GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN BERNARDINO COUNTY

DETERMINATION: SBR-2005-1

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, STONEMASON,   |          |            |          |          |          |          |          |         |      |      |          |          |
   MARBLE MASON, CEMENT     |          |            |          |          |          |          |          |         |      |      |          |          |
   BLOCKLAYER, POINTER,     |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, CLEANER         |08/22/2004|04/30/2005**|A   29.670|     3.900|     3.400|B     -   |     0.150|    0.310|C  8.0|37.430|D   52.260|D   52.260|    67.100
# BRICK TENDER              |08/22/2004|06/30/2005**|    21.600|     4.150|     4.600|A    2.760|     0.210|    0.230|C  8.0|33.550|    44.350|    44.350|    55.150
# BRICK TENDER:             |          |            |          |          |          |          |          |         |      |      |          |          |
   FORKLIFT OPERATOR        |08/22/2004|06/30/2005**|    22.050|     4.150|     4.600|A    2.760|     0.210|    0.230|C  8.0|34.000|    45.020|    45.020|    56.050
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   RESILIENT TILE LAYER     |02/22/2005|04/30/2005**|    28.050|     3.480|     1.710|     1.500|     0.460|    0.150|   8.0|35.350|    49.370|    49.370|    63.400
   MATERIAL HANDLER - FIRST |          |            |          |          |          |          |          |         |      |      |          |          |
   SIX MONTHS               |02/22/2005|04/30/2005**|     8.250|      -   |      -   |     0.500|      -   |      -  |   8.0| 8.750|    12.880|    12.880|    17.000
   MATERIAL HANDLER - AFTER |          |            |          |          |          |          |          |         |      |      |          |          |
   SIX MONTHS               |02/22/2005|04/30/2005**|     8.250|     3.480|     0.150|     0.500|     0.100|    0.100|   8.0|12.580|    16.700|    16.700|    20.830
# DRYWALL FINISHER          |          |            |          |          |          |          |          |         |      |      |          |          |
   DRYWALL FINISHER         |02/22/2005|09/30/2005**|E   27.580|     3.450|     3.050|     3.070|     0.160|    0.520|   8.0|37.830|    51.620|F   51.620|    65.410
   SPRAY TEXTURE TENDER     |02/22/2005|09/30/2006* |E    8.500|     3.450|     1.900|      -   |      -   |    0.520|   8.0|14.370|    18.620|F   18.620|    22.870
   CLEAN UP                 |02/22/2005|09/30/2005**|E    8.000|     3.450|      -   |      -   |      -   |    0.520|   8.0|11.970|    15.970|F   15.970|    19.970
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2005|12/04/2005**|    23.080|     4.100|G    2.450|      -   |     0.600|H   0.210|   8.0|31.130|I   43.020|I   43.020|    54.900
   COMM & SYSTEM TECH.      |02/22/2005|12/04/2005**|    24.880|     4.100|G    2.450|      -   |     0.600|H   0.210|   8.0|32.990|I   45.800|I   45.800|    58.610
   INSIDE WIREMAN - ZONE A J|08/22/2004|05/31/2005**|K   29.150|     5.950|G    6.600|      -   |     0.450|L   0.410|   8.0|43.490|M   58.710|M   58.710|    73.930
   CABLE SPLICER - ZONE A J |08/22/2004|05/31/2005**|K   30.150|     5.950|G    6.600|      -   |     0.450|L   0.420|   8.0|44.530|M   60.270|M   60.270|    76.010
   TUNNEL WIREMAN - ZONE A J|08/22/2004|05/31/2005**|K   32.070|     5.950|G    6.600|      -   |     0.450|L   0.450|   8.0|46.540|M   63.280|M   63.280|    80.020
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-010) N          |02/22/2005|09/30/2005**|A   34.410|     7.400|     3.750|O     -   |     0.750|    0.050|   8.0|46.360|P   63.020|Q   79.670|R  112.980
   INSTRUMENTMAN            |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-034) N          |02/22/2005|09/30/2005**|A   32.010|     7.400|     3.750|O     -   |     0.750|    0.050|   8.0|43.960|P   59.420|Q   74.870|R  105.780
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |         |      |      |          |          |
   (869.567-010) N          |02/22/2005|09/30/2005**|A   31.430|     7.400|     3.750|O     -   |     0.750|    0.050|   8.0|43.380|P   58.540|Q   73.710|R  104.040
# GLAZIER                   |08/22/2004|05/31/2005* |E   30.200|S    4.850|     5.350|      -   |     0.350|    0.520|   8.0|41.270|T   56.370|T   56.370|    71.470
  MARBLE FINISHER           |08/22/2004|05/31/2005**|U   20.700|     3.710|     1.900|      -   |     0.200|    0.150|C  8.0|26.660|V   37.010|W   37.010|    47.360
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PAINTER, LEAD ABATEMENT  |08/22/2004|06/30/2005**|K   26.070|     3.450|     2.200|     1.040|     0.500|    0.420|   8.0|33.680|    46.720|    46.720|    46.720
   REPAINT AND LIGHT        |          |            |          |          |          |          |          |         |      |      |          |          |
   COMMERCIAL PAINTER, LEAD |          |            |          |          |          |          |          |         |      |      |          |          |
   ABATEMENT                |08/22/2004|06/30/2005**|K   22.800|     3.450|     2.200|     1.040|     0.500|    0.420|   8.0|30.410|    41.810|    41.810|    41.810
# PLASTERER                 |08/22/2004|08/02/2005* |E   25.290|     4.420|     2.640|     3.050|     0.400|    0.650|   8.0|36.450|    48.600|X   48.600|    60.740
# PLASTER TENDER Y          |08/22/2004|08/02/2005* |    23.290|     4.150|     4.250|Z    3.250|     0.460|    0.550|   8.0|35.950|AA  47.600|AA  47.600|    59.240
   PLASTER CLEAN-UP LABORER |08/22/2004|08/02/2005* |    20.740|     4.150|     4.250|Z    3.250|     0.460|    0.550|   8.0|33.400|AA  43.770|AA  43.770|    54.140
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, INDUSTRIAL AND  |          |            |          |          |          |          |          |         |      |      |          |          |
   GENERAL PIPEFITTER       |08/22/2004|06/30/2005**|U   28.380|     4.520|AB   6.200|AC   2.980|     0.520|    0.450|   8.0|43.050|AD  58.460|AD  58.460|    72.380
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPELAYER                |08/22/2004|06/30/2005**|U   18.980|     4.520|AB   5.910|AC   2.080|     0.390|    0.450|   8.0|32.330|    42.590|C   42.590|    51.810
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPE TRADESMAN AE        |08/22/2004|06/30/2005**|U   12.010|     4.520|     0.250|      -   |     0.080|    0.330|   8.0|17.190|    22.920|C   22.920|    28.660
   SERVICE & REPAIR         |          |            |          |          |          |          |          |         |      |      |          |          |
   (PLUMBER/HVAC-FITTER)    |08/22/2004|06/30/2005**|U   27.340|     4.520|AB   5.960|AC   2.980|     0.190|    0.450|   8.0|41.440|    56.330|AF  56.330|    69.730
   LANDSCAPE/IRRIGATION     |          |            |          |          |          |          |          |         |      |      |          |          |
   FITTER                   |08/22/2004|06/30/2005**|AG  24.230|     4.520|AB   5.730|B     -   |     0.350|    0.250|C  8.0|35.080|    47.190|    47.190|    58.120
   LANDSCAPE/IRRIGATION     |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN AH  |08/22/2004|06/30/2005**|AG  22.870|     4.520|AB   4.280|B     -   |     0.350|    0.250|C  8.0|32.270|    43.710|    43.710|    54.070
   LANDSCAPE/IRRIGATION     |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN AI             |08/22/2004|06/30/2005**|AG  10.970|     2.000|AB   0.750|      -   |     0.050|    0.200|C  8.0|13.970|    19.450|    19.450|    24.940
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND) AJ          |02/22/2005|03/31/2005* |    26.750|     6.100|AK   5.850|      -   |     0.300|    0.100|   8.0|39.100|    52.470|    52.470|    65.850
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND) AL          |02/22/2005|08/31/2005* |    31.680|     6.150|     8.350|B     -   |     0.650|AM  0.250|   8.0|47.080|    62.920|AN  62.920|    78.760
# ROOFER                    |02/22/2005|08/31/2005* |AO  26.250|     3.500|AP   3.470|AQ    -   |     0.200|    0.250|   8.0|33.670|    45.650|    45.650|    57.640
   PITCH WORK               |02/22/2005|08/31/2005* |AO  28.000|     3.500|AP   3.470|AQ    -   |     0.200|    0.250|   8.0|35.420|    48.280|    48.280|    61.140
   PREPARER                 |02/22/2005|08/31/2005* |AO  27.250|     3.500|AP   3.470|AQ    -   |     0.200|    0.250|   8.0|34.670|    47.150|    47.150|    59.640
# SHEET METAL WORKER (HVAC) |02/22/2005|07/31/2005**|E   32.380|     6.600|     6.490|B     -   |     0.690|    0.300|   8.0|46.460|    62.650|AR  62.650|    78.840
# TERRAZZO WORKER           |02/22/2001|08/31/2001* |E   26.780|     3.000|     1.790|B     -   |     0.550|      -  |C  8.0|32.120|AS  45.510|AT  45.510|AU  58.900
   TERRAZZO FINISHER        |02/22/2001|08/31/2001* |E   20.530|     3.000|     1.790|B     -   |     0.550|      -  |C  8.0|25.870|AS  36.140|AT  36.140|AU  46.400
# TILE FINISHER             |08/22/2004|05/31/2005**|U   17.250|     3.710|     1.250|      -   |     0.200|    0.150|C  8.0|22.560|V   31.180|W   31.180|    39.810
# TILE LAYER                |08/22/2004|05/31/2005**|U   27.500|     5.220|     3.950|      -   |     0.200|    0.390|C  8.0|37.260|V   51.010|W   51.010|    64.760
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
B  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
E  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
F  RATE APPLIES TO FIRST 8 HOURS ONLY.  DOUBLE TIME THEREAFTER.  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN
   DURING THE NORMAL WORK WEEK DUE TO INCLEMENT WEATHER.
G  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
H  INCLUDES AN AMOUNT FOR THE NATIONAL LABOR-MANAGEMENT COOPERATION FUND AND THE ADMINISTRATIVE MAINTENANCE FUND.
I  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
J  ZONE A IS DEFINED AS THE PORTION OF THE COUNTY 80 ROAD MILES FROM POST OFFICE, 455 ORANGE SHOW LANE, SAN BERNARDINO. RATES FOR ZONE B WILL BE
   FURNISHED UPON REQUEST.
K  INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
L  IN ADDITION TO THE AMOUNT SHOWN, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR, $0.06 IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES FOR THE LABOR MANAGEMENT COOPERATION COMMITTEE FUND.
M  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.  ALL OVERTIME WORKED DAILY OR ON SATURDAYS,  FOR SERVICE AND REPAIR WORK OTHER THAN NEW WORK,  MAY BE PAID AT THE RATE OF TIME AND
   ONE-HALF.
N  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
O  EMPLOYEE RECEIVES AN AMOUNT EQUAL TO 2% OF THE PRECEDING YEAR'S STRAIGHT-TIME HOURLY EARNINGS AFTER ONE YEAR OF CONTINUOUS SERVICE FOR THE EMPLOYER;
   AN AMOUNT EQUAL TO 4% OF THE PRECEDING YEAR'S STRAIGHT-TIME HOURLY EARNINGS IS PAID AFTER 2 YEARS OF CONTINUOUS SERVICE; AN AMOUNT EQUAL TO 6% OF THE
   PRECEDING YEAR'S STRAIGHT-TIME HOURLY EARNINGS IS PAID AFTER 10 YEARS OF CONTINUOUS SERVICE. WHEN AN EMPLOYEE IS TERMINATED PRIOR TO HAVING 1 YEAR OF
   SERVICE, 2% OF HIS ACCUMULATED STRAIGHT-TIME EARNINGS SHALL BE PAID. WORKERS RECEIVE 8 PAID HOLIDAYS PER YEAR.
P  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SATURDAY OVERTIME HOURLY
   RATE. RATE DOES NOT INCLUDE VACATION/HOLIDAY PAYMENT. PLEASE SEE FOOTNOTE FOR VACATION/HOLIDAY PAYMENT.
Q  RATE DOES NOT INCLUDE VACATION/HOLIDAY PAYMENT. PLEASE SEE FOOTNOTE FOR VACATION/HOLIDAY PAYMENT.
R  RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE. RATE DOES NOT INCLUDE VACATION/HOLIDAY PAYMENT, PLEASE
   SEE FOOTNOTE FOR VACATION/HOLIDAY PAYMENT.
S  INCLUDES AN AMOUNT PER HOUR WORKED OR PAID TO DISABILITY FUND.
T  RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
U  INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
V  RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
W  RATE APPLIES TO THE FIRST 10 HOURS WORKED OR UP TO 50 HOURS IN A GIVEN WEEK. ALL HOURS IN EXCESS OF 10 HOURS OR 50 HOURS ARE AT THE SUNDAY/HOLIDAY
   RATE.
X  RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
Y  THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS:  FOR INSIDE BROWN COATINGS THERE SHALL BE NOT MORE THAN 3 PLASTERERS TO 2 PLASTER
   TENDERS; FOR INSIDE FINISH COATINGS THERE SHALL BE NOT MORE THAN 3 PLASTERERS TO 1 PLASTER TENDER; ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL
   OTHER WORK, THERE SHALL BE NOT MORE THAN 2 PLASTERERS TO 1 PLASTER TENDER.
Z  INCLUDES AN AMOUNT PER HOUR WORKED OR PAID FOR SUPPLEMENTAL DUES.
AA APPLIES TO ALL WORK PERFORMED AFTER THE FIRST EIGHT HOURS ON MONDAY THROUGH FRIDAY AND THE FIRST EIGHT HOURS ON SATURDAY.  ALL OTHER TIME IS PAID AT
   THE SUNDAY AND HOLIDAY OVERTIME RATE.
AB INCLUDES AMOUNT FOR NATIONAL PENSION AND RETIREE'S X-MAS FUND.
AC FACTORED AT 1.5 TIMES FOR ALL OVERTIME.
AD RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
AE PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT  A JOURNEYMAN.
AF SATURDAY MAY BE WORKED AT STRAIGHT-TIME RATE, PROVIDED THAT THE HOURS DO NOT EXCEED 8 HOURS PER DAY OR 40 HOURS PER WEEK.
AG INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF AND ADMINISTRATIVE DUES.
AH THE LANDSCAPE/IRRIGATION ASSISTANT JOURNEYMAN MAY BE UTILIZED ONLY AS THE FIFTH WORKER ON THE JOB.  ADDITIONAL LANDSCAPE/IRRIGATION ASSISTANT
   JOURNEYMEN MAY BE ADDED AS THE 10TH WORKER, 15TH WORKER, 20TH WORKER AND SO ON.
AI TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR
   APPRENTICE LANDSCAPE/IRRIGATION FITTER.  THE 3RD AND 4TH WORKER MAY BE A TRADESMAN.
AJ RATE APPLIES TO REMAINDER OF COUNTY.
AK INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AL APPLIES TO THE CITIES OF ONTARIO AND MONTCLAIR.
AM AMOUNT IS FOR INDUSTRY PROMOTION FUND.
AN RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
AO INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.
AP INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
AQ INCLUDED IN STRAIGHT-TIME HOURLY RATE WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AR SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER, OR REASONS
   BEYOND THE CONTROL OF THE EMPLOYER.
AS RATE APPLIES TO FIRST TWO DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE HOLIDAY OVERTIME HOURLY RATE.
AT RATE APPLIES TO THE FIRST 8 HOURS WORKED ON A SIXTH OR SEVENTH CONSECUTIVE DAY DURING ANY ON CALENDAR WEEK UP TO 50 HOURS IN ANY ON CALENDAR WEEK. 
   ALL OTHER TIME IS PAID AT THE HOLIDAY RATE.
AU RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/DLSR/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINAT

TRAVEL AND/OR SUBSISTENCE PAYMENT: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS
   TO EACH WORKER TO EXECUTE THE WORK.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR EACH CRAFT, CLASSIFICATION, OR TYPE OF WORKER MAY BE OBTAINED FROM THE
   PREVAILING WAGE UNIT AT (415) 703-4774.