GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN DIEGO COUNTY

DETERMINATION: SDI-2004-1

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# CARPET LAYER:             |          |            |          |          |          |          |          |         |      |      |          |          |
   RESILIENT TILE LAYER     |          |            |          |          |          |          |          |         |      |      |          |          |
   (2ND SHIFT)              |08/22/2003|06/30/2004* |A   23.370|     2.600|     2.350|     1.500|     0.200|      -  |   8.0|30.020|B   41.705|C   41.705|    53.390
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |         |      |      |          |          |
   TECHNICIAN SECOND SHIFT  |02/22/2004|05/31/2004**|    34.020|     4.480|D    4.350|      -   |     0.550|    0.170|   8.0|44.590|E   62.110|E   62.110|F   79.630
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |         |      |      |          |          |
   TECHNICIAN THIRD SHIFT   |02/22/2004|05/31/2004**|    38.110|     4.480|D    4.350|      -   |     0.550|    0.170|   8.0|48.800|E   68.425|E   68.425|F   88.050
   CABLE SPLICER SECOND     |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT                    |02/22/2004|05/31/2004**|    34.900|     4.480|D    4.350|      -   |     0.550|    0.170|   8.0|45.500|E   63.475|E   63.475|F   81.450
   CABLE SPLICER THIRD SHIFT|02/22/2004|05/31/2004**|    39.090|     4.480|D    4.350|      -   |     0.550|    0.170|   8.0|49.810|E   69.940|E   69.940|F   90.070
   TUNNEL WIREMAN SECOND    |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT                    |02/22/2004|05/31/2004**|    38.270|     4.480|D    4.350|      -   |     0.550|    0.170|   8.0|48.970|E   68.680|E   68.680|F   88.390
   TUNNEL WIREMAN THIRD     |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT                    |02/22/2004|05/31/2004**|    42.870|     4.480|D    4.350|      -   |     0.550|    0.170|   8.0|53.710|E   75.790|E   75.790|F   97.870
   TUNNEL CABLE SPLICER     |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND SHIFT             |02/22/2004|05/31/2004**|    39.260|     4.480|D    4.350|      -   |     0.550|    0.170|   8.0|49.990|E   70.210|E   70.210|F   90.430
   TUNNEL CABLE SPLICER     |          |            |          |          |          |          |          |         |      |      |          |          |
   THIRD SHIFT              |02/22/2004|05/31/2004**|    43.980|     4.480|D    4.350|      -   |     0.550|    0.170|   8.0|54.850|E   77.500|E   77.500|F  100.150
   TECH GRADE 1 (2ND SHIFT) |          |            |          |          |          |          |          |         |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    21.290|     2.470|H    1.890|      -   |     0.050|      -  |   8.0|25.700|    36.620|I   36.345|I   46.990
   TECH GRADE 1 (3RD SHIFT) |          |            |          |          |          |          |          |         |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    23.850|     2.470|H    1.890|      -   |     0.050|      -  |   8.0|28.260|    40.460|I   40.185|I   52.110
   TECH GRADE 2 (2ND SHIFT) |          |            |          |          |          |          |          |         |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    19.350|     2.470|H    1.845|      -   |     0.050|      -  |   8.0|23.715|    33.640|I   33.390|I   43.065
   TECH GRADE 2 (3RD SHIFT) |02/22/2003|09/30/2003* |    21.680|     2.470|H    1.845|      -   |     0.050|      -  |   8.0|26.045|    37.130|I   36.885|I   47.725
   TECH GRADE 3 (2ND SHIFT) |          |            |          |          |          |          |          |         |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    15.540|     2.470|H    0.400|      -   |     0.050|      -  |   8.0|18.460|    26.430|I   26.230|I   34.000
   TECH GRADE 3 (3RD SHIFT) |          |            |          |          |          |          |          |         |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    17.410|     2.470|H    0.400|      -   |     0.050|      -  |   8.0|20.330|    29.230|I   29.035|I   37.740
   TECH GRADE 4 (2ND SHIFT) |          |            |          |          |          |          |          |         |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    13.490|     2.470|H    0.345|      -   |     0.050|      -  |   8.0|16.355|    23.275|I   23.100|I   29.845
   TECH GRADE 4 (3RD SHIFT) |          |            |          |          |          |          |          |         |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    15.110|     2.470|H    0.345|      -   |     0.050|      -  |   8.0|17.975|    25.700|I   25.530|I   33.085
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, INDUSTRIAL AND  |          |            |          |          |          |          |          |         |      |      |          |          |
   GENERAL PIPEFITTER (2ND  |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT)                   |08/22/2003|06/30/2004**|J   34.520|     4.270|K    6.060|L     -   |     0.470|      -  |   8.0|45.320|M   62.310|M   62.310|    77.810
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPELAYER (2ND SHIFT)    |08/22/2003|06/30/2004**|J   23.250|     4.270|K    5.820|L     -   |     0.360|      -  |   8.0|33.700|    45.055|N   45.055|    55.370
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPE TRADESMAN (2ND      |          |            |          |          |          |          |          |         |      |      |          |          |
   SHIFT) O                 |08/22/2003|06/30/2004**|J   13.430|     4.270|     0.250|      -   |     0.080|      -  |   8.0|18.030|    24.475|N   24.475|    30.920
   SERVICE & REPAIR         |          |            |          |          |          |          |          |         |      |      |          |          |
   (PLUMBER/HVAC-FITTER)    |          |            |          |          |          |          |          |         |      |      |          |          |
   (2ND SHIFT)              |08/22/2003|06/30/2004**|J   33.390|     4.270|K    5.820|L     -   |     0.140|      -  |   8.0|43.620|    60.045|P   60.045|    74.980
   LANDSCAPE/IRRIGATION     |          |            |          |          |          |          |          |         |      |      |          |          |
   FITTER SECOND SHIFT      |08/22/2003|06/30/2004**|Q   26.800|     4.270|K    5.590|L     -   |     0.350|      -  |N  7.0|37.010|    50.410|    50.410|    62.615
   LANDSCAPE/IRRIGATION     |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN     |          |            |          |          |          |          |          |         |      |      |          |          |
   SECOND SHIFT R           |08/22/2003|06/30/2004**|Q   25.370|     4.270|K    4.140|L     -   |     0.350|      -  |N  7.0|34.130|    46.815|    46.815|    58.430
   LANDSCAPE/IRRIGATION     |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN SECOND SHIFT S |08/22/2003|06/30/2004**|T   12.160|     2.000|K    0.750|      -   |     0.050|      -  |N  7.0|14.960|    21.040|    21.040|    27.120
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
B  RATE APPLIES TO THE FIRST 4 OVERTIME HOURS.
C  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
D  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
E  RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
F  DISREGARD THIS RATE. FOR ALL HOURS IN EXCESS OF THE FIRST EIGHT HOURS OF WORK PERFORMED ON SATURDAY, USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL
   RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING WAGE DETERMINATIONS.
G  THE FIRST WORKER ON THE SITE MUST BE A JOURNEYMAN TECHNICIAN GRADE #1 OR #2; THEREAFTER THE CONTRACTOR MAY EMPLOY FIVE (5) JOURNEYMAN TECHNICIAN OF
   ANY GRADE.
H  INCLUDES AN AMOUNT FOR THE NATIONAL EMPLOYEES BENEFIT FUND WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR.
I  THESE RATES ARE NOT APPLICABLE FOR SATURDAYS, SUNDAYS, AND HOLIDAYS. FOR THOSE DAYS, PLEASE REFER TO NON-SHIFT RATES.
J  INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
K  INCLUDES AMOUNT FOR NATIONAL PENSION AND RETIREE'S X-MAS FUND.
L  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
M  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
N  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
O  PIPE TRADESMEN SHALL NOT BE PERMITTED ON ANY JOB WITHOUT  A JOURNEYMAN.
P  SATURDAY MAY BE WORKED AT STRAIGHT-TIME RATE, PROVIDED THAT THE HOURS DO NOT EXCEED 8 HOURS PER DAY OR 40 HOURS PER WEEK.
Q  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
R  THE LANDSCAPE/IRRIGATION ASSISTANT JOURNEYMAN MAY BE UTILIZED ONLY AS THE FIFTH WORKER ON THE JOB.  ADDITIONAL LANDSCAPE/IRRIGATION ASSISTANT
   JOURNEYMEN MAY BE ADDED AS THE 10TH WORKER, 15TH WORKER, 20TH WORKER AND SO ON.
S  TRADESMEN SHALL ONLY BE USED IF THE FIRST WORKER ON THE JOB IS A LANDSCAPE/IRRIGATION FITTER, SECOND WORKER MUST BE A LANDSCAPE/IRRIGATION FITTER OR
   APPRENTICE LANDSCAPE/IRRIGATION FITTER.  THE 3RD AND 4TH WORKER MAY BE A TRADESMAN.
T  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF AND ADMINISTRATIVE DUES.