GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SANTA BARBARA COUNTY

DETERMINATION: STB-2004-1

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER, |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND SHIFT             |02/22/2004|11/30/2004* |    26.020|     4.100|A    2.450|      -   |     0.600|B   0.210|   8.0|34.160|    47.560|C   47.560|D   60.960
   COMM & SYSTEM INSTALLER, |          |            |          |          |          |          |          |         |      |      |          |          |
   THIRD SHIFT              |02/22/2004|11/30/2004* |    29.140|     4.100|A    2.450|      -   |     0.600|B   0.210|   8.0|37.370|    52.375|C   52.375|D   67.380
   COMM & SYSTEM TECH.,     |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND SHIFT             |02/22/2004|11/30/2004* |    28.130|     4.100|A    2.450|      -   |     0.600|B   0.210|   8.0|36.330|    50.815|C   50.815|D   65.300
   COMM & SYSTEM TECH.,     |          |            |          |          |          |          |          |         |      |      |          |          |
   THIRD SHIFT              |02/22/2004|11/30/2004* |    31.510|     4.100|A    2.450|      -   |     0.600|B   0.210|   8.0|39.815|    56.040|C   56.040|D   72.270
   INSIDE WIREMAN, 2ND SHIFT|02/22/2004|05/31/2004**|E   34.115|     6.600|A    4.000|      -   |     0.650|B   0.355|F  7.5|46.745|G   64.315|G   64.315|D   81.885
   INSIDE WIREMAN, 3RD SHIFT|02/22/2004|05/31/2004**|E   35.665|     6.600|A    4.000|      -   |     0.650|B   0.365|H  7.0|48.350|G   66.720|G   66.720|D   85.085
   CABLE SPLICER, 2ND SHIFT |02/22/2004|05/31/2004**|E   36.315|     6.600|A    4.000|      -   |     0.650|B   0.375|F  7.5|49.025|G   67.725|G   67.725|D   86.425
   CABLE SPLICER, 3RD SHIFT |02/22/2004|05/31/2004**|E   37.965|     6.600|A    4.000|      -   |     0.650|B   0.385|H  7.0|50.735|G   70.285|G   70.285|D   89.835
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, INDUSTRIAL AND  |          |            |          |          |          |          |          |         |      |      |          |          |
   GENERAL PIPEFITTER (2ND  |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT)                   |08/22/2003|06/30/2004**|I   34.520|     4.270|J    6.060|K     -   |     0.470|      -  |   8.0|45.320|L   62.310|L   62.310|    77.810
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPELAYER (2ND SHIFT)    |08/22/2003|06/30/2004**|I   23.250|     4.270|J    5.820|K     -   |     0.360|      -  |   8.0|33.700|    45.055|M   45.055|    55.370
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPE TRADESMAN (2ND      |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT) N                 |08/22/2003|06/30/2004**|I   13.430|     4.270|     0.250|      -   |     0.080|      -  |   8.0|18.030|    24.475|M   24.475|    30.920
   SERVICE & REPAIR         |          |            |          |          |          |          |          |         |      |      |          |          |
   (PLUMBER/HVAC-FITTER)    |          |            |          |          |          |          |          |         |      |      |          |          |
   (2ND SHIFT)              |08/22/2003|06/30/2004**|I   33.390|     4.270|J    5.820|K     -   |     0.140|      -  |   8.0|43.620|    60.045|O   60.045|    74.980
   LANDSCAPE/IRRIGATION     |          |            |          |          |          |          |          |         |      |      |          |          |
   FITTER SECOND SHIFT      |08/22/2003|06/30/2004**|P   26.800|     4.270|J    5.590|K     -   |     0.350|      -  |M  7.0|37.010|    50.410|    50.410|    62.615
   LANDSCAPE/IRRIGATION     |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN     |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND SHIFT Q           |08/22/2003|06/30/2004**|P   25.370|     4.270|J    4.140|K     -   |     0.350|      -  |M  7.0|34.130|    46.815|    46.815|    58.430
   LANDSCAPE/IRRIGATION     |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN SECOND SHIFT R |08/22/2003|06/30/2004**|S   12.160|     2.000|J    0.750|      -   |     0.050|      -  |M  7.0|14.960|    21.040|    21.040|    27.120
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
B  INCLUDES AN AMOUNT FOR THE NATIONAL LABOR-MANAGEMENT COOPERATION FUND AND THE ADMINISTRATIVE MAINTENANCE FUND.
C  DISREGARD THIS RATE. FOR THE FIRST EIGHT HOURS OF WORK PERFORMED ON SATURDAY, USE THE SATURDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS
   PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
D  DISREGARD THIS RATE. FOR ALL HOURS IN EXCESS OF THE FIRST EIGHT HOURS OF WORK PERFORMED ON SATURDAY, USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL
   RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
E  INCLUDES AN AMOUNT FOR WORKING DUES (6.75%).  $0.045 IS DEDUCTED FOR THE LMCC.
F  8 HOURS PAY FOR 7.5 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE
G  RATE APPLIES TO THE FIRST 2 DAILY AND THE FIRST 8 SATURDAY OVERTIME HOURS WORKED.  ALL OTHER OVERTIME IS PAID AT THE SUNDAY RATE.
H  8 HOURS PAY FOR 7 HOURS WORKED AT THE STRAIGHT TIME BASIC HOURLY RATE.
I  INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
J  INCLUDES AMOUNT FOR NATIONAL PENSION AND RETIREE'S X-MAS FUND.
K  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
L  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
M  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
N  PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT  A JOURNEYMAN.
O  SATURDAY MAY BE WORKED AT STRAIGHT-TIME RATE, PROVIDED THAT THE HOURS DO NOT EXCEED 8 HOURS PER DAY OR 40 HOURS PER WEEK.
P  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
Q  THE LANDSCAPE/IRRIGATION ASSISTANT JOURNEYMAN MAY BE UTILIZED ONLY AS THE FIFTH WORKER ON THE JOB.  ADDITIONAL LANDSCAPE/IRRIGATION ASSISTANT
   JOURNEYMEN MAY BE ADDED AS THE 10TH WORKER, 15TH WORKER, 20TH WORKER AND SO ON.
R  TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR
   APPRENTICE LANDSCAPE/IRRIGATION FITTER.  THE 3RD AND 4TH WORKER MAY BE A TRADESMAN.
S  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF AND ADMINISTRATIVE DUES.