GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SANTA CRUZ COUNTY

DETERMINATION: STZ-2008-1

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON               |08/22/2007|06/30/2008* |A   29.510|     8.420|     9.600|B    2.000|     0.400|C   0.050|D  8.0|49.980|E   65.740|E   65.740|    81.490
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |08/22/2007|06/30/2008**|A   35.830|     8.420|     6.150|F     -   |     0.650|    0.300|D  8.0|51.350|    69.260|G   69.260|    87.180
# BRICK TENDER              |08/22/2007|06/30/2008* |H   27.720|     6.330|     4.300|F     -   |     0.100|      -  |D  7.5|38.450|    66.170|    66.170|    66.170
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   SOFT FLOOR LAYER         |02/22/2008|06/30/2008* |A   39.110|     6.290|     7.300|I     -   |     0.530|    0.340|   8.0|53.570|J   73.130|J   73.130|    92.680
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   AFTER 3 YEARS            |02/22/2008|06/30/2008* |A   19.530|     6.290|     3.650|I     -   |      -   |    0.340|   8.0|29.810|J   39.580|J   39.580|    49.340
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   LESS THAN 3 YEARS        |02/22/2008|06/30/2008* |A   15.610|     6.290|     2.920|I     -   |      -   |    0.340|   8.0|25.160|J   32.970|J   32.970|    40.770
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIRST 3 MONTHS  |02/22/2008|06/30/2008* |A   12.470|     6.290|     2.340|I     -   |      -   |    0.340|   8.0|21.440|J   27.670|J   27.670|    33.910
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SECOND 3 MONTHS |02/22/2008|06/30/2008* |A   14.040|     6.290|     2.630|I     -   |      -   |    0.340|   8.0|23.300|J   30.320|J   30.320|    37.340
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2008|11/30/2008**|    27.970|     6.550|K    4.000|      -   |     0.950|L   0.210|   8.0|40.660|M   55.130|M   55.130|    69.610
   COMM & SYSTEM TECH.      |02/22/2008|11/30/2008**|    31.850|     6.550|K    4.000|      -   |     0.950|L   0.210|   8.0|44.680|M   61.080|M   61.080|    77.480
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |         |      |      |          |          |
   TECHNICIAN               |02/22/2008|05/25/2008* |N   36.290|O    9.150|P    9.060|      -   |O    0.700|Q   0.200|   8.0|56.760|R   85.040|R   85.040|   113.320
   CABLE SPLICER            |02/22/2008|05/25/2008* |N   40.830|O    9.150|P    9.060|      -   |O    0.700|Q   0.200|   8.0|61.470|R   92.110|R   92.110|   122.750
   INSIDE WIREMAN (WHEN     |          |            |          |          |          |          |          |         |      |      |          |          |
   WELDING)                 |02/22/2008|05/25/2008* |N   39.920|O    9.150|P    9.060|      -   |O    0.700|Q   0.200|   8.0|60.530|R   90.690|R   90.690|   120.860
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-010) S          |02/22/2008|02/28/2009* |    35.240|     9.420|T    7.570|U    3.340|     0.640|    0.160|   8.0|56.370|V   73.990|V   73.990|V   73.990
   INSTRUMENTMAN            |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-034) S          |02/22/2008|02/28/2009* |    32.150|     9.420|T    7.570|U    3.340|     0.640|    0.160|   8.0|53.280|V   69.360|V   69.360|V   69.360
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |         |      |      |          |          |
   (869.567-010) S          |02/22/2008|02/28/2009* |    29.270|     9.420|T    7.570|U    3.340|     0.640|    0.160|   8.0|50.400|V   65.030|V   65.030|V   65.030
# GLAZIER                   |02/22/2008|06/21/2008* |A   36.810|     6.160|W   10.050|      -   |     0.400|X   0.380|   8.0|53.800|Y   72.210|    90.610|    90.610
# MARBLE FINISHER Z         |08/22/2007|07/31/2008**|AA  27.220|     8.420|     2.950|I     -   |     0.300|    0.200|   8.0|39.090|AB  52.700|    66.310|    66.310
# MARBLE MASON Z            |08/22/2007|07/31/2008**|AA  37.820|     8.420|     9.310|I     -   |     0.400|    0.210|   8.0|56.160|AB  75.070|    93.980|    93.980
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   BRUSH AND SPRAY          |02/02/2008|06/30/2008**|H   32.500|     6.540|T    7.720|I     -   |     0.310|    0.380|D  8.0|47.450|    63.700|AC  63.700|    79.950
   INDUSTRIAL PAINTER       |02/22/2008|06/30/2008**|H   32.750|     6.540|T    7.720|I     -   |     0.310|    0.380|D  8.0|47.700|    64.070|AC  64.070|    80.450
   SANDBLASTER, STEAM       |          |            |          |          |          |          |          |         |      |      |          |          |
   CLEANER, WATERBLASTER    |02/22/2008|06/30/2008**|H   33.000|     6.540|T    7.720|I     -   |     0.310|    0.380|D  8.0|47.950|    64.450|AC  64.450|    80.950
   EXOTIC MATERIALS         |02/22/2008|06/30/2008**|H   33.250|     6.540|T    7.720|I     -   |     0.310|    0.380|D  8.0|48.200|    64.820|AC  64.820|    81.450
   PAPERHANGER/WALLCOVERING |02/22/2008|06/30/2008**|H   33.500|     6.540|T    7.720|I     -   |     0.310|    0.380|D  8.0|48.450|    65.200|AC  65.200|    81.950
   TAPER                    |02/22/2008|07/31/2008* |A   30.080|     6.540|     6.180|     2.500|     0.310|    0.210|   8.0|45.820|    60.860|D   60.860|AC  75.900
   TAPER CLEAN-UP AD        |02/22/2008|07/31/2008* |A   13.890|     6.540|      -   |      -   |      -   |      -  |   8.0|20.430|    27.380|D   27.380|AC  34.320
# PLASTERER                 |08/22/2007|06/30/2008**|A   29.220|     7.480|     4.150|     3.750|     0.900|    0.150|   8.0|45.650|    59.530|AE  59.530|    73.400
# PLASTER TENDER            |08/22/2007|06/30/2008**|A   30.290|     6.330|     4.300|     2.250|     0.100|AF  0.150|   8.0|43.420|AG  58.190|AG  58.190|    72.960
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, PIPE FITTER &   |          |            |          |          |          |          |          |         |      |      |          |          |
   REFRIGERATION FITTER     |          |            |          |          |          |          |          |         |      |      |          |          |
   (HVAC)                   |02/22/2008|06/30/2008**|    38.250|     7.520|     7.810|F     -   |     0.850|    1.470|   8.0|55.900|E   75.030|E   75.030|    94.150
   PIPE TRADESMAN           |02/22/2008|06/30/2008* |    13.000|     6.300|     1.000|F     -   |      -   |    0.610|   8.0|20.910|E   27.410|E   27.410|    33.910
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |08/22/2007|06/30/2008* |    24.350|     3.450|     2.400|     1.700|     0.300|    0.600|D  8.0|32.800|    44.980|    44.980|    57.150
   LANDSCAPE PIPEFITTER     |08/22/2007|06/30/2008* |    24.350|     3.450|     2.400|     1.700|     0.300|    0.550|D  8.0|32.750|    44.930|    44.930|    57.100
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN AH  |08/22/2007|06/30/2008* |    13.600|     3.450|     2.400|     1.700|     0.300|    0.600|D  8.0|22.050|    28.850|    28.850|    35.650
   LANDSCAPE ASSISTANT      |          |            |          |          |          |          |          |         |      |      |          |          |
   JOURNEYMAN AH            |08/22/2007|06/30/2008* |    13.600|     3.450|     2.400|     1.700|     0.300|    0.550|D  8.0|22.000|    28.800|    28.800|    35.600
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN AH             |08/22/2007|06/30/2008* |     9.500|     3.450|     2.400|     1.700|     0.300|    0.600|D  8.0|17.950|    22.700|    22.700|    27.450
   LANDSCAPE TRADESMAN I AI |08/22/2007|06/30/2008* |     9.500|     3.450|      -   |     1.700|     0.300|    0.550|D  8.0|15.500|    20.250|    20.250|    25.000
   LANDSCAPE TRADESMAN II AI|08/22/2007|06/30/2008* |     9.500|     3.450|     2.400|     1.700|     0.300|    0.550|D  8.0|17.900|    22.650|    22.650|    27.400
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND)             |02/22/2008|03/31/2008**|    31.150|     7.550|AJ   7.200|      -   |     0.300|    0.250|   8.0|46.450|    62.020|    62.020|    77.600
# ROOFER                    |08/22/2007|09/30/2007* |AK  31.730|     5.790|     3.100|AL    -   |     1.000|      -  |   8.0|41.620|    55.420|    55.420|    55.420
   KETTLEMAN (2 KETTLES),   |          |            |          |          |          |          |          |         |      |      |          |          |
   BITUMASTIC ENAMELER,     |          |            |          |          |          |          |          |         |      |      |          |          |
   COAL TAR, PITCH & MASTIC |08/22/2007|09/30/2007* |AK  33.730|     5.790|     3.100|AL    -   |     1.000|      -  |   8.0|43.620|    58.420|    58.420|    58.420
# SHEET METAL WORKER        |08/22/2007|06/30/2008* |A   38.250|     9.140|     6.960|F     -   |     1.230|    0.570|   8.0|56.150|AM  75.280|AM  75.280|    94.400
   FOR SERVICE AND REPAIR   |08/22/2007|06/30/2008* |A   38.250|     9.140|     6.960|F     -   |     1.230|    0.570|   8.0|56.150|AN  75.280|AO  75.280|AP  94.400
   METAL DECK & SIDING      |08/22/2007|06/30/2008* |H   33.080|     9.120|     9.820|F     -   |     0.270|      -  |   8.0|52.290|AM  68.830|AM  68.830|    85.370
# TERRAZZO WORKER           |08/22/2007|06/30/2008* |AQ  36.780|     8.420|     8.800|F     -   |      -   |    0.400|   7.0|54.400|AR  70.280|AR  70.280|    86.160
   TERRAZZO FINISHER        |08/22/2007|06/30/2008* |AQ  27.710|     6.610|     3.300|F     -   |      -   |    0.350|   7.0|37.970|AR  50.620|AR  50.620|    63.270
# TILE FINISHER             |08/22/2007|03/31/2008**|A   19.550|     6.610|     2.870|     0.700|     0.300|    0.480|   8.0|30.510|    40.280|D   40.280|    50.060
   RED CIRCLED FINISHER     |08/22/2007|03/31/2008**|A   25.310|     6.610|     3.100|     1.300|     0.300|    0.480|   8.0|37.100|    49.760|D   49.760|    62.410
# TILE SETTER               |08/22/2007|03/31/2008**|A   34.120|     6.610|     4.100|     2.350|     0.300|    0.480|   8.0|47.960|    65.020|D   65.020|    82.080
  WATER WELL DRILLER        |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AS   0.630|      -   |      -  |   8.0|17.310|AT  23.660|AT  23.660|AT  23.660
   PUMP INSTALLER           |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AS   0.630|      -   |      -  |   8.0|17.310|AT  23.660|AT  23.660|AT  23.660
   HELPER                   |08/22/1998|12/31/1998* |    10.380|     3.200|     0.780|AU   0.520|      -   |      -  |   8.0|14.880|AT  20.070|AT  20.070|AT  20.070
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  AMOUNT INCLUDED IN FACTORING OVERTIME RATES.
C  AMOUNT IS FOR INTERNATIONAL MASONRY INSTITUTE (IMI).
D  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
F  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I  INCLUDED IN BASIC HOURLY RATE.
J  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
K  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
L  IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES.
M  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   RATE.
N  ALL OF SANTA CRUZ, MONTEREY, AND SAN BENITO COUNTIES WITHIN TWENTY-FIVE (25) AIR-MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN AREA
   EXTENDING FIVE (5) MILES EAST AND WEST OF HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY LINE.  FOR WAGE RATES IN AN AREA OUTSIDE OF THIS
   DESCRIPTION, PLEASE CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH.
O  CONTRIBUTION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR WORKED.
P  CONTRIBUTION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR WORKED. IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE HOURLY RATE IS
   ADDED TO THE DAILY AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
Q  IN ADDITION, .75% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
R  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY.  ALL OTHER TIME AND WORK PERFORMED ON A SATURDAY THAT
   IMMEDIATELY FOLLOWS A DESIGNATED HOLIDAY THAT IS OBSERVED ON A FRIDAY ARE PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
S  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
T  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
U  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
V  RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND FIRST 12 HOURS WORKED ON SATURDAY, SUNDAY AND HOLIDAY.  ALL OTHER OVERTIME HOUR IS PAID AT DOUBLE THE
   BASIC HOURLY RATE.
W  INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
X  INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
Y  RATE APPLIES TO THE FIRST 2 OVERTIME HOURS; ALL OTHER TIME IS PAID AT THE SATURDAY OVERTIME HOURLY RATE.
Z  EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.
AA INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AB RATE APPLIES TO FIRST OVERTIME HOUR ONLY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AC DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AD PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AE RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AF AMOUNT IS FOR INDUSTRY PROMOTION FUND.
AG ALL HOURS OVER 48 HOURS PER WEEK ARE AT THE SUNDAY & HOLIDAY RATE
AH THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AI THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT
   PERIOD, MAY BE PERFORMED BY LANDSCAPE IRRIGATION TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN.
AJ INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AK BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE BASED ON THE DAVIS-BACON WAGE DETERMINATION FOR THIS CRAFT.
AL INCLUDED IN STRAIGHT-TIME HOURLY RATE WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AM RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
AN FOR BOTH THE MONDAY-FRIDAY AND THE TUESDAY-SATURDAY SERVICE WORKWEEKS, RATE APPLIES TO THE FIRST FOUR (4) HOURS WORKED OUTSIDE OF THE EMPLOYEE'S
   NORMAL EIGHT (8) WORK HOURS; ALL OTHER OVERTIME SHALL BE PAID AT THE DOUBLE TIME RATE OF PAY.
AO APPLIES TO THE FIRST EIGHT (8) HOURS WORKED FOR THE MONDAY-FRIDAY SERVICE WORKWEEK; ALL OTHER OVERTIME SHALL BE PAID AT THE DOUBLE TIME RATE OF PAY.
   FOR THE TUESDAY-SATURDAY SERVICE WORKWEEK ONLY, SATURDAY WILL BE WORKED AT STRAIGHT-TIME FOR THE EMPLOYEE'S NORMAL EIGHT (8) WORK HOURS.
AP THIS RATE ALSO APPLIES TO ALL HOURS WORKED ON MONDAY FOR THE TUESDAY-SATURDAY SERVICE WORKWEEK.
AQ INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AR RATE APPLIES TO THE FIRST 3 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY.  ALL OTHER TIME IS PAID AT THE
   SUNDAY/HOLIDAY OVERTIME RATE.
AS RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
AT RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY
   ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
AU RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/DLSR/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINAT

TRAVEL AND/OR SUBSISTENCE PAYMENT: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS
   TO EACH WORKER TO EXECUTE THE WORK.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR EACH CRAFT, CLASSIFICATION, OR TYPE OF WORKER MAY BE OBTAINED FROM THE
   PREVAILING WAGE UNIT AT (415) 703-4774.