GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SACRAMENTO COUNTY

DETERMINATION: SAC-2005-2

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON               |08/22/2004|06/30/2005* |A   27.500|     7.250|     4.400|B     -   |     0.350|    0.300|C  8.0|39.800|D   53.550|D   53.550|    67.300
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |08/22/2005|06/30/2006* |A   27.800|     7.750|     4.500|B     -   |     0.400|    0.100|C  8.0|40.550|    54.450|E   54.450|    68.350
  BRICK TENDER              |08/22/2004|06/30/2005* |F   23.840|     5.040|     3.020|B     -   |     0.150|    0.300|C  8.0|32.350|D   44.270|D   44.270|    56.190
   1ST 1,500 HOURS G        |08/22/2004|06/30/2005* |F   11.880|     5.040|     3.020|B     -   |     0.150|    0.300|C  8.0|20.390|D   26.330|D   26.330|    32.270
   2ND 1,500 HOURS G        |08/22/2004|06/30/2005* |F   14.380|     5.040|     3.020|B     -   |     0.150|    0.300|C  8.0|22.890|D   30.080|D   30.080|    37.270
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   RESILIENT TILE LAYER     |08/22/2005|12/31/2005**|A   26.960|     5.290|     3.700|H     -   |     0.380|    0.110|   8.0|36.440|I   49.920|I   49.920|    63.400
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2005|11/30/2005**|    20.080|     5.450|J    1.600|K    1.540|     0.600|L   0.100|   8.0|30.140|    40.530|    40.530|    50.920
   COMM & SYSTEM TECH.      |02/22/2005|11/30/2005**|    22.810|     5.450|J    1.600|M    1.750|     0.600|L   0.110|   8.0|33.170|    44.980|    44.980|    56.780
   INSIDE WIREMAN           |08/22/2005|11/30/2005**|    33.210|     6.330|J    2.500|B     -   |     0.890|N   0.320|   8.0|44.780|    62.140|    62.140|    79.510
   CABLE SPLICER            |08/22/2005|11/30/2005**|    36.530|     6.330|J    2.500|B     -   |     0.890|N   0.320|   8.0|48.250|    67.350|    67.350|    86.450
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-010) O          |02/22/2004|02/28/2005* |    34.120|     7.850|P    4.250|Q    3.100|     0.590|    0.160|   8.0|50.070|    67.130|    67.130|    84.190
   INSTRUMENTMAN            |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-034) O          |02/22/2004|02/28/2005* |    31.030|     7.850|P    4.250|Q    3.100|     0.590|    0.160|   8.0|46.980|    62.500|    62.500|    78.010
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |         |      |      |          |          |
   (869.567-010) O          |02/22/2004|02/28/2005* |    28.150|     7.850|P    4.250|Q    3.100|     0.590|    0.160|   8.0|44.100|    58.170|    58.170|    72.250
# GLAZIER                   |08/22/2005|06/30/2006**|A   29.240|     5.900|R    6.050|      -   |     0.540|S   0.280|   8.0|42.010|T   56.630|    71.250|    71.250
# MARBLE FINISHER           |08/22/2003|07/31/2004* |A   22.770|     4.420|     2.750|     2.850|     0.250|      -  |   8.0|33.040|U   44.420|    55.810|    55.810
# MARBLE SETTER V           |08/22/2005|07/31/2006* |A   32.340|     7.750|     7.660|     4.000|     0.400|    0.110|   8.0|52.260|W   67.660|    83.060|    83.060
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   TAPER                    |08/22/2005|07/31/2006**|A   29.240|     6.340|     5.580|     1.700|     0.250|    0.210|   8.0|43.320|    57.940|C   57.940|    72.560
   TAPER CLEAN-UP X         |08/22/2005|07/31/2006* |A   13.520|     6.340|      -   |      -   |      -   |      -  |   8.0|19.860|    26.620|C   26.620|    33.380
   BRUSH, SPRAY, PAPERHANGER|02/22/2005|10/31/2005**|Y   25.080|     5.840|     4.160|H     -   |     0.250|Z   0.110|   8.0|35.440|    47.980|    47.980|    47.980
   SANDBLASTER, STEAM       |          |            |          |          |          |          |          |         |      |      |          |          |
   CLEANER, WATERBLASTER    |02/22/2005|10/31/2005**|Y   26.080|     5.840|     4.160|H     -   |     0.250|Z   0.110|   8.0|36.440|    49.480|    49.480|    49.480
   SPECIAL COATING          |02/22/2005|10/31/2005**|Y   26.830|     5.840|     4.160|H     -   |     0.250|Z   0.110|   8.0|37.190|    50.600|    50.600|    50.600
# PLASTERER                 |08/22/2004|06/30/2005* |A   23.580|     5.980|     4.500|     3.750|     0.500|      -  |   8.0|38.310|    49.600|C   49.600|AA  60.890
  PLASTER TENDER            |08/22/2005|06/30/2006* |    23.870|     5.190|     3.170|     2.280|     0.340|AB  0.570|   8.0|35.420|I   47.350|I   47.350|    59.290
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |08/22/2005|06/30/2006**|    23.250|     3.250|     2.300|     1.700|     0.300|    0.600|C  8.0|31.400|    43.030|    43.030|    54.650
   LANDSCAPE PIPEFITTER     |08/22/2005|06/30/2006**|    23.250|     3.250|     2.300|     1.700|     0.300|    0.550|C  8.0|31.350|    42.970|    42.970|    54.600
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN AC  |08/22/2005|06/30/2006**|    13.000|     3.250|     2.300|     1.700|     0.300|    0.600|C  8.0|21.150|    27.650|    27.650|    34.150
   LANDSCAPE ASSISTANT      |          |            |          |          |          |          |          |         |      |      |          |          |
   JOURNEYMAN AC            |08/22/2005|06/30/2006**|    13.000|     3.250|     2.300|     1.700|     0.300|    0.550|C  8.0|21.100|    27.600|    27.600|    34.100
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN AC             |08/22/2005|06/30/2006**|     9.000|     3.250|     2.300|     1.700|     0.300|    0.600|C  8.0|17.150|    21.650|    21.650|    26.150
   LANDSCAPE TRADESMAN I AD |08/22/2005|06/30/2006**|     9.000|     3.250|      -   |     1.700|     0.300|    0.550|C  8.0|14.800|    19.300|    19.300|    23.800
   LANDSCAPE TRADESMAN II AD|08/22/2005|06/30/2006**|     9.000|     3.250|     2.300|     1.700|     0.300|    0.550|C  8.0|17.100|    21.600|    21.600|    26.100
   PLUMBER, STEAMFITTER     |08/22/2005|06/30/2006* |A   33.270|     6.000|     6.000|B     -   |     0.900|    0.350|   8.0|46.520|D   63.150|D   63.150|    79.790
   PLUMBER (FOR TOTAL       |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBING JOBS $150,000   |          |            |          |          |          |          |          |         |      |      |          |          |
   OR UNDER)                |08/22/2005|06/30/2006* |A   23.730|     4.620|     3.500|B     -   |     0.900|    0.350|C  8.0|33.100|D   44.970|AE  44.970|    56.830
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND)             |08/22/2005|12/31/2005**|    28.850|     6.100|AF   5.850|      -   |     0.300|    0.200|   8.0|41.300|    55.730|    55.730|    70.150
# ROOFER                    |08/22/2005|07/31/2006**|    21.110|     5.790|     3.000|     3.740|     0.200|    0.050|   8.0|33.890|    44.440|AG  44.440|    55.000
   BITUMASTIC, ENAMELER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   COAL TAR, PITCH AND      |          |            |          |          |          |          |          |         |      |      |          |          |
   MASTIC WORKER            |08/22/2005|07/31/2006**|    25.860|     5.790|     3.000|     3.740|     0.200|    0.050|   8.0|38.640|    51.570|AG  51.570|    64.500
# SHEET METAL WORKER (HVAC) |08/22/2005|12/31/2005**|A   32.380|     7.450|     7.220|B     -   |     0.730|    0.680|   8.0|48.460|D   63.970|D   63.970|    79.480
   METAL DECK & SIDING      |08/22/2005|06/30/2006* |F   32.840|     7.430|     7.220|B     -   |     0.450|    0.100|   8.0|48.040|AH  64.460|AH  64.460|    80.880
# TERRAZZO WORKER           |08/22/2005|06/30/2006**|AI  35.100|     7.500|     7.400|B     -   |     0.100|    0.300|   7.0|50.400|AJ  65.590|AJ  65.590|    80.780
   TERRAZZO FINISHER        |08/22/2005|06/30/2006**|AI  26.120|     5.800|     3.050|B     -   |      -   |    0.300|   7.0|35.270|AJ  47.210|AJ  47.210|    59.150
# TILE FINISHER             |08/22/2005|03/31/2006**|    18.950|     4.050|     0.500|A    1.250|     0.250|    0.250|   8.0|25.250|    34.730|    34.730|    44.200
# TILE SETTER               |08/22/2005|03/31/2006**|    31.350|     4.950|     3.250|A    2.850|     0.250|    0.300|   8.0|42.950|    58.630|    58.630|    74.300
  WATER WELL DRILLER        |          |            |          |          |          |          |          |         |      |      |          |          |
   DRILLER, PUMP REPAIRMAN  |02/22/2001|01/31/2002* |    18.170|     3.400|     1.500|AK   0.730|      -   |      -  |   8.0|23.800|AL  32.890|AL  32.890|AL  32.890
   PUMP INSTALLER           |02/22/2001|01/31/2002* |    16.250|     3.400|     1.500|AM   0.660|      -   |      -  |   8.0|21.810|AL  29.930|AL  29.930|AL  29.930
   HELPER                   |02/22/2001|01/31/2002* |    11.800|     3.400|     1.500|AN   0.510|      -   |      -  |   8.0|17.210|AL  23.110|AL  23.110|AL  23.110
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
E  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
F  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
G  THE EMPLOYER SHALL NOT BE PERMITTED AN ENTRY LEVEL MASON TENDER UNLESS A REGULAR MASON TENDER IS EMPLOYED. AN EMPLOYER SHALL NOT BE PERMITTED TO
   EMPLOY A SECOND ENTRY LEVEL MASON TENDER UNTIL FOUR (4) REGULAR MASON TENDERS ARE EMPLOYED.
H  INCLUDED IN BASIC HOURLY RATE.
I  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
J  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
K  VACATION/HOLIDAY AMOUNT: AFTER FIVE YEARS OF SERVICE EQUALS $1.92 PER HOUR.
L  IN ADDITION TO THE AMOUNT SHOWN, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR, $0.16 IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES FOR THE LABOR MANAGEMENT COOPERATION COMMITTEE FUND.
M  VACATION/HOLIDAY AMOUNT: AFTER FIVE YEARS OF SERVICE EQUALS $2.18 PER HOUR.
N  IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.
O  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
P  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
Q  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
R  INCLUDES $2.00 FOR THE INDIVIDUAL ACCOUNT RETIREMENT PLAN.
S  INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
T  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE SATURDAY, SUNDAY AND HOLIDAY OVERTIME RATE.
U  RATE ONLY APPLIES TO THE FIRST DAILY OVERTIME HOUR WORKED, MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME HOURS ARE PAID AT THE SATURDAY, SUNDAY, AND
   HOLIDAY OVERTIME RATE.
V  EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $10.00 PER DAY ABOVE THE WAGE RATE.
W  RATE APPLIES TO FIRST OVERTIME HOUR ONLY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
X  PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
Y  INCLUDES AMOUNT WITHHELD FOR DUES CHECK-OFF, ORGANIZING DUES, BENEFICIAL AND HOLIDAY.
Z  INCLUDES AMOUNTS FOR PAINTERS & ALLIED TRADES LABOR MANAGEMENT COOPERATION INITIATIVE (P&AT LMCI) AND WORK PRESERVATION FUND.
AA RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
AB AMOUNT IS FOR VALLEY MORTAR TRADES FUND ($0.55) AND INDUSTRY STABILIZATION ($0.02)
AC THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AD THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT
   PERIOD, MAY BE PERFORMED BY LANDSCAPE IRRIGATION TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN.
AE RATE APPLIES TO THE FIRST 10 HOURS ON SATURDAY IF HOURS WORKED ARE UNDER 40 HOURS PER WEEK.  FOR WORK OVER 40 HOURS IN ONE WEEK, THE SATURDAY RATE IS
   $33.27 (NO FRINGE BENEFITS ARE INCLUDED).  ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AF INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AG SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN FOR 2 OR MORE DAYS DURING THE NORMAL WORKWEEK DUE TO WIND, RAIN,
   SNOW OR ICE, FOG, FROST, DEW OR EXTREME HEAT.
AH RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
AI INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AJ RATE APPLIES TO THE FIRST 3 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY.  ALL OTHER TIME IS PAID AT THE
   SUNDAY/HOLIDAY OVERTIME RATE.
AK RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.28 AFTER 2 YEARS; $1.38 AFTER 5 YEARS; $1.53 AFTER 10 YEARS
AL COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
AM RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.21 AFTER 2 YEARS; $1.31 AFTER 5 YEARS; $1.46 AFTER 10 YEARS.
AN RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.06 AFTER 2 YEARS; $1.16 AFTER 5 YEARS; $1.31 AFTER 10 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/DLSR/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINAT

TRAVEL AND/OR SUBSISTENCE PAYMENT: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS
   TO EACH WORKER TO EXECUTE THE WORK.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR EACH CRAFT, CLASSIFICATION, OR TYPE OF WORKER MAY BE OBTAINED FROM THE
   PREVAILING WAGE UNIT AT (415) 703-4774.