GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: MONTEREY COUNTY

DETERMINATION: MTY-2004-2

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER, |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND SHIFT             |08/22/2004|11/30/2004**|    25.320|     4.450|A    2.850|      -   |     0.650|B   0.160|   8.0|34.320|    47.425|C   47.425|D   60.530
   COMM & SYSTEM INSTALLER, |          |            |          |          |          |          |          |         |      |      |          |          |
   THIRD SHIFT              |08/22/2004|11/30/2004**|    25.570|     4.450|A    2.850|      -   |     0.650|B   0.160|   8.0|34.580|    47.815|C   47.815|D   61.050
   COMM & SYSTEM TECH.,     |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND SHIFT             |08/22/2004|11/30/2004**|    28.730|     4.450|A    2.850|      -   |     0.650|B   0.160|   8.0|37.840|    52.705|C   52.705|D   67.570
   COMM & SYSTEM TECH.,     |          |            |          |          |          |          |          |         |      |      |          |          |
   THIRD SHIFT              |08/22/2004|11/30/2004**|    28.980|     4.450|A    2.850|      -   |     0.650|B   0.160|   8.0|38.100|    53.095|C   53.095|D   68.090
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |         |      |      |          |          |
   TECHNICIAN SECOND SHIFT  |08/22/2004|12/26/2004**|E   36.090|F    7.150|G    8.090|      -   |F    0.600|H   0.200|I  7.5|53.480|J   80.120|J   80.120|   106.760
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |         |      |      |          |          |
   TECHNICIAN THIRD SHIFT   |08/22/2004|12/26/2004**|E   37.730|F    7.150|G    8.090|      -   |F    0.600|H   0.200|K  7.0|55.180|J   82.670|J   82.670|   110.160
   CABLE SPLICER SECOND     |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT                    |08/22/2004|12/26/2004**|E   40.600|F    7.150|G    8.090|      -   |F    0.600|H   0.200|I  7.5|58.160|J   87.140|J   87.140|   116.120
   CABLE SPLICER THIRD SHIFT|08/22/2004|12/26/2004**|E   42.450|F    7.150|G    8.090|      -   |F    0.600|H   0.200|K  7.0|60.080|J   90.020|J   90.020|   119.960
   INSIDE WIREMAN (WHEN     |          |            |          |          |          |          |          |         |      |      |          |          |
   WELDING) - 2ND SHIFT     |08/22/2004|12/26/2004**|E   39.700|F    7.150|G    8.090|      -   |F    0.600|H   0.200|I  7.5|57.230|J   85.745|J   85.745|   114.260
   INSIDE WIREMAN (WHEN     |          |            |          |          |          |          |          |         |      |      |          |          |
   WELDING) - 3RD SHIFT     |08/22/2004|12/26/2004**|E   41.500|F    7.150|G    8.090|      -   |F    0.600|H   0.200|K  7.0|59.095|J   88.540|J   88.540|   117.990
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
B  IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES.
C  DISREGARD THIS RATE.  USE THE SATURDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE
   DETERMINATIONS.
D  DISREGARD THIS RATE.  USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING
   WAGE DETERMINATIONS.
E  ALL OF SANTA CRUZ, MONTEREY, AND SAN BENITO COUNTIES WITHIN TWENTY-FIVE (25) AIR-MILES OF HIGHWAY 1 AND DOLAN ROAD IN MOSS LANDING, AND AN AREA
   EXTENDING FIVE (5) MILES EAST AND WEST OF HIGHWAY 101 SOUTH TO THE SAN LUIS OBISPO COUNTY LINE.  FOR WAGE RATES IN AN AREA OUTSIDE OF THIS
   DESCRIPTION, PLEASE CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH.
F  CONTRIBUTION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR WORKED.
G  CONTRIBUTION IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR WORKED. IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE HOURLY RATE IS
   ADDED TO THE DAILY AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES BENEFIT BOARD.
H  IN ADDITION, .75% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
I  8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE
J  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
K  8 HOURS PAY FOR 7 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE.