GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: ALAMEDA COUNTY

DETERMINATION: ALA-2004-1

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON               |02/22/2004|06/30/2004**|A   32.420|     4.850|     5.830|B     -   |     0.350|    0.300|C  8.0|43.750|D   59.960|D   59.960|    76.170
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |02/22/2004|06/30/2004**|A   32.350|     4.850|     5.650|B     -   |     0.400|    0.100|C  8.0|43.350|    59.525|E   59.525|    75.700
  BRICK TENDER              |08/22/1999|06/30/2000* |A   21.300|     3.460|     6.300|B     -   |     0.100|      -  |   8.0|31.160|F   41.810|F   41.810|    52.460
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   SOFT FLOOR LAYER         |02/22/2004|06/30/2004**|A   34.050|     6.150|     5.050|G     -   |     0.530|    0.340|   8.0|46.120|H   63.145|H   63.145|    80.170
   FLOOR PREPARATION WORKER |02/22/2004|06/30/2004* |A   23.810|     6.150|     4.720|G     -   |      -   |    0.340|   8.0|35.020|H   46.925|H   46.925|    58.830
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIRST 6 MONTHS  |02/22/2004|06/30/2004* |A    9.720|     6.150|     0.140|G     -   |      -   |    0.340|   8.0|16.350|H   21.210|H   21.210|    26.070
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SECOND 6 MONTHS |02/22/2004|06/30/2004* |A   11.910|     6.150|     0.160|G     -   |      -   |    0.340|   8.0|18.560|H   24.515|H   24.515|    30.470
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, THIRD 6 MONTHS  |02/22/2004|06/30/2004* |A   13.100|     6.150|     0.680|G     -   |      -   |    0.340|   8.0|20.270|H   26.820|H   26.820|    33.370
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FOURTH 6 MONTHS |02/22/2004|06/30/2004* |A   14.290|     6.150|     0.940|G     -   |      -   |    0.340|   8.0|21.720|H   28.865|H   28.865|    36.010
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIFTH 6 MONTHS  |02/22/2004|06/30/2004* |A   15.480|     6.150|     1.210|G     -   |      -   |    0.340|   8.0|23.180|H   30.920|H   30.920|    38.660
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SIXTH 6 MONTHS  |02/22/2004|06/30/2004* |A   16.670|     6.150|     2.230|G     -   |      -   |    0.340|   8.0|25.390|H   33.725|H   33.725|    42.060
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SEVENTH 6 MONTHS|02/22/2004|06/30/2004* |A   19.050|     6.150|     3.250|G     -   |      -   |    0.340|   8.0|28.790|H   38.315|H   38.315|    47.840
   FLOOR PREPARATION WORKER |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, EIGHTH 6 MONTHS |02/22/2004|06/30/2004* |A   21.430|     6.150|     4.290|G     -   |      -   |    0.340|   8.0|32.210|H   42.925|H   42.925|    53.640
   FLOOR COVERING HANDLER   |02/22/2004|06/30/2004* |A   13.620|     6.150|     2.020|G     -   |      -   |    0.340|   8.0|22.130|H   28.940|H   28.940|    35.750
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIRST 3 MONTHS  |02/22/2004|06/30/2004* |A   10.890|     6.150|     1.620|G     -   |      -   |    0.340|   8.0|19.000|H   24.445|H   24.445|    29.890
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SECOND 3 MONTHS |02/22/2004|06/30/2004* |A   12.260|     6.150|     1.820|G     -   |      -   |    0.340|   8.0|20.570|H   26.700|H   26.700|    32.830
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2002|11/30/2002* |    24.320|     2.200|I    2.600|      -   |     0.600|      -  |   8.0|30.450|    42.975|    42.975|    55.500
   COMM & SYSTEM TECH.      |02/22/2002|11/30/2002* |    27.690|     2.200|I    2.600|      -   |     0.600|      -  |   8.0|33.920|    48.180|    48.180|    62.440
   INSIDE WIREMAN,          |08/22/2003|05/31/2004* |    37.000|     8.350|I    7.800|B     -   |     0.500|      -  |   8.0|54.760|    92.870|    92.870|    92.870
   CABLE SPLICER            |08/22/2003|05/31/2004* |    41.630|     8.350|I    7.800|B     -   |     0.500|      -  |   8.0|59.530|   102.410|   102.410|   102.410
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-010) J          |02/22/2004|02/28/2005* |    34.120|     7.850|K    4.250|L    3.100|     0.590|    0.160|   8.0|50.070|    67.130|    67.130|    84.190
   INSTRUMENTMAN            |          |            |          |          |          |          |          |         |      |      |          |          |
   (018.167-034) J          |02/22/2004|02/28/2005* |    31.030|     7.850|K    4.250|L    3.100|     0.590|    0.160|   8.0|46.980|    62.495|    62.495|    78.010
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |         |      |      |          |          |
   (869.567-010) J          |02/22/2004|02/28/2005* |    28.150|     7.850|K    4.250|L    3.100|     0.590|    0.160|   8.0|44.100|    58.175|    58.175|    72.250
# GLAZIER                   |08/22/2003|06/30/2004**|A   32.730|     5.030|     6.010|      -   |     0.400|      -  |   8.0|44.170|M   60.535|    76.900|    76.900
# MARBLE FINISHER           |08/22/2003|07/31/2004* |A   22.770|     4.420|     2.750|     2.850|     0.250|      -  |   8.0|33.040|N   44.425|    55.810|    55.810
# MARBLE SETTER O           |02/22/2004|07/31/2004**|A   32.290|     4.850|     7.660|     4.000|     0.450|    0.010|   8.0|49.260|P   64.660|    80.060|    80.060
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   BRUSH AND SPRAY          |08/22/2003|06/30/2004**|Q   28.610|     5.340|K    6.820|G     -   |     0.250|      -  |C  8.0|41.020|    55.325|    55.325|    69.630
   INDUSTRIAL PAINTER       |08/22/2003|06/30/2004**|Q   28.860|     5.340|K    6.820|G     -   |     0.250|      -  |C  8.0|41.270|    55.700|    55.700|    70.130
   SANDBLASTER, STEAM       |          |            |          |          |          |          |          |         |      |      |          |          |
   CLEANER, WATERBLASTER    |08/22/2003|06/30/2004**|Q   29.110|     5.340|K    6.820|G     -   |     0.250|      -  |C  8.0|41.520|    56.075|    56.075|    70.630
   EXOTIC MATERIALS         |08/22/2003|06/30/2004**|Q   29.360|     5.340|K    6.820|G     -   |     0.250|      -  |C  8.0|41.770|    56.450|    56.450|    71.130
   PAPERHANGER/WALLCOVERING |08/22/2003|06/30/2004**|Q   29.610|     5.340|K    6.820|G     -   |     0.250|      -  |C  8.0|42.020|    56.825|    56.825|    71.630
   TAPER                    |08/22/2003|07/31/2004**|A   31.220|     5.340|     7.180|     2.500|     0.250|      -  |   8.0|46.490|    62.100|C   62.100|    77.710
   TAPER CLEAN-UP           |08/22/2003|07/31/2004* |A   14.320|     5.340|      -   |      -   |      -   |      -  |   8.0|19.660|    26.820|C   26.820|    33.980
# PLASTERER                 |08/22/2003|06/30/2004**|R   30.860|     6.500|     6.800|B     -   |     0.500|      -  |C  8.0|44.660|S   60.090|S   60.090|    75.520
  PLASTER TENDER            |08/22/2000|06/30/2001* |Q   24.250|     3.460|     6.550|B     -   |     0.150|      -  |   8.0|34.410|S   46.535|S   46.535|    58.660
   GUN MAN                  |08/22/2000|06/30/2001* |Q   25.000|     3.460|     6.550|B     -   |     0.150|      -  |   8.0|35.160|S   47.660|S   47.660|    60.160
   TRAINEE (FIRST 7 MONTHS) |08/22/2000|06/30/2001* |Q   12.125|     3.460|     6.550|B     -   |     0.150|      -  |   8.0|22.285|S   28.350|S   28.350|    34.410
   TRAINEE (8TH MONTH TO    |          |            |          |          |          |          |          |         |      |      |          |          |
   13TH MONTH)              |08/22/2000|06/30/2001* |Q   15.760|     3.460|     6.550|B     -   |     0.150|      -  |   8.0|25.920|S   33.800|S   33.800|    41.680
   TRAINEE (14TH MONTH TO   |          |            |          |          |          |          |          |         |      |      |          |          |
   19TH MONTH)              |08/22/2000|06/30/2001* |Q   18.190|     3.460|     6.550|B     -   |     0.150|      -  |   8.0|28.350|S   37.445|S   37.445|    46.540
   TRAINEE (20TH MONTH TO   |          |            |          |          |          |          |          |         |      |      |          |          |
   24TH MONTH)              |08/22/2000|06/30/2001* |Q   20.610|     3.460|     6.550|B     -   |     0.150|      -  |   8.0|30.770|S   41.075|S   41.075|    51.380
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, PIPEFITTER,     |          |            |          |          |          |          |          |         |      |      |          |          |
   STEAMFITTER              |08/22/2003|06/30/2004**|A   36.510|    10.150|T    6.540|      -   |     0.900|    1.750|   8.0|52.350|D   70.605|D   70.605|    88.860
   SERVICE & REPAIR (HVAC)  |08/22/2003|06/30/2004**|A   36.510|    10.150|T    6.540|      -   |     0.900|    1.750|   8.0|52.350|    70.605|    70.605|U   88.860
   UNDERGROUND              |          |            |          |          |          |          |          |         |      |      |          |          |
   UTILITY/LANDSCAPE        |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |08/22/2003|06/30/2004**|    22.600|     2.850|     2.150|     1.550|     0.250|      -  |C  8.0|29.400|    40.700|    40.700|V   52.000
   UNDERGROUND              |          |            |          |          |          |          |          |         |      |      |          |          |
   UTILITY/LANDSCAPE        |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN W   |08/22/2003|06/30/2004**|    12.600|     2.850|     2.150|     1.550|     0.250|      -  |C  8.0|19.400|    25.700|    25.700|V   32.000
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN W              |08/22/2003|06/30/2004**|     8.600|     2.850|     2.150|     1.550|     0.250|      -  |C  8.0|15.400|    19.700|    19.700|V   24.000
   LANDSCAPE TRADESMAN I X  |08/22/2003|06/30/2004**|     8.600|     2.850|      -   |     1.550|     0.250|      -  |C  8.0|13.250|    17.550|    17.550|V   21.850
   LANDSCAPE TRADESMAN II X |08/22/2003|06/30/2004**|     8.600|     2.850|     2.150|     1.550|     0.250|      -  |C  8.0|15.400|    19.700|    19.700|V   24.000
   SPRINKLER FITTER (FIRE   |          |            |          |          |          |          |          |         |      |      |          |          |
   PROTECTION AND FIRE      |          |            |          |          |          |          |          |         |      |      |          |          |
   CONTROL SYSTEMS)         |02/22/2004|03/31/2004**|A   37.840|     4.900|     8.550|B     -   |     0.550|    0.070|   8.0|51.910|    70.830|    70.830|    89.750
# ROOFER                    |08/22/2003|07/31/2004**|    24.350|     5.350|     3.000|     3.050|     0.200|      -  |C  8.0|35.950|    48.125|    48.125|    60.300
   BITUMASTIC, ENAMELER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPE WRAPPER, COAL TAR   |          |            |          |          |          |          |          |         |      |      |          |          |
   PITCH BUILD-UP           |08/22/2003|07/31/2004**|    26.350|     5.350|     3.000|     3.050|     0.200|      -  |C  8.0|37.950|    51.125|    51.125|    64.300
   MASTIC WORKER, KETTLEMAN |08/22/2003|07/31/2004**|    24.600|     5.350|     3.000|     3.050|     0.200|      -  |C  8.0|36.200|    48.500|    48.500|    60.800
# SHEET METAL WORKER (HVAC) |02/22/2004|06/30/2004**|Q   36.850|     7.020|     9.580|B     -   |     0.800|    1.020|   8.0|55.270|Y   73.695|Y   73.695|    92.120
   METAL DECK & SIDING      |02/22/2004|06/30/2004* |Q   29.920|     7.000|     7.730|B     -   |     0.270|    0.370|   8.0|45.290|Y   60.250|Y   60.250|    75.210
# SHEET METAL WORKER (HVAC):|          |            |          |          |          |          |          |         |      |      |          |          |
   TOTAL HVAC CONTRACT OF   |          |            |          |          |          |          |          |         |      |      |          |          |
   $270,000 OR LESS         |02/22/2004|06/30/2004**|Q   31.160|     7.020|     9.410|B     -   |     0.800|    1.020|   8.0|49.410|Y   64.990|Y   64.990|    80.570
   SERVICE TECHNICIAN       |02/22/2004|06/30/2004**|Q   21.430|     5.610|     5.010|B     -   |     0.800|    1.020|   8.0|33.870|S   44.585|S   44.585|    55.300
   SERVICE TECHNICIAN,      |          |            |          |          |          |          |          |         |      |      |          |          |
   ADDITIONAL 6 MONTHS      |02/22/2004|06/30/2004**|Q   22.990|     5.610|     4.740|B     -   |     0.800|    1.020|   8.0|35.160|S   46.655|S   46.655|    58.150
   SERVICE TECHNICIAN,      |          |            |          |          |          |          |          |         |      |      |          |          |
   ADDITIONAL 12 MONTHS     |02/22/2004|06/30/2004**|Q   24.730|     5.610|     4.790|B     -   |     0.800|    1.020|   8.0|36.950|S   49.315|S   49.315|    61.680
   KEY SERVICE EMPLOYEE     |02/22/2004|06/30/2004**|Q   25.280|     5.610|     6.900|B     -   |     0.800|    1.020|   8.0|39.610|S   52.250|S   52.250|    64.890
   SERVICE TECHNICIAN IN    |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINING, FIRST 6 MONTHS |02/22/2004|06/30/2004* |Q   13.160|     5.610|     0.610|B     -   |     0.800|    1.020|   8.0|21.200|S   27.780|S   27.780|    34.360
   SERVICE TECHNICIAN IN    |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINING, SECOND 6 MONTHS|02/22/2004|06/30/2004* |Q   16.350|     5.610|     1.000|B     -   |     0.800|    1.020|   8.0|24.780|S   32.955|S   32.955|    41.130
   SERVICE TECHNICIAN IN    |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINING, THIRD 6 MONTHS |02/22/2004|06/30/2004* |Q   18.230|     5.610|     1.000|B     -   |     0.800|    1.020|   8.0|26.660|S   35.775|S   35.775|    44.890
   SERVICE TECHNICIAN IN    |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINING, FOURTH 6 MONTHS|02/22/2004|06/30/2004* |Q   20.670|     5.610|     1.000|B     -   |     0.800|    1.020|   8.0|29.100|S   39.435|S   39.435|    49.770
   AIR CONDITIONING         |          |            |          |          |          |          |          |         |      |      |          |          |
   SPECIALIST               |02/22/2004|06/30/2004**|Q   18.860|     5.610|     2.630|B     -   |     0.750|    1.020|   8.0|28.870|Y   38.300|Y   38.300|    47.730
   AIR CONDITIONING         |          |            |          |          |          |          |          |         |      |      |          |          |
   SPECIALIST IN TRAINING,  |          |            |          |          |          |          |          |         |      |      |          |          |
   FIRST 6 MONTHS           |02/22/2004|06/30/2004* |A   10.600|     5.610|     0.610|B     -   |     0.750|    1.020|   8.0|18.590|Y   23.890|Y   23.890|    29.190
   AIR CONDITIONING         |          |            |          |          |          |          |          |         |      |      |          |          |
   SPECIALIST IN TRAINING,  |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND 6 MONTHS          |02/22/2004|06/30/2004* |Q   12.920|     5.610|     1.100|B     -   |     0.750|    1.020|   8.0|21.400|Y   27.860|Y   27.860|    34.320
   AIR CONDITIONING         |          |            |          |          |          |          |          |         |      |      |          |          |
   SPECIALIST IN TRAINING,  |          |            |          |          |          |          |          |         |      |      |          |          |
   THIRD 6 MONTHS           |02/22/2004|06/30/2004* |Q   14.280|     5.610|     1.100|B     -   |     0.750|    1.020|   8.0|22.760|Y   29.900|Y   29.900|    37.040
   AIR CONDITIONING         |          |            |          |          |          |          |          |         |      |      |          |          |
   SPECIALIST IN TRAINING,  |          |            |          |          |          |          |          |         |      |      |          |          |
   FOURTH 6 MONTHS          |02/22/2004|06/30/2004* |Q   15.770|     5.610|     1.100|B     -   |     0.750|    1.020|   8.0|24.250|Y   32.135|Y   32.135|    40.020
# TERRAZZO WORKER           |02/22/2004|06/30/2004**|Z   34.950|     4.850|     6.650|B     -   |     0.100|    0.100|   7.0|46.650|S   61.765|S   61.765|    76.880
   TERRAZZO FINISHER        |02/22/2004|06/30/2004**|Z   24.870|     4.600|     3.050|B     -   |     0.050|    0.200|   7.0|32.770|S   44.130|S   44.130|    55.490
# TILE FINISHER             |02/22/2004|03/31/2004* |A   17.910|AA   4.150|AA   2.870|     0.700|AA   0.250|    0.100|   8.0|25.980|    27.565|C   27.565|    36.520
   RED CIRCLED FINISHER     |02/22/2004|03/31/2004* |A   23.670|AA   4.150|AA   3.100|     1.300|AA   0.250|    0.100|   8.0|32.570|    36.810|C   36.810|    48.640
# TILE SETTER               |02/22/2004|03/31/2004* |A   32.480|AA   4.150|AA   4.100|     2.350|AA   0.250|    0.100|   8.0|43.430|    51.070|C   51.070|    67.310
  WATER WELL DRILLER        |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AB   0.630|      -   |      -  |   8.0|17.310|AC  23.660|AC  23.660|AC  23.660
   PUMP INSTALLER           |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AB   0.630|      -   |      -  |   8.0|17.310|AC  23.660|AC  23.660|AC  23.660
   HELPER                   |08/22/1998|12/31/1998* |    10.380|     3.200|     0.780|AD   0.520|      -   |      -  |   8.0|14.880|AC  20.070|AC  20.070|AC  20.070
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
E  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
F  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 9 HOURS ON SATURDAY ONLY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
G  INCLUDED IN BASIC HOURLY RATE.
H  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
I  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
J  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
K  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
L  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
M  RATE APPLIES TO THE FIRST 2 OVERTIME HOURS; ALL OTHER TIME IS PAID AT THE SATURDAY OVERTIME HOURLY RATE.
N  RATE ONLY APPLIES TO THE FIRST DAILY OVERTIME HOUR WORKED, MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME HOURS ARE PAID AT THE SATURDAY, SUNDAY, AND
   HOLIDAY OVERTIME RATE.
O  EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $10.00 PER DAY ABOVE THE WAGE RATE.
P  RATE APPLIES TO FIRST OVERTIME HOUR ONLY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
Q  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
R  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF. EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $4.00 PER DAY ABOVE THE
   WAGE RATE. EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $7.50 PER DAY ABOVE THE WAGE RATE.
S  RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
T  INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME RATE.
U  RATE APPLIES TO WORK PERFORMED ON THE FOLLOWING HOLIDAYS ONLY:  NEW YEAR'S DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY.  WORK PERFORMED ON
   SUNDAYS AND THE REMAINDER OF HOLIDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
V  RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
W  THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
X  THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT
   PERIOD, MAY BE PERFORMED BY LANDSCAPE IRRIGATION TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN.
Y  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
Z  INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AA NOT INCLUDED IN THE OVERTIME HOURLY RATE.
AB RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
AC RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY
   ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
AD RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.