |          |
   PITCH BUILD-UP           |08/22/2008|07/31/2009**|    31.950|     5.790|     3.450|     3.110|     0.300|    0.350|D  8.0|44.950|    60.930|    60.930|    76.900
   MASTIC WORKER, KETTLEMAN |08/22/2008|07/31/2009**|    30.200|     5.790|     3.450|     3.110|     0.300|    0.350|D  8.0|43.200|    58.300|    58.300|    73.400
# SHEET METAL WORKER        |02/22/2009|06/30/2009**|H   47.730|     9.700|    11.850|F     -   |     1.210|    0.990|   8.0|71.480|AG  95.350|AG  95.350|   119.210
   TOTAL SHEET METAL        |          |            |          |          |          |          |          |         |      |      |          |          |
   CONTRACT OF $200,000 OR  |          |            |          |          |          |          |          |         |      |      |          |          |
   LESS                     |02/22/2009|06/30/2009**|H   43.320|     9.700|    11.580|F     -   |     1.210|    0.990|   8.0|66.800|AG  88.460|AG  88.460|   110.120
   SERVICE MECHANIC         |02/22/2009|06/30/2009**|H   32.680|     7.890|     7.680|F     -   |     1.210|    0.990|   8.0|50.450|AH  66.790|AH  66.790|    83.130
   SERVICE TECHNICIAN       |02/22/2009|06/30/2009**|H   28.150|     7.890|     5.630|F     -   |     1.210|    0.990|   8.0|43.870|AH  57.940|AH  57.940|    72.020
   AIR CONDITIONING         |          |            |          |          |          |          |          |         |      |      |          |          |
   SPECIALIST               |02/22/2009|06/30/2009**|H   24.630|     7.890|     2.410|F     -   |     1.190|    0.990|   8.0|37.110|AG  49.420|AG  49.420|    61.740
   METAL DECK & SIDING      |08/22/2008|06/30/2009* |H   33.430|    10.120|    11.070|F     -   |     0.280|      -  |   8.0|54.900|AG  71.610|AG  71.610|    88.330
# TERRAZZO WORKER           |08/22/2008|06/30/2009**|AI  38.180|     8.720|     8.800|F     -   |     0.150|    0.400|   7.0|56.250|AJ  72.790|AJ  72.790|    89.340
   TERRAZZO FINISHER        |08/22/2008|06/30/2009**|AI  28.810|     6.910|     3.550|F     -   |     0.150|    0.400|   7.0|39.820|AJ  53.020|AJ  53.020|    66.220
# TILE FINISHER             |08/22/2008|03/31/2009**|A   20.200|     6.910|     2.870|     0.700|     0.300|    0.530|   8.0|31.510|    41.610|D   41.610|    51.710
   RED CIRCLED FINISHER     |08/22/2008|03/31/2009**|A   25.960|     6.910|     3.100|     1.300|     0.300|    0.530|   8.0|38.100|    51.080|D   51.080|    64.060
# TILE SETTER               |08/22/2008|03/31/2009**|A   35.220|     6.910|     4.100|     2.350|     0.350|    0.530|   8.0|49.460|    67.070|D   67.070|    84.680
  WATER WELL DRILLER        |          |            |          |          |          |          |          |         |      |      |          |          |
   DRILLER, PUMP REPAIRMAN  |08/22/2007|01/31/2008* |    20.170|     8.120|     3.690|AK   0.800|      -   |      -  |   8.0|32.780|AL  42.870|AL  42.870|AL  42.870
   PUMP INSTALLER           |08/22/2007|01/31/2008* |    17.860|     8.120|     3.690|AM   0.720|      -   |      -  |   8.0|30.390|AL  39.320|AL  39.320|AL  39.320
   HELPER                   |08/22/2007|01/31/2008* |    12.470|     8.120|     3.690|AN   0.530|      -   |      -  |   8.0|24.810|AL  31.040|AL  31.040|AL  31.040
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT.  EFFECTIVE AS OF JULY 1, 2008, THE ISSUANCE AND PUBLICATION OF THE PREVAILING WAGE APPRENTICE SCHEDULES/APPRENTICE
   WAGE RATES HAVE BEEN REASSIGNED BY THE DEPARTMENT OF INDUSTRIAL RELATIONS FROM THE DIVISION OF LABOR STATISTICS AND RESEARCH TO THE DIVISION OF
   APPRENTICESHIP STANDARDS.  TO OBTAIN ANY APPRENTICE SCHEDULES/APPRENTICE WAGE RATES, PLEASE CONTACT THE DIVISION OF APPRENTICESHIP STANDARDS OR REFER
   TO THE DIVISION OF APPRENTICESHIP STANDARDS' WEBSITE AT http://www.dir.ca.gov/das.das.html.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  AMOUNT INCLUDED IN FACTORING OVERTIME RATES.
C  INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND AND AN AMOUNT FOR INTERNATIONAL MASONRY INSTITUTE (IMI).
D  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
F  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I  INCLUDED IN BASIC HOURLY RATE.
J  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
K  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
L  IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES.
M  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   RATE.
N  IN ADDITION TO THE AMOUNT SHOWN, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR, $0.19 IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES FOR THE LABOR MANAGEMENT COOPERATION COMMITTEE FUND.
O  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
P  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
Q  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
R  RATE APPLIES TO THE FIRST 4 DAILY OT HOURS AND THE FIRST 12 OT HOURS ON SATURDAY.  ALL OTHER OT IS PAID AT 2X.
S  INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
T  INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
U  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND
   HOLIDAY OVERTIME RATE.
V  EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.
W  INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
X  RATE APPLIES TO FIRST OVERTIME HOUR ONLY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
Y  DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
Z  PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AA INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.
AB RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AC AMOUNT IS FOR VALLEY MORTAR TRADES FUND ($1.00) AND INDUSTRY STABILIZATION ($0.02)
AD INCLUDES AN AMOUNT FOR DUES CHECK OFF.
AE THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AF THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT
   PERIOD, MAY BE PERFORMED BY LANDSCAPE IRRIGATION TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN.
AG RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
AH RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS.  ALL OTHER OVERTIME
   HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AI INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AJ RATE APPLIES TO THE FIRST 3 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY.  ALL OTHER TIME IS PAID AT THE
   SUNDAY/HOLIDAY OVERTIME RATE.
AK RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.35 AFTER 2 YEARS; $1.45 AFTER 5 YEARS; $1.60 AFTER 10 YEARS
AL COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
AM RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.27 AFTER 2 YEARS; $1.37 AFTER 5 YEARS; $1.52 AFTER 10 YEARS.
AN RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.08 AFTER 2 YEARS; $1.18 AFTER 5 YEARS; $1.33 AFTER 10 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/DLSR/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINAT

TRAVEL AND/OR SUBSISTENCE PAYMENT: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS
   TO EACH WORKER TO EXECUTE THE WORK.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR EACH CRAFT, CLASSIFICATION, OR TYPE OF WORKER MAY BE OBTAINED FROM THE
   PREVAILING WAGE UNIT AT (415) 703-4774.