GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN BENITO COUNTY

DETERMINATION: SBE-2004-2

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON               |08/22/2004|06/30/2005* |A   31.520|     7.250|     5.830|B     -   |     0.350|    0.300|C  8.0|45.250|D   61.010|D   61.010|    76.770
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |08/22/2004|06/30/2005**|A   31.450|     7.250|     5.650|B     -   |     0.400|    0.100|C  8.0|44.850|    60.575|E   60.575|    76.300
  BRICK TENDER              |08/22/2004|06/30/2005* |F   23.840|     5.040|     3.020|B     -   |     0.150|    0.300|C  8.0|32.350|    44.270|    44.270|    56.190
   1ST 1,500 HOURS G        |08/22/2004|06/30/2005* |F   11.880|     5.040|     3.020|B     -   |     0.150|    0.300|C  8.0|20.390|    26.330|    26.330|    32.270
   2ND 1,500 HOURS G        |08/22/2004|06/30/2005* |F   14.380|     5.040|     3.020|B     -   |     0.150|    0.300|C  8.0|22.890|    30.080|    30.080|    37.270
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   SOFT FLOOR LAYER         |08/22/2004|12/31/2004**|A   34.800|     6.150|     5.050|H     -   |     0.530|    0.340|   8.0|46.870|I   64.270|I   64.270|    81.670
   FLOOR PREPARATION WORKER |08/22/2004|12/31/2004* |A   24.340|     6.150|     4.720|H     -   |      -   |    0.340|   8.0|35.550|I   47.720|I   47.720|    59.890
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIRST 6 MONTHS  |08/22/2004|12/31/2004* |A    9.960|     6.150|     0.140|H     -   |      -   |    0.340|   8.0|16.590|I   21.570|I   21.570|    26.550
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SECOND 6 MONTHS |08/22/2004|12/31/2004* |A   12.180|     6.150|     0.160|H     -   |      -   |    0.340|   8.0|18.830|I   24.920|I   24.920|    31.010
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, THIRD 6 MONTHS  |08/22/2004|12/31/2004* |A   13.390|     6.150|     0.680|H     -   |      -   |    0.340|   8.0|20.560|I   27.255|I   27.255|    33.950
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FOURTH 6 MONTHS |08/22/2004|12/31/2004* |A   14.610|     6.150|     0.940|H     -   |      -   |    0.340|   8.0|22.040|I   29.345|I   29.345|    36.650
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIFTH 6 MONTHS  |08/22/2004|12/31/2004* |A   15.830|     6.150|     1.210|H     -   |      -   |    0.340|   8.0|23.530|I   31.445|I   31.445|    39.360
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SIXTH 6 MONTHS  |08/22/2004|12/31/2004* |A   17.050|     6.150|     2.230|H     -   |      -   |    0.340|   8.0|25.770|I   34.295|I   34.295|    42.820
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SEVENTH 6 MONTHS|08/22/2004|12/31/2004* |A   19.470|     6.150|     3.250|H     -   |      -   |    0.340|   8.0|29.210|I   38.945|I   38.945|    48.680
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, EIGHTH 6 MONTHS |08/22/2004|12/31/2004* |A   21.910|     6.150|     4.290|H     -   |      -   |    0.340|   8.0|32.690|I   43.645|I   43.645|    54.600
   FLOOR COVERING HANDLER   |08/22/2004|12/31/2004* |A   13.920|     6.150|     2.020|H     -   |      -   |    0.340|   8.0|22.430|I   29.390|I   29.390|    36.350
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIRST 3 MONTHS  |08/22/2004|12/31/2004* |A   11.130|     6.150|     1.620|H     -   |      -   |    0.340|   8.0|19.240|I   24.805|I   24.805|    30.370
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SECOND 3 MONTHS |08/22/2004|12/31/2004* |A   12.530|     6.150|     1.820|H     -   |      -   |    0.340|   8.0|20.840|I   27.105|I   27.105|    33.370
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |08/22/2004|11/30/2004**|    24.570|     4.450|J    2.850|      -   |     0.650|K   0.160|   8.0|33.540|L   46.255|L   46.255|    58.970
   COMM & SYSTEM TECH.      |08/22/2004|11/30/2004**|    27.980|     4.450|J    2.850|      -   |     0.650|K   0.160|   8.0|37.070|L   51.550|L   51.550|    66.030
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |         |      |      |          |          |
   TECHNICIAN               |08/22/2004|12/26/2004**|M   32.810|N    7.150|O    8.090|      -   |N    0.600|P   0.200|   8.0|50.080|Q   75.020|Q   75.020|    99.960
   CABLE SPLICER            |08/22/2004|12/26/2004**|M   36.910|N    7.150|O    8.090|      -   |N    0.600|P   0.200|   8.0|54.340|Q   81.410|Q   81.410|   108.480
   INSIDE WIREMAN (WHEN     |          |            |          |          |          |          |          |         |      |      |          |          |
   WELDING)                 |08/22/2004|12/26/2004**|M   36.090|N    7.150|O    8.090|      -   |N    0.600|P   0.200|   8.0|53.480|Q   80.120|Q   80.120|   106.760
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-010) R          |02/22/2004|02/28/2005* |    34.120|     7.850|S    4.250|T    3.100|     0.590|    0.160|   8.0|50.070|    67.130|    67.130|    84.190
   INSTRUMENTMAN            |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-034) R          |02/22/2004|02/28/2005* |    31.030|     7.850|S    4.250|T    3.100|     0.590|    0.160|   8.0|46.980|    62.495|    62.495|    78.010
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |         |      |      |          |          |
   (869.567-010) R          |02/22/2004|02/28/2005* |    28.150|     7.850|S    4.250|T    3.100|     0.590|    0.160|   8.0|44.100|    58.175|    58.175|    72.250
# GLAZIER                   |08/22/2004|06/30/2005* |A   34.670|     5.400|     6.500|B     -   |     0.400|U   0.280|   8.0|47.250|V   64.585|    81.920|    81.920
# MARBLE FINISHER           |08/22/2003|07/31/2004* |A   22.770|     4.420|     2.750|     2.850|     0.250|      -  |   8.0|33.040|W   44.425|    55.810|    55.810
# MARBLE SETTER X           |08/22/2004|07/31/2005**|A   31.390|     7.250|     7.660|     4.000|     0.350|    0.110|   8.0|50.760|Y   65.710|    80.660|    80.660
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   BRUSH AND SPRAY          |08/22/2004|06/30/2005**|F   29.110|     5.840|S    6.820|H     -   |     0.250|    0.380|C  8.0|42.400|    56.955|    56.955|    71.510
   INDUSTRIAL PAINTER       |08/22/2004|06/30/2005**|F   29.360|     5.840|S    6.820|H     -   |     0.250|    0.380|C  8.0|42.650|    57.330|    57.330|    72.010
   SANDBLASTER, STEAM       |          |            |          |          |          |          |          |         |      |      |          |          |
   CLEANER, WATERBLASTER    |08/22/2004|06/30/2005**|F   29.610|     5.840|S    6.820|H     -   |     0.250|    0.380|C  8.0|42.900|    57.705|    57.705|    72.510
   EXOTIC MATERIALS         |08/22/2004|06/30/2005**|F   29.860|     5.840|S    6.820|H     -   |     0.250|    0.380|C  8.0|43.150|    58.080|    58.080|    73.010
   PAPERHANGER/WALLCOVERING |08/22/2004|06/30/2005**|F   30.110|     5.840|S    6.820|H     -   |     0.250|    0.380|C  8.0|43.400|    58.455|    58.455|    73.510
   TAPER                    |08/22/2004|07/31/2005**|A   28.740|     5.840|     5.580|     1.700|     0.250|    0.210|   8.0|42.320|    56.690|C   56.690|    71.060
   TAPER CLEAN-UP           |08/22/2004|07/31/2005* |A   13.290|     5.840|      -   |      -   |      -   |      -  |   8.0|19.130|    25.775|C   25.775|    32.420
# PLASTERER                 |08/22/2004|06/30/2005* |A   25.660|     5.980|     4.000|     3.750|     0.500|      -  |   8.0|39.890|    52.220|C   52.220|Z   64.550
# PLASTER TENDER            |08/22/2004|06/30/2005* |A   26.200|     5.030|     3.120|     1.600|     0.150|AA  0.150|   8.0|36.250|AB  49.160|AB  49.160|    62.070
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |08/22/2004|06/30/2005* |    22.750|     2.950|     2.300|     1.700|     0.300|    0.600|C  8.0|30.600|    41.975|    41.975|Z   53.350
   LANDSCAPE PIPEFITTER     |08/22/2004|06/30/2005* |    22.750|     2.950|     2.300|     1.700|     0.300|    0.550|C  8.0|30.550|    41.925|    41.925|Z   53.300
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN AC  |08/22/2004|06/30/2005* |    12.750|     2.950|     2.300|     1.700|     0.300|    0.600|C  8.0|20.600|    26.975|    26.975|Z   33.350
   LANDSCAPE ASSISTANT      |          |            |          |          |          |          |          |         |      |      |          |          |
   JOURNEYMAN               |08/22/2004|06/30/2005* |    12.750|     2.950|     2.300|     1.700|     0.300|    0.550|C  8.0|20.550|    26.925|    26.925|Z   33.300
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN I AC           |08/22/2004|06/30/2005* |     8.750|     2.950|      -   |     1.700|     0.300|    0.600|C  8.0|14.300|    18.675|    18.675|Z   23.050
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN II AC          |08/22/2004|06/30/2005* |     8.750|     2.950|     2.300|     1.700|     0.300|    0.600|C  8.0|16.600|    20.975|    20.975|Z   25.350
   LANDSCAPE TRADESMAN I AD |08/22/2004|06/30/2005* |     8.750|     2.950|      -   |     1.700|     0.300|    0.550|C  8.0|14.250|    18.625|    18.625|Z   23.000
   LANDSCAPE TRADESMAN II AD|08/22/2004|06/30/2005* |     8.750|     2.950|     2.300|     1.700|     0.300|    0.550|C  8.0|16.550|    20.925|    20.925|Z   25.300
   PLUMBER, STEAMFITTER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   REFRIGERATION FITTER     |          |            |          |          |          |          |          |         |      |      |          |          |
   (HVAC)                   |08/22/2004|06/30/2005**|A   44.010|     9.210|     4.120|B     -   |     1.100|    0.650|   8.0|59.090|D   80.460|D   80.460|   101.830
   REFRIGERATION TRADESMAN  |          |            |          |          |          |          |          |         |      |      |          |          |
   (YEAR 2)                 |08/22/2004|06/30/2005* |A   14.060|     7.370|     0.500|B     -   |      -   |    0.250|   8.0|22.180|    29.085|    29.085|    29.085
   REFRIGERATION TRADESMAN  |          |            |          |          |          |          |          |         |      |      |          |          |
   (YEAR 3)                 |08/22/2004|06/30/2005* |A   19.660|     7.370|     0.500|B     -   |      -   |    0.250|   8.0|27.780|    37.435|    37.435|    37.435
   REFRIGERATION TRADESMAN  |          |            |          |          |          |          |          |         |      |      |          |          |
   (YEAR 4)                 |08/22/2004|06/30/2005* |A   21.040|     7.370|     0.500|B     -   |      -   |    0.250|   8.0|29.160|    39.505|    39.505|    39.505
   REFRIGERATION TRADESMAN  |          |            |          |          |          |          |          |         |      |      |          |          |
   (YEAR 5)                 |08/22/2004|06/30/2005* |A   24.030|     7.370|     2.250|B     -   |      -   |    0.250|   8.0|33.900|    45.740|    45.740|    45.740
   SERVICE AND REPAIR       |08/22/2004|06/30/2005**|A   44.010|     9.210|     4.120|B     -   |     1.100|    0.650|   8.0|59.090|    80.460|AE  80.460|    80.460
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND)             |08/22/2004|12/31/2004**|    27.350|     6.100|AF   5.800|      -   |     0.300|    0.100|   8.0|39.650|    53.325|    53.325|    67.000
# ROOFER                    |08/22/2004|07/31/2005* |    24.650|     5.790|     3.000|     3.110|     0.200|    0.250|C  8.0|37.000|    49.325|    49.325|    61.650
   BITUMASTIC, ENAMELER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPE WRAPPER, COAL TAR   |          |            |          |          |          |          |          |         |      |      |          |          |
   PITCH BUILD-UP           |08/22/2004|07/31/2005* |    26.650|     5.790|     3.000|     3.110|     0.200|    0.250|C  8.0|39.000|    52.325|    52.325|    65.650
   MASTIC WORKER, KETTLEMAN |08/22/2004|07/31/2005* |    24.900|     5.790|     3.000|     3.110|     0.200|    0.250|C  8.0|37.250|    49.700|    49.700|    62.150
# SHEET METAL WORKER (HVAC) |          |            |          |          |          |          |          |         |      |      |          |          |
   ZONE 1 (UNDER 20 MILES)  |          |            |          |          |          |          |          |         |      |      |          |          |
   AG                       |08/22/2004|06/30/2005**|A   30.860|     7.550|AH   7.590|B     -   |     0.790|    0.520|C  8.0|47.310|Q   63.410|Q   63.410|    79.510
   FOR SERVICE AND REPAIR   |08/22/2004|06/30/2005**|A   30.860|     7.550|AH   7.590|B     -   |     0.790|    0.520|C  8.0|47.310|AI  63.410|AI  63.410|AI  63.410
   METAL DECK & SIDING      |08/22/2004|06/30/2005* |F   30.410|     7.530|     7.890|B     -   |     0.270|    0.440|   8.0|46.540|Q   61.745|Q   61.745|    76.950
# TERRAZZO WORKER           |02/22/2004|06/30/2004**|AJ  34.950|     4.850|     6.650|B     -   |     0.100|    0.100|   7.0|46.650|AK  61.765|AK  61.765|    76.880
   TERRAZZO FINISHER        |02/22/2004|06/30/2004**|AJ  24.870|     4.600|     3.050|B     -   |     0.050|    0.200|   7.0|32.770|AK  44.130|AK  44.130|    55.490
# TILE FINISHER             |02/22/2004|03/31/2004* |A   17.910|AL   4.150|AL   2.870|     0.700|AL   0.250|    0.100|   8.0|25.980|    27.565|C   27.565|    36.520
   RED CIRCLED FINISHER     |02/22/2004|03/31/2004* |A   23.670|AL   4.150|AL   3.100|     1.300|AL   0.250|    0.100|   8.0|32.570|    36.810|C   36.810|    48.640
# TILE SETTER               |02/22/2004|03/31/2004* |A   32.480|AL   4.150|AL   4.100|     2.350|AL   0.250|    0.100|   8.0|43.430|    51.070|C   51.070|    67.310
  WATER WELL DRILLER        |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AM   0.630|      -   |      -  |   8.0|17.310|AN  23.660|AN  23.660|AN  23.660
   PUMP INSTALLER           |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AM   0.630|      -   |      -  |   8.0|17.310|AN  23.660|AN  23.660|AN  23.660
   HELPER                   |08/22/1998|12/31/1998* |    10.380|     3.200|     0.780|AO   0.520|      -   |      -  |   8.0|14.880|AN  20.070|AN  20.070|AN  20.070
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
E  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
F  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
G  THE EMPLOYER SHALL NOT BE PERMITTED AN ENTRY LEVEL MASON TENDER UNLESS A REGULAR MASON TENDER IS EMPLOYED. AN EMPLOYER SHALL NOT BE PERMITTED TO
   EMPLOY A SECOND ENTRY LEVEL MASON TENDER UNTIL FOUR (4) REGULAR MASON TENDERS ARE EMPLOYED.
H  INCLUDED IN BASIC HOURLY RATE.
I  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
J  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
K  IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES.
L  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   RATE.
M  ALL OF SANTA CRUZ, MONTEREY, AND SAN BENITO COUNTIES WITHIN TWENTY-FIVE (25) AIR-MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN AREA
   EXTENDING FIVE (5) MILES EAST AND WEST OF HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY LINE.  FOR WAGE RATES IN AN AREA OUTSIDE OF THIS
   DESCRIPTION, PLEASE CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH.
N  CONTRIBUTION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR WORKED.
O  CONTRIBUTION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR WORKED. IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE HOURLY RATE IS
   ADDED TO THE DAILY AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
P  IN ADDITION, .75% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
Q  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
R  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
S  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
T  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
U  INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
V  RATE APPLIES TO THE FIRST 2 OVERTIME HOURS; ALL OTHER TIME IS PAID AT THE SATURDAY OVERTIME HOURLY RATE.
W  RATE ONLY APPLIES TO THE FIRST DAILY OVERTIME HOUR WORKED, MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME HOURS ARE PAID AT THE SATURDAY, SUNDAY, AND
   HOLIDAY OVERTIME RATE.
X  EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $10.00 PER DAY ABOVE THE WAGE RATE.
Y  RATE APPLIES TO FIRST OVERTIME HOUR ONLY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
Z  RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
AA AMOUNT IS FOR INDUSTRY PROMOTION FUND.
AB ALL HOURS OVER 48 HOURS PER WEEK ARE AT THE SUNDAY & HOLIDAY RATE
AC THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AD THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT
   PERIOD, MAY BE PERFORMED BY LANDSCAPE IRRIGATION TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN.
AE SATURDAY MAY BE PAID AT STRAIGHT TIME IF THE WORK WEEK IS TUESDAY THROUGH SATURDAY.
AF INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AG RATES FOR OTHER ZONES WILL BE FURNISHED UPON REQUEST
AH AN AMOUNT EQUAL TO 3% OF WAGES AND EMPLOYEE BENEFITS (EXCLUDING TRAINING) IS ADDED FOR NATIONAL SASMI FUND (WAGE STABILIZATION PLAN).  THIS AMOUNT IS
   FACTORED INTO OVERTIME HOURLY RATE.
AI THIS RATE APPLIES TO ALL HOURS WORKED OVER EIGHT(8) HOURS PER DAY OR OVER FORTY (40) HOUR WORKED PER CONSECUTIVE WORK WEEK.
AJ INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AK RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
AL NOT INCLUDED IN THE OVERTIME HOURLY RATE.
AM RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
AN RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY
   ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
AO RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.