GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: MERCED COUNTY

DETERMINATION: MER-2004-1

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON               |02/22/2004|06/30/2004**|A   27.100|     4.850|     5.200|B     -   |     0.350|    0.300|C  8.0|37.800|D   51.350|D   51.350|    64.900
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |02/22/2004|06/30/2004**|A   26.950|     4.850|     4.300|B     -   |     0.350|    0.100|C  8.0|36.550|    50.025|E   50.025|    63.500
  BRICK TENDER              |08/22/2003|06/30/2004**|F   23.840|     4.440|     2.770|B     -   |     0.150|      -  |C  8.0|31.200|D   43.120|D   43.120|    55.040
   1ST 1,500 HOURS G        |08/22/2003|06/30/2004* |F   11.800|     4.440|     2.770|B     -   |     0.150|      -  |C  8.0|19.160|D   25.060|D   25.060|    30.960
   2ND 1,500 HOURS G        |08/22/2003|06/30/2004* |F   14.300|     4.440|     2.770|B     -   |     0.150|      -  |C  8.0|21.660|D   28.810|D   28.810|    35.960
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   SOFT FLOOR LAYER H       |02/22/2004|06/30/2004**|A   34.050|     6.150|     5.050|I     -   |     0.530|    0.340|   8.0|46.120|J   63.145|J   63.145|    80.170
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   H                        |02/22/2004|06/30/2004* |A   23.810|     6.150|     4.720|I     -   |      -   |    0.340|   8.0|35.020|J   46.925|J   46.925|    58.830
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIRST 6 MONTHS H|02/22/2004|06/30/2004* |A    9.720|     6.150|     0.140|I     -   |      -   |    0.340|   8.0|16.350|J   21.210|J   21.210|    26.070
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SECOND 6 MONTHS |          |            |          |          |          |          |          |         |      |      |          |          |
   H                        |02/22/2004|06/30/2004* |A   11.910|     6.150|     0.160|I     -   |      -   |    0.340|   8.0|18.560|J   24.515|J   24.515|    30.470
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, THIRD 6 MONTHS H|02/22/2004|06/30/2004* |A   13.100|     6.150|     0.680|I     -   |      -   |    0.340|   8.0|20.270|J   26.820|J   26.820|    33.370
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FOURTH 6 MONTHS |          |            |          |          |          |          |          |         |      |      |          |          |
   H                        |02/22/2004|06/30/2004* |A   14.290|     6.150|     0.940|I     -   |      -   |    0.340|   8.0|21.720|J   28.865|J   28.865|    36.010
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIFTH 6 MONTHS H|02/22/2004|06/30/2004* |A   15.480|     6.150|     1.210|I     -   |      -   |    0.340|   8.0|23.180|J   30.920|J   30.920|    38.660
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SIXTH 6 MONTHS H|02/22/2004|06/30/2004* |A   16.670|     6.150|     2.230|I     -   |      -   |    0.340|   8.0|25.390|J   33.725|J   33.725|    42.060
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SEVENTH 6       |          |            |          |          |          |          |          |         |      |      |          |          |
   MONTHS H                 |02/22/2004|06/30/2004* |A   19.050|     6.150|     3.250|I     -   |      -   |    0.340|   8.0|28.790|J   38.315|J   38.315|    47.840
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, EIGHTH 6 MONTHS |          |            |          |          |          |          |          |         |      |      |          |          |
   H                        |02/22/2004|06/30/2004* |A   21.430|     6.150|     4.290|I     -   |      -   |    0.340|   8.0|32.210|J   42.925|J   42.925|    53.640
   FLOOR COVERING HANDLER H |02/22/2004|06/30/2004* |A   13.620|     6.150|     2.020|I     -   |      -   |    0.340|   8.0|22.130|J   28.940|J   28.940|    35.750
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIRST 3 MONTHS H|02/22/2004|06/30/2004* |A   10.890|     6.150|     1.620|I     -   |      -   |    0.340|   8.0|19.000|J   24.445|J   24.445|    29.890
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SECOND 3 MONTHS |          |            |          |          |          |          |          |         |      |      |          |          |
   H                        |02/22/2004|06/30/2004* |A   12.260|     6.150|     1.820|I     -   |      -   |    0.340|   8.0|20.570|J   26.700|J   26.700|    32.830
   RESILIENT TILE LAYER K   |08/22/2003|05/31/2004* |A   25.450|     4.590|     3.500|I     -   |     0.330|      -  |   8.0|33.870|    46.595|    46.595|    59.320
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2002|11/30/2002* |    21.190|     2.200|L    2.600|      -   |     0.600|      -  |   8.0|27.230|    38.145|    38.145|    49.060
   COMM & SYSTEM TECH.      |02/22/2002|11/30/2002* |    24.130|     2.200|L    2.600|      -   |     0.600|      -  |   8.0|30.250|    42.675|    42.675|    55.100
   INSIDE WIREMAN           |02/22/2004|06/30/2004**|M   30.070|     5.100|L    5.300|B     -   |     1.200|N   0.010|   8.0|43.630|O   60.240|O   60.240|    76.850
   CABLE SPLICER            |02/22/2004|06/30/2004**|M   33.080|     5.100|L    5.300|B     -   |     1.320|N   0.010|   8.0|46.960|O   65.235|O   65.235|    83.510
   HEADING WIREMAN          |02/22/2004|06/30/2004**|M   31.920|     5.100|L    5.300|B     -   |     1.280|N   0.010|   8.0|45.690|O   63.330|O   63.330|    80.970
   HEADING CABLE SPLICER    |02/22/2004|06/30/2004**|M   35.110|     5.100|L    5.300|B     -   |     1.400|N   0.010|   8.0|49.200|O   68.595|O   68.595|    87.990
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-010) P          |02/22/2004|02/28/2005* |    34.120|     7.850|Q    4.250|R    3.100|     0.590|    0.160|   8.0|50.070|    67.130|    67.130|    84.190
   INSTRUMENTMAN            |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-034) P          |02/22/2004|02/28/2005* |    31.030|     7.850|Q    4.250|R    3.100|     0.590|    0.160|   8.0|46.980|    62.495|    62.495|    78.010
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |         |      |      |          |          |
   (869.567-010) P          |02/22/2004|02/28/2005* |    28.150|     7.850|Q    4.250|R    3.100|     0.590|    0.160|   8.0|44.100|    58.175|    58.175|    72.250
# GLAZIER                   |08/22/2003|06/30/2004* |A   25.450|     5.030|     4.620|B     -   |     0.420|      -  |   8.0|35.520|S   48.245|S   48.245|    60.970
# MARBLE FINISHER           |08/22/2003|07/31/2004* |A   22.770|     4.420|     2.750|     2.850|     0.250|      -  |   8.0|33.040|T   44.425|    55.810|    55.810
# MARBLE SETTER U           |02/22/2004|07/31/2004**|A   32.290|     4.850|     7.660|     4.000|     0.450|    0.010|   8.0|49.260|V   64.660|    80.060|    80.060
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   TAPER                    |08/22/2003|07/31/2004**|A   28.090|     5.340|     5.580|     1.700|     0.250|      -  |   8.0|40.960|    55.005|C   55.005|    69.050
   TAPER CLEAN-UP           |08/22/2003|07/31/2004* |A   12.920|     5.340|      -   |      -   |      -   |      -  |   8.0|18.260|    24.720|C   24.720|    31.180
   BRUSH, SPRAY, PAPERHANGER|02/22/2004|10/31/2004**|W   22.070|     5.340|     4.160|I     -   |     0.250|X   0.110|   8.0|31.930|    42.965|    42.965|    42.965
   SANDBLASTER, STEAM       |          |            |          |          |          |          |          |         |      |      |          |          |
   CLEANER, WATERBLASTER    |02/22/2004|10/31/2004**|W   23.070|     5.340|     4.160|I     -   |     0.250|X   0.110|   8.0|32.930|    44.465|    44.465|    44.465
   SPECIAL COATING          |02/22/2004|10/31/2004**|W   23.820|     5.340|     4.160|I     -   |     0.250|X   0.110|   8.0|33.680|    45.590|    45.590|    45.590
# PLASTERER                 |08/22/2003|06/30/2004**|A   22.840|     5.480|     4.500|     3.750|     0.500|      -  |   8.0|37.070|    47.990|C   47.990|Y   58.910
  PLASTER TENDER            |02/22/2004|06/30/2004**|    22.580|     4.590|     2.570|     2.270|     0.340|    0.020|   8.0|32.370|J   43.660|J   43.660|    54.950
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, STEAMFITTER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   REFRIGERATION FITTER     |          |            |          |          |          |          |          |         |      |      |          |          |
   (HVAC)                   |02/22/2004|06/30/2004**|    29.500|     5.570|     6.660|B     -   |     0.750|    0.970|   8.0|43.450|D   58.200|D   58.200|    72.950
   PIPE TRADESMAN           |02/22/2004|06/30/2004* |    12.000|     3.500|     1.000|B     -   |     0.750|    0.970|   8.0|18.220|D   24.220|D   24.220|    30.220
   UNDERGROUND              |          |            |          |          |          |          |          |         |      |      |          |          |
   UTILITY/LANDSCAPE        |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |08/22/2003|06/30/2004**|    22.600|     2.850|     2.150|     1.550|     0.250|      -  |C  8.0|29.400|    40.700|    40.700|Y   52.000
   UNDERGROUND              |          |            |          |          |          |          |          |         |      |      |          |          |
   UTILITY/LANDSCAPE        |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN Z   |08/22/2003|06/30/2004**|    12.600|     2.850|     2.150|     1.550|     0.250|      -  |C  8.0|19.400|    25.700|    25.700|Y   32.000
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN Z              |08/22/2003|06/30/2004**|     8.600|     2.850|     2.150|     1.550|     0.250|      -  |C  8.0|15.400|    19.700|    19.700|Y   24.000
   LANDSCAPE TRADESMAN I AA |08/22/2003|06/30/2004**|     8.600|     2.850|      -   |     1.550|     0.250|      -  |C  8.0|13.250|    17.550|    17.550|Y   21.850
   LANDSCAPE TRADESMAN II AA|08/22/2003|06/30/2004**|     8.600|     2.850|     2.150|     1.550|     0.250|      -  |C  8.0|15.400|    19.700|    19.700|Y   24.000
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND)             |02/22/2004|03/31/2004**|    27.350|     4.900|AB   5.800|      -   |     0.250|    0.100|   8.0|38.400|    52.075|    52.075|    65.750
# ROOFER                    |08/22/2001|09/30/2001* |&    9.750|AC   3.600|AC   2.000|      -   |AC   0.200|      -  |   8.0|15.550|    20.425|    20.425|    20.425
# SHEET METAL WORKER (HVAC) |02/22/2004|06/30/2004**|F   28.500|     5.380|AD   7.010|B     -   |     0.620|    0.360|   8.0|41.870|AE  56.120|AE  56.120|AF  70.370
   METAL DECK & SIDING      |02/22/2004|06/30/2004* |F   32.540|     5.380|     6.620|B     -   |     0.450|    0.300|   8.0|45.290|O   61.560|O   61.560|    77.830
# TERRAZZO WORKER           |02/22/2004|06/30/2004**|AG  34.950|     4.850|     6.650|B     -   |     0.100|    0.100|   7.0|46.650|AE  61.765|AE  61.765|    76.880
   TERRAZZO FINISHER        |02/22/2004|06/30/2004**|AG  24.870|     4.600|     3.050|B     -   |     0.050|    0.200|   7.0|32.770|AE  44.130|AE  44.130|    55.490
# TILE FINISHER             |08/22/2003|03/31/2004* |A   17.020|AH   4.050|AH   2.250|     1.300|AH   0.200|      -  |   8.0|24.820|    26.830|C   26.830|    35.340
# TILE SETTER               |02/22/2004|03/31/2004* |A   23.820|AH   4.050|AH   3.500|     2.350|AH   0.200|    0.050|   8.0|33.970|    38.080|C   38.080|    49.990
  WATER WELL DRILLER        |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AI   0.630|      -   |      -  |   8.0|17.310|AJ  23.660|AJ  23.660|AJ  23.660
   PUMP INSTALLER           |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AI   0.630|      -   |      -  |   8.0|17.310|AJ  23.660|AJ  23.660|AJ  23.660
   HELPER                   |08/22/1998|12/31/1998* |    10.380|     3.200|     0.780|AK   0.520|      -   |      -  |   8.0|14.880|AJ  20.070|AJ  20.070|AJ  20.070
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
E  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
F  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
G  THE EMPLOYER SHALL NOT BE PERMITTED AN ENTRY LEVEL MASON TENDER UNLESS A REGULAR MASON TENDER IS EMPLOYED. AN EMPLOYER SHALL NOT BE PERMITTED TO
   EMPLOY A SECOND ENTRY LEVEL MASON TENDER UNTIL FOUR (4) REGULAR MASON TENDERS ARE EMPLOYED.
H  THAT PORTION OF THE COUNTY, WEST OF THE SAN JOAQUIN RIVER.
I  INCLUDED IN BASIC HOURLY RATE.
J  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
K  RATE APPLIES TO REMAINDER OF COUNTY.
L  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
M  RATE APPLIES TO WORK LOCATED 0-10 AIR MILES FROM THE CITY HALLS OF LIVINGSTON AND MERCED (ZONE A).  PLEASE CONTACT THE DIVISION OF LABOR STATISTICS
   AND RESEARCH FOR RATES OUTSIDE OF ZONE A.
N  IN ADDITION, 3.5% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE LABOR MANAGEMENT COOPERATIVE TRUST AND
   NEIF
O  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
P  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
Q  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
R  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
S  RATE APPLIES TO THE FIRST 4 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
T  RATE ONLY APPLIES TO THE FIRST DAILY OVERTIME HOUR WORKED, MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME HOURS ARE PAID AT THE SATURDAY, SUNDAY, AND
   HOLIDAY OVERTIME RATE.
U  EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $10.00 PER DAY ABOVE THE WAGE RATE.
V  RATE APPLIES TO FIRST OVERTIME HOUR ONLY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
W  INCLUDES AMOUNT WITHHELD FOR DUES CHECK-OFF, ORGANIZING DUES, BENEFICIAL AND HOLIDAY.
X  INCLUDES AMOUNTS FOR PAINTERS & ALLIED TRADES LABOR MANAGEMENT COOPERATION INITIATIVE (P&AT LMCI) AND WORK PRESERVATION FUND.
Y  RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
Z  THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AA THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT
   PERIOD, MAY BE PERFORMED BY LANDSCAPE IRRIGATION TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN.
AB INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AC THESE FRINGE BENEFITS COME FROM THE DAVIS-BACON WAGE RATE FOR THE APPLICABLE CRAFT/CLASSIFICATION IN THIS AREA
AD INCLUDES $0.25 FOR SUPPLEMENTAL PENSION FOR THE FIRST YEAR OF EMPLOYMENT.  ADDITIONAL CONTRIBUTIONS ARE AS FOLLOWS:  $1.00 AFTER 1 YEAR; $2.00 AFTER 2
   YEARS; $3.00 AFTER 5 YEARS; $4.00 AFTER 10 YEARS.
AE RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
AF FOR THE FOLLOWING HOLIDAYS, THE 1 1/2 SATURDAY RATE APPLIES: A) THE FRIDAY BEFORE LABOR DAY; B) WHEN ANY OF THE REGULAR HOLIDAYS FALL ON SUNDAY, THE
   FOLLOWING MONDAY SHALL BE A HOLIDAY; C) WHEN ANY OF THE REGULAR HOLIDAYS FALL ON SATURDAY, THE FRIDAY BEFORE SHALL BE A HOLIDAY; AND D) THE FRIDAY
   FOLLOWING THANKSGIVING DAY.
AG INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AH NOT INCLUDED IN THE OVERTIME HOURLY RATE.
AI RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
AJ RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY
   ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
AK RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.