Dept. of Industrial Relations logo
Director's Office of Policy, Research and Legislation Northern California provision selection page

General prevailing wage determinations
made by the director of industrial relations

Pursuant to California Labor Code part 7,
chapter 1, article 2, sections 1770, 1773, and 1773.1


Craft: Asbestos Worker, Heat and Frost Insulator

Page Classification Determination Holidays,
scope of work,
travel &
subsistence
Predetermined
increase
33 Mechanic
(for projects advertised for bids on or after September 1, 2006 through September 14, 2006)
NC-3-16-1-2006-1
No increase *
33 Hazardous Material Handler Mechanic/Helper
(for projects advertised for bids on or after September 1, 2006 through September 14, 2006)
NC-3-16-3-2006-1
Increase
33 Mechanic
(for projects advertised for bids on or after September 15, 2006)
NC-3-16-1-2006-1
No increase *
33 Hazardous Material Handler Mechanic/Helper
(for projects advertised for bids on or after September 15, 2006)
NC-3-16-3-2006-1
Increase

Return to main table



*   
A single asterisk after the expiration date of a determination indicates that no increase is required for projects advertised while that determination is in effect.  The determination remains in effect until it is canceled, modified, or superceded by a new determination by the Director of Industrial Relations.  A new determination will become effective 10 days after it is issued.  Contact the Division of Labor Statistics and Research at (415) 703-4774 after 10 days from the expiration date, if no subsequent determination is issued.


To view the above current prevailing wage determinations, current predetermined increases, and the current holiday, advisory scope of work, and travel and subsistence provisions for each craft, you must first download a free copy of the Adobe Acrobat Reader available by clicking on the icon below:

acrobat icon