GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SONOMA COUNTY

DETERMINATION: SON-2006-1

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON               |02/22/2006|06/30/2006**|A   31.050|     7.250|     6.650|B    3.400|     0.350|C   0.350|D  8.0|49.050|E   66.280|E   66.280|    83.500
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |08/22/2005|06/30/2006* |A   32.300|     7.750|     5.750|F     -   |     0.450|    0.100|D  8.0|46.350|    62.500|G   62.500|    78.650
# BRICK TENDER              |02/22/2006|06/30/2006**|H   25.560|     5.140|     3.560|F     -   |     0.340|      -  |D  8.0|34.600|E   47.380|E   47.380|    60.160
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   SOFT FLOOR LAYER         |02/22/2006|06/30/2006**|A   36.550|     6.250|     5.900|I     -   |     0.530|    0.340|   8.0|49.570|J   67.840|J   67.840|    86.120
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   AFTER 3 YEARS            |02/22/2006|06/30/2006**|A   18.250|     6.250|     2.950|I     -   |      -   |    0.340|   8.0|27.790|J   36.920|J   36.920|    46.040
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   LESS THAN 3 YEARS        |02/22/2006|06/30/2006**|A   14.590|     6.250|     2.360|I     -   |      -   |    0.340|   8.0|23.540|J   30.830|J   30.830|    38.130
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIRST 3 MONTHS  |02/22/2006|06/30/2006**|A   11.660|     6.250|     1.890|I     -   |      -   |    0.340|   8.0|20.140|J   25.970|J   25.970|    31.800
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SECOND 3 MONTHS |02/22/2006|06/30/2006**|A   13.120|     6.250|     2.120|I     -   |      -   |    0.340|   8.0|21.830|J   28.390|J   28.390|    34.950
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2006|11/30/2006* |    25.720|     5.850|K    3.300|      -   |     0.650|L   0.160|   8.0|36.580|M   49.890|M   49.890|    63.200
   COMM & SYSTEM TECH.      |02/22/2006|11/30/2006* |    29.280|     5.850|K    3.300|      -   |     0.650|L   0.160|   8.0|40.270|M   55.420|M   55.420|    70.580
   INSIDE WIREMAN           |08/22/2005|05/31/2006**|A   35.230|     7.180|K    4.000|      -   |     0.600|    0.300|   8.0|48.370|N   66.510|N   66.510|    84.650
   CABLE SPLICER            |08/22/2005|05/31/2006**|A   38.750|     7.180|K    4.000|      -   |     0.600|    0.300|   8.0|51.990|N   71.950|N   71.950|    91.900
   TUNNEL WIREMAN           |08/22/2005|05/31/2006**|A   35.730|     7.180|K    4.000|      -   |     0.600|    0.300|   8.0|48.880|N   67.280|N   67.280|    85.680
   TUNNEL CABLE SPLICER     |08/22/2005|05/31/2006**|A   39.250|     7.180|K    4.000|      -   |     0.600|    0.300|   8.0|52.510|N   72.720|N   72.720|    92.940
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-010) O          |02/22/2006|02/28/2007**|    35.620|     8.920|P    4.490|Q    3.540|     0.640|    0.160|   8.0|53.370|R   71.180|R   71.180|R   71.180
   INSTRUMENTMAN            |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-034) O          |02/22/2006|02/28/2007**|    32.530|     8.920|P    4.490|Q    3.540|     0.640|    0.160|   8.0|50.280|R   66.540|R   66.540|R   66.540
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |         |      |      |          |          |
   (869.567-010) O          |02/22/2006|02/28/2007**|    29.650|     8.920|P    4.490|Q    3.540|     0.640|    0.160|   8.0|47.400|R   62.220|R   62.220|R   62.220
# GLAZIER                   |08/22/2005|06/30/2006**|A   34.820|     5.900|S    7.800|      -   |     0.400|T   0.280|   8.0|49.200|U   66.610|    84.020|    84.020
# MARBLE FINISHER           |02/22/2006|07/31/2006* |A   23.720|     5.920|     2.950|     2.850|     0.250|    0.100|   8.0|35.790|V   47.650|    59.510|    59.510
# MARBLE SETTER W           |08/22/2005|07/31/2006* |A   32.340|     7.750|     7.660|     4.000|     0.400|    0.110|   8.0|52.260|X   67.660|    83.060|    83.060
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   BRUSH AND SPRAY          |08/22/2005|06/30/2006* |H   29.610|     6.340|P    6.820|I     -   |     0.250|    0.380|D  8.0|43.400|    58.210|    58.210|    73.010
   INDUSTRIAL PAINTER       |08/22/2005|06/30/2006* |H   29.860|     6.340|P    6.820|I     -   |     0.250|    0.380|D  8.0|43.650|    58.580|    58.580|    73.510
   SANDBLASTER, STEAM       |          |            |          |          |          |          |          |         |      |      |          |          |
   CLEANER, WATERBLASTER    |08/22/2005|06/30/2006* |H   30.110|     6.340|P    6.820|I     -   |     0.250|    0.380|D  8.0|43.900|    58.960|    58.960|    74.010
   EXOTIC MATERIALS         |08/22/2005|06/30/2006* |H   30.360|     6.340|P    6.820|I     -   |     0.250|    0.380|D  8.0|44.150|    59.330|    59.330|    74.510
   PAPERHANGER/WALLCOVERING |08/22/2005|06/30/2006* |H   30.610|     6.340|P    6.820|I     -   |     0.250|    0.380|D  8.0|44.400|    59.710|    59.710|    75.010
   TAPER                    |08/22/2005|07/31/2006**|A   32.370|     6.340|     7.180|     2.500|     0.250|    0.210|   8.0|48.850|    65.040|D   65.040|    81.220
   TAPER CLEAN-UP Y         |08/22/2005|07/31/2006* |A   14.920|     6.340|      -   |      -   |      -   |      -  |   8.0|21.260|    28.720|D   28.720|    36.180
# PLASTERER                 |02/22/2006|06/30/2006**|Z   25.990|     6.480|     4.500|     3.750|     0.600|    0.550|   8.0|41.870|    54.160|AA  54.160|    66.450
  PLASTER TENDER            |08/22/2005|06/30/2006* |    23.870|     5.190|     3.170|     2.280|     0.340|AB  0.570|   8.0|35.420|J   47.350|J   47.350|    59.290
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, STEAMFITTER     |08/22/2005|06/30/2006**|AC  43.000|     9.480|     9.000|F     -   |     1.750|    1.300|   7.0|64.530|AD  86.030|AE  86.030|   107.530
   SERVICE AND REPAIR,      |          |            |          |          |          |          |          |         |      |      |          |          |
   LIGHT COMMERCIAL         |02/22/2006|06/30/2006**|AC  34.400|     9.480|     8.950|F     -   |     1.650|    1.080|   8.0|55.560|AF  72.760|G   72.760|    89.960
   REFRIGERATION FITTER     |          |            |          |          |          |          |          |         |      |      |          |          |
   (HVAC)                   |08/22/2005|06/30/2006**|AC  43.000|     9.480|     9.000|F     -   |     1.750|    1.300|   8.0|64.530|AF  86.030|G   86.030|   107.530
   AIR CONDITIONING &       |          |            |          |          |          |          |          |         |      |      |          |          |
   REFRIGERATION/HVAC -     |          |            |          |          |          |          |          |         |      |      |          |          |
   SERVICE WORK             |08/22/2005|06/30/2006**|AC  43.000|     9.480|     9.000|F     -   |     1.750|    1.300|   8.0|64.530|AF  86.030|G   86.030|   107.530
   LANDSCAPE/IRRIGATION     |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |02/22/2006|06/30/2006* |A   32.910|     7.900|     6.300|F     -   |     1.300|      -  |   8.0|48.410|    64.860|AA  64.860|    81.320
   UNDERGROUND/UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |02/22/2006|06/30/2006* |A   32.910|     7.900|     6.300|F     -   |     1.300|      -  |   8.0|48.410|    64.860|AA  64.860|    81.320
   SPRINKLER FITTER (FIRE   |          |            |          |          |          |          |          |         |      |      |          |          |
   PROTECTION AND FIRE      |          |            |          |          |          |          |          |         |      |      |          |          |
   CONTROL SYSTEMS)         |02/22/2006|08/02/2006**|A   39.690|     6.400|    10.100|F     -   |     0.800|    0.120|   8.0|57.110|    76.950|    76.950|    96.800
# ROOFER                    |02/22/2006|07/31/2006**|    26.650|     5.790|     3.250|     3.110|     0.300|    0.350|D  8.0|39.450|    52.770|    52.770|    66.100
   BITUMASTIC, ENAMELER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPE WRAPPER, COAL TAR   |          |            |          |          |          |          |          |         |      |      |          |          |
   PITCH BUILD-UP           |02/22/2006|07/31/2006**|    28.650|     5.790|     3.250|     3.110|     0.300|    0.350|D  8.0|41.450|    55.770|    55.770|    70.100
   MASTIC WORKER, KETTLEMAN |02/22/2006|07/31/2006**|    26.900|     5.790|     3.250|     3.110|     0.300|    0.350|D  8.0|39.700|    53.150|    53.150|    66.600
# SHEET METAL WORKER (HVAC) |08/22/2005|06/30/2006* |H   39.040|     7.950|     8.380|F     -   |     1.000|AG  1.090|   8.0|57.460|N   76.980|N   76.980|    96.500
   METAL DECK & SIDING      |08/22/2004|06/30/2005* |H   30.410|     7.530|     7.890|F     -   |     0.270|    0.440|   8.0|46.540|N   61.740|N   61.740|    76.950
# SHEET METAL WORKER (HVAC):|          |            |          |          |          |          |          |         |      |      |          |          |
   TOTAL HVAC CONTRACT OF   |          |            |          |          |          |          |          |         |      |      |          |          |
   $270,000 OR LESS         |08/22/2005|06/30/2006* |H   33.250|     7.950|     7.610|F     -   |     1.000|AG  1.090|   8.0|50.900|N   67.530|N   67.530|    84.150
   SERVICE TECHNICIAN       |08/22/2005|06/30/2006* |H   22.080|     6.540|     4.740|F     -   |     1.000|AG  1.090|   8.0|35.450|AH  46.490|AH  46.490|    57.530
   SERVICE TECHNICIAN,      |          |            |          |          |          |          |          |         |      |      |          |          |
   ADDITIONAL STEP          |08/22/2005|06/30/2006* |H   23.170|     6.540|     4.740|F     -   |     1.000|AG  1.090|   8.0|36.540|AH  48.130|AH  48.130|    59.710
   SERVICE TECHNICIAN,      |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND ADDITIONAL STEP   |08/22/2005|06/30/2006* |H   24.250|     6.540|     4.740|F     -   |     1.000|AG  1.090|   8.0|37.620|AH  49.740|AH  49.740|    61.870
   LIGHT COMMERCIAL AIR     |          |            |          |          |          |          |          |         |      |      |          |          |
   CONDITIONING SPECIALIST  |08/22/2005|06/30/2006* |H   20.000|     6.540|     1.140|F     -   |     1.000|AG  1.090|   8.0|29.770|N   39.770|N   39.770|    49.770
# TERRAZZO WORKER           |02/22/2006|06/30/2006**|AI  35.100|     7.500|     7.400|F     -   |      -   |    0.400|   7.0|50.400|AJ  65.540|AJ  65.540|    80.680
   TERRAZZO FINISHER        |08/22/2005|06/30/2006**|AI  26.120|     5.800|     3.050|F     -   |      -   |    0.300|   7.0|35.270|AJ  47.210|AJ  47.210|    59.150
# TILE FINISHER             |02/22/2006|03/31/2006**|A   17.950|AK   5.800|AK   2.400|     0.700|AK   0.200|AK  0.400|   8.0|27.450|    27.620|D   27.620|    36.600
   RED CIRCLED FINISHER     |02/22/2006|03/31/2006**|A   21.170|AK   5.800|AK   3.100|     1.300|AK   0.200|AK  0.400|   8.0|31.970|    33.050|D   33.050|    43.640
# TILE SETTER               |02/22/2006|03/31/2006**|A   29.870|AK   5.800|AK   4.100|     2.350|AK   0.200|AK  0.400|   8.0|42.720|    47.150|D   47.150|    62.090
  WATER WELL DRILLER        |          |            |          |          |          |          |          |         |      |      |          |          |
   DRILLER, PUMP REPAIRMAN  |02/22/2001|01/31/2002* |    18.170|     3.400|     1.500|AL   0.730|      -   |      -  |   8.0|23.800|AM  32.890|AM  32.890|AM  32.890
   PUMP INSTALLER           |02/22/2001|01/31/2002* |    16.250|     3.400|     1.500|AN   0.660|      -   |      -  |   8.0|21.810|AM  29.930|AM  29.930|AM  29.930
   HELPER                   |02/22/2001|01/31/2002* |    11.800|     3.400|     1.500|AO   0.510|      -   |      -  |   8.0|17.210|AM  23.110|AM  23.110|AM  23.110
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  AMOUNT INCLUDED IN FACTORING OVERTIME RATES.
C  AMOUNT IS FOR INDUSTRY FUND.
D  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
F  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I  INCLUDED IN BASIC HOURLY RATE.
J  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
K  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
L  IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES.
M  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   RATE.
N  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
O  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
P  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
Q  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
R  RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND FIRST 12 HOURS WORKED ON SATURDAY, SUNDAY AND HOLIDAY.  ALL OTHER OVERTIME HOUR IS PAID AT DOUBLE THE
   BASIC HOURLY RATE.
S  INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
T  INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
U  RATE APPLIES TO THE FIRST 2 OVERTIME HOURS; ALL OTHER TIME IS PAID AT THE SATURDAY OVERTIME HOURLY RATE.
V  RATE ONLY APPLIES TO THE FIRST DAILY OVERTIME HOUR WORKED, MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME HOURS ARE PAID AT THE SATURDAY, SUNDAY, AND
   HOLIDAY OVERTIME RATE.
W  EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $10.00 PER DAY ABOVE THE WAGE RATE.
X  RATE APPLIES TO FIRST OVERTIME HOUR ONLY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
Y  PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
Z  INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.
AA RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AB AMOUNT IS FOR VALLEY MORTAR TRADES FUND ($0.55) AND INDUSTRY STABILIZATION ($0.02)
AC INCLUDES AN AMOUNT FOR DUES CHECK OFF, COPE, VACATION AND HOLIDAY.
AD RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 9 HOURS ON SATURDAY ONLY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
AE THE FIRST 9 HOURS WORKED ON SATURDAY SHALL BE PAID AT TIME AND ONE-HALF.

AF RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AG INCLUDES AN AMOUNT FOR SUPPLEMENTAL UNEMPLOYMENT BENEFIT FUND AND AN AMOUNT FOR INDUSTRY PROMOTION FUND.
AH RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
AI INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AJ RATE APPLIES TO THE FIRST 3 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY.  ALL OTHER TIME IS PAID AT THE
   SUNDAY/HOLIDAY OVERTIME RATE.
AK NOT INCLUDED IN THE OVERTIME HOURLY RATE.
AL RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.28 AFTER 2 YEARS; $1.38 AFTER 5 YEARS; $1.53 AFTER 10 YEARS
AM COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
AN RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.21 AFTER 2 YEARS; $1.31 AFTER 5 YEARS; $1.46 AFTER 10 YEARS.
AO RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.06 AFTER 2 YEARS; $1.16 AFTER 5 YEARS; $1.31 AFTER 10 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/DLSR/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINAT

TRAVEL AND/OR SUBSISTENCE PAYMENT: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS
   TO EACH WORKER TO EXECUTE THE WORK.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR EACH CRAFT, CLASSIFICATION, OR TYPE OF WORKER MAY BE OBTAINED FROM THE
   PREVAILING WAGE UNIT AT (415) 703-4774.