GENERAL PREVAILING WAGE DETERMINATION FOR SHIFT DIFFERENTIAL PAY MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: IMPERIAL COUNTY

DETERMINATION: IMP-2003-1

____________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|       OVERTIME HOURLY RATE       
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION | TRAINING |      | TOTAL|          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     |  AND/OR  | HOURS|HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |   RATE   |  WELFARE |          |  HOLIDAY |   OTHER  |      | RATE |          |          |   HOLIDAY  
____________________________________________________________________________________________________________________________________________________________
# CARPET LAYER:             |          |            |          |          |          |          |          |      |      |          |          |
   RESILIENT TILE LAYER     |          |            |          |          |          |          |          |      |      |          |          |
   (2ND SHIFT)              |02/22/2003|06/30/2003**|A   22.220|     2.600|     2.350|     1.500|     0.200|   8.0|28.870|B   39.980|C   39.980|    51.090
# ELECTRICIAN:              |          |            |          |          |          |          |          |      |      |          |          |
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |      |      |          |          |
   TECHNICIAN SECOND SHIFT  |02/22/2003|05/31/2003* |    34.020|     2.880|D    4.350|      -   |     0.550|   8.0|42.820|E   60.340|E   60.340|F   77.860
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |      |      |          |          |
   TECHNICIAN THIRD SHIFT   |02/22/2003|05/31/2003* |    38.110|     2.880|D    4.350|      -   |     0.550|   8.0|47.030|E   66.655|E   66.655|F   86.280
   CABLE SPLICER SECOND     |          |            |          |          |          |          |          |      |      |          |          |
   SHIFT                    |02/22/2003|05/31/2003* |    34.900|     2.880|D    4.350|      -   |     0.550|   8.0|43.730|E   61.705|E   61.705|F   79.680
   CABLE SPLICER THIRD SHIFT|02/22/2003|05/31/2003* |    39.090|     2.880|D    4.350|      -   |     0.550|   8.0|48.040|E   68.170|E   68.170|F   88.300
   TUNNEL WIREMAN SECOND    |          |            |          |          |          |          |          |      |      |          |          |
   SHIFT                    |02/22/2003|05/31/2003* |    38.270|     2.880|D    4.350|      -   |     0.550|   8.0|47.200|E   66.910|E   66.910|F   86.620
   TUNNEL WIREMAN THIRD     |          |            |          |          |          |          |          |      |      |          |          |
   SHIFT                    |02/22/2003|05/31/2003* |    42.870|     2.880|D    4.350|      -   |     0.550|   8.0|51.940|E   74.020|E   74.020|F   96.100
   TUNNEL CABLE SPLICER     |          |            |          |          |          |          |          |      |      |          |          |
   SECOND SHIFT             |02/22/2003|05/31/2003* |    39.260|     2.880|D    4.350|      -   |     0.550|   8.0|48.220|E   68.440|E   68.440|F   88.660
   TUNNEL CABLE SPLICER     |          |            |          |          |          |          |          |      |      |          |          |
   THIRD SHIFT              |02/22/2003|05/31/2003* |    43.980|     2.880|D    4.350|      -   |     0.550|   8.0|53.080|E   75.730|E   75.730|F   98.380
   INSIDE WIREMAN, TECH.    |          |            |          |          |          |          |          |      |      |          |          |
   FOR ELECTRICAL PROJECTS  |          |            |          |          |          |          |          |      |      |          |          |
   OF MORE THAN $500,000    |          |            |          |          |          |          |          |      |      |          |          |
   SECOND SHIFT             |02/22/2003|05/31/2003* |    37.540|     2.880|D    4.350|      -   |     0.550|   8.0|46.450|E   65.785|E   65.785|F   85.120
   INSIDE WIREMAN, TECH.    |          |            |          |          |          |          |          |      |      |          |          |
   FOR ELECTRICAL PROJECTS  |          |            |          |          |          |          |          |      |      |          |          |
   OF MORE THAN $500,000    |          |            |          |          |          |          |          |      |      |          |          |
   THIRD SHIFT              |02/22/2003|05/31/2003* |    42.050|     2.880|D    4.350|      -   |     0.550|   8.0|51.090|E   72.745|E   72.745|F   94.400
   CABLE SPLICER FOR        |          |            |          |          |          |          |          |      |      |          |          |
   ELECTRICAL PROJECTS OF   |          |            |          |          |          |          |          |      |      |          |          |
   MORE THAN $500,000       |          |            |          |          |          |          |          |      |      |          |          |
   SECOND SHIFT             |02/22/2003|05/31/2003* |    38.420|     2.880|D    4.350|      -   |     0.550|   8.0|47.350|E   67.135|E   67.135|F   86.920
   CABLE SPLICER FOR        |          |            |          |          |          |          |          |      |      |          |          |
   ELECTRICAL PROJECTS OF   |          |            |          |          |          |          |          |      |      |          |          |
   MORE THAN $500,000 THIRD |          |            |          |          |          |          |          |      |      |          |          |
   SHIFT                    |02/22/2003|05/31/2003* |    43.030|     2.880|D    4.350|      -   |     0.550|   8.0|52.100|E   74.260|E   74.260|F   96.420
   TUNNEL WIREMAN FOR       |          |            |          |          |          |          |          |      |      |          |          |
   ELECTRICAL PROJECTS OF   |          |            |          |          |          |          |          |      |      |          |          |
   MORE THAN $500,000       |          |            |          |          |          |          |          |      |      |          |          |
   SECOND SHIFT             |02/22/2003|05/31/2003* |    42.230|     2.880|D    4.350|      -   |     0.550|   8.0|51.280|E   73.030|E   73.030|F   94.780
   TUNNEL WIREMAN FOR       |          |            |          |          |          |          |          |      |      |          |          |
   ELECTRICAL PROJECTS OF   |          |            |          |          |          |          |          |      |      |          |          |
   MORE THAN $500,000 THIRD |          |            |          |          |          |          |          |      |      |          |          |
   SHIFT                    |02/22/2003|05/31/2003* |    47.300|     2.880|D    4.350|      -   |     0.550|   8.0|56.500|E   80.860|E   80.860|F  105.220
   TUNNEL CABLE SPLICER FOR |          |            |          |          |          |          |          |      |      |          |          |
   ELECTRICAL PROJECTS OF   |          |            |          |          |          |          |          |      |      |          |          |
   MORE THAN $500,000       |          |            |          |          |          |          |          |      |      |          |          |
   SECOND SHIFT             |02/22/2003|05/31/2003* |    43.210|     2.880|D    4.350|      -   |     0.550|   8.0|52.290|E   74.545|E   74.545|F   96.800
   TUNNEL CABLE SPLICER FOR |          |            |          |          |          |          |          |      |      |          |          |
   ELECTRICAL PROJECTS OF   |          |            |          |          |          |          |          |      |      |          |          |
   MORE THAN $500,000 THIRD |          |            |          |          |          |          |          |      |      |          |          |
   SHIFT                    |02/22/2003|05/31/2003* |    48.410|     2.880|D    4.350|      -   |     0.550|   8.0|57.640|E   82.570|E   82.570|F  107.500
   TECH GRADE 1 (2ND SHIFT) |          |            |          |          |          |          |          |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    21.290|     2.470|H    1.890|      -   |     0.050|   8.0|25.700|    36.620|I   36.345|I   46.990
   TECH GRADE 1 (3RD SHIFT) |          |            |          |          |          |          |          |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    23.850|     2.470|H    1.890|      -   |     0.050|   8.0|28.260|    40.460|I   40.185|I   52.110
   TECH GRADE 2 (2ND SHIFT) |          |            |          |          |          |          |          |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    19.350|     2.470|H    1.845|      -   |     0.050|   8.0|23.715|    33.640|I   33.390|I   43.065
   TECH GRADE 2 (3RD SHIFT) |02/22/2003|09/30/2003* |    21.680|     2.470|H    1.845|      -   |     0.050|   8.0|26.045|    37.130|I   36.885|I   47.725
   TECH GRADE 3 (2ND SHIFT) |          |            |          |          |          |          |          |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    15.540|     2.470|H    0.400|      -   |     0.050|   8.0|18.460|    26.430|I   26.230|I   34.000
   TECH GRADE 3 (3RD SHIFT) |          |            |          |          |          |          |          |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    17.410|     2.470|H    0.400|      -   |     0.050|   8.0|20.330|    29.230|I   29.035|I   37.740
   TECH GRADE 4 (2ND SHIFT) |          |            |          |          |          |          |          |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    13.490|     2.470|H    0.345|      -   |     0.050|   8.0|16.355|    23.275|I   23.100|I   29.845
   TECH GRADE 4 (3RD SHIFT) |          |            |          |          |          |          |          |      |      |          |          |
   G                        |02/22/2003|09/30/2003* |    15.110|     2.470|H    0.345|      -   |     0.050|   8.0|17.975|    25.700|I   25.530|I   33.085
# PLUMBER:                  |          |            |          |          |          |          |          |      |      |          |          |
   PLUMBER, INDUSTRIAL AND  |          |            |          |          |          |          |          |      |      |          |          |
   GENERAL PIPEFITTER (2ND  |          |            |          |          |          |          |          |      |      |          |          |
   SHIFT)                   |08/22/2002|06/30/2003**|J   33.830|     4.020|K    5.560|L     -   |     0.430|   8.0|43.840|M   60.485|M   60.485|    75.640
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |      |      |          |          |
   PIPELAYER (2ND SHIFT)    |08/22/2002|06/30/2003* |J   22.980|     4.020|K    5.400|L     -   |     0.330|   8.0|32.730|    43.950|N   43.950|O   54.130
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |      |      |          |          |
   PIPE TRADESMAN (2ND      |          |            |          |          |          |          |          |      |      |          |          |
   SHIFT)                   |08/22/2002|06/30/2003* |J   13.050|     4.020|     0.250|      -   |     0.080|   8.0|17.400|    23.655|N   23.655|    29.910
   SERVICE & REPAIR         |          |            |          |          |          |          |          |      |      |          |          |
   (PLUMBER/HVAC-FITTER)    |          |            |          |          |          |          |          |      |      |          |          |
   (2ND SHIFT)              |08/22/2002|06/30/2003* |J   32.810|     4.020|K    5.320|L     -   |     0.100|   8.0|42.250|    58.385|P   58.385|    73.030
   IRRIGATION AND LAWN      |          |            |          |          |          |          |          |      |      |          |          |
   SPRINKLER FITTER SECOND  |          |            |          |          |          |          |          |      |      |          |          |
   SHIFT                    |08/22/2002|06/30/2003* |Q   26.400|     4.020|K    5.190|L     -   |     0.350|N  7.0|35.960|    49.160|    49.160|    61.170
   LANDSCAPE IRRIGATION     |          |            |          |          |          |          |          |      |      |          |          |
   TRADESMAN SECOND SHIFT   |08/22/2002|06/30/2003* |R   11.700|     2.000|K    0.750|      -   |     0.050|N  7.0|14.500|    20.350|    20.350|    26.200
____________________________________________________________________________________________________________________________________________________________
                       GENERAL PREVAILING WAGE DETERMINATION FOR SHIFT DIFFERENTIAL PAY MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                               PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
B  RATE APPLIES TO THE FIRST 4 OVERTIME HOURS.
C  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
D  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
E  RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
F  DISREGARD THIS RATE. USE THE SUNDAY AND HOLIDAY NON-SHIFT DIFFERENTIAL RATE FOR THIS CLASSIFICATION AS PUBLISHED IN THE DIRECTOR'S GENERAL PREVAILING
   WAGE DETERMINATIONS.
G  THE FIRST WORKER ON THE SITE MUST BE A JOURNEYMAN TECHNICIAN GRADE #1 OR #2; THEREAFTER THE CONTRACTOR MAY EMPLOY FIVE (5) JOURNEYMAN TECHNICIAN OF
   ANY GRADE.
H  INCLUDES AN AMOUNT FOR THE NATIONAL EMPLOYEES BENEFIT FUND WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR.
I  THESE RATES ARE NOT APPLICABLE FOR SATURDAYS, SUNDAYS, AND HOLIDAYS. FOR THOSE DAYS, PLEASE REFER TO NON-SHIFT RATES.
J  INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
K  INCLUDES AMOUNT FOR NATIONAL PENSION AND RETIREE'S X-MAS FUND.
L  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
M  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
N  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
O  THE CORRECT SUNDAY AND HOLIDAY RATE IS $46.18.
P  SATURDAY MAY BE WORKED AT STRAIGHT-TIME RATE, PROVIDED THAT THE HOURS DO NOT EXCEED 8 HOURS PER DAY OR 40 HOURS PER WEEK.
Q  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
R  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF AND ADMINISTRATIVE DUES.