GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: RIVERSIDE COUNTY

DETERMINATION: RIV-2002-2

____________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|       OVERTIME HOURLY RATE       
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION | TRAINING |      | TOTAL|          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     |  AND/OR  | HOURS|HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |   RATE   |  WELFARE |          |  HOLIDAY |   OTHER  |      | RATE |          |          |   HOLIDAY  
____________________________________________________________________________________________________________________________________________________________
# BRICKLAYER, STONEMASON,   |          |            |          |          |          |          |          |      |      |          |          |
   MARBLE MASON, CEMENT     |          |            |          |          |          |          |          |      |      |          |          |
   BLOCKLAYER, POINTER,     |          |            |          |          |          |          |          |      |      |          |          |
   CAULKER, CLEANER         |08/22/2002|04/30/2003**|A   28.220|     3.150|     2.900|B     -   |     0.150|C  8.0|34.420|D   48.530|D   48.530|    62.640
# BRICK TENDER              |08/22/2002|06/30/2003* |    21.100|     3.400|     3.310|A    2.550|     0.310|   8.0|30.670|    41.220|    41.220|    51.770
# BRICK TENDER:             |          |            |          |          |          |          |          |      |      |          |          |
   FORKLIFT OPERATOR        |08/22/2002|06/30/2003* |    21.550|     3.400|     3.310|A    2.550|     0.310|   8.0|31.120|    41.895|    41.895|    52.670
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |      |      |          |          |
   RESILIENT TILE LAYER     |02/22/2002|12/31/2002**|    25.950|     2.430|     1.710|     1.500|     0.610|   8.0|32.200|    45.175|    45.175|    58.150
# DRYWALL FINISHER          |          |            |          |          |          |          |          |      |      |          |          |
   DRYWALL FINISHER         |02/22/2002|09/30/2002**|E   25.330|     2.000|     2.550|     3.070|     0.310|   8.0|33.260|    45.925|C   45.925|    58.590
   DRYWALL FINISHER--FIRST  |          |            |          |          |          |          |          |      |      |          |          |
   YEAR OF EMPLOYMENT       |02/22/2002|09/30/2002**|E   22.570|     2.000|     2.550|     3.070|     0.310|   8.0|30.500|    41.785|C   41.785|    53.070
   SPRAY TEXTURE TENDER     |02/22/2002|09/30/2002* |E    8.500|     2.000|     1.400|      -   |      -   |   8.0|11.900|    16.150|C   16.150|    20.400
   CLEAN UP                 |02/22/2002|09/30/2002**|E    8.000|     1.600|      -   |      -   |      -   |   8.0| 9.600|    13.600|C   13.600|    17.600
# ELECTRICIAN:              |          |            |          |          |          |          |          |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2002|11/30/2002* |    21.530|     2.550|F    2.000|      -   |     0.450|   8.0|27.180|G   38.270|G   38.270|    49.360
   COMM & SYSTEM TECH.      |02/22/2002|11/30/2002* |    23.330|     2.550|F    2.000|      -   |     0.450|   8.0|29.030|G   41.045|G   41.045|    53.060
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |      |      |          |          |
   TECHNICIAN               |08/22/2002|12/01/2002**|H   28.030|     4.060|F    5.200|      -   |     0.600|   8.0|38.730|I   53.165|I   53.165|    67.600
   CABLE SPLICER            |08/22/2002|12/01/2002**|H   29.030|     4.060|F    5.200|      -   |     0.600|   8.0|39.760|I   54.710|I   54.710|    69.660
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |      |      |          |          |
   (018.167-010) J          |02/22/2002|09/30/2002**|A   32.310|     4.300|     3.750|K     -   |     0.700|   8.0|41.060|L   56.715|M   72.370|N  103.680
   INSTRUMENTMAN            |          |            |          |          |          |          |          |      |      |          |          |
   (018.167-034) J          |02/22/2002|09/30/2002**|A   29.960|     4.300|     3.750|K     -   |     0.700|   8.0|38.710|L   53.190|M   67.670|N   96.630
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |      |      |          |          |
   (869.567-010) J          |02/22/2002|09/30/2002**|A   29.380|     4.300|     3.750|K     -   |     0.700|   8.0|38.130|L   52.320|M   66.510|N   94.890
# GLAZIER                   |08/22/2002|05/31/2003* |E   29.200|O    4.050|     4.050|      -   |     0.350|   8.0|37.650|P   52.250|P   52.250|    66.850
  MARBLE FINISHER           |08/22/2002|05/31/2003**|Q   19.900|     1.460|     1.900|      -   |     0.200|C  8.0|23.460|R   33.410|S   33.410|    43.360
# PAINTER:                  |          |            |          |          |          |          |          |      |      |          |          |
   PAINTER, LEAD ABATEMENT  |08/22/2002|06/30/2003* |H   25.020|     2.200|     2.200|     1.040|     0.450|   8.0|30.910|    43.420|    43.420|    43.420
   REPAINT AND LIGHT        |          |            |          |          |          |          |          |      |      |          |          |
   COMMERCIAL PAINTER, LEAD |          |            |          |          |          |          |          |      |      |          |          |
   ABATEMENT                |08/22/2002|06/30/2003* |H   21.750|     2.200|     2.200|     1.040|     0.450|   8.0|27.640|    38.515|    38.515|    38.515
# PLASTERER                 |08/22/2002|08/05/2003**|E   24.770|     3.890|     2.500|     2.090|     0.370|   8.0|33.620|    45.505|T   45.505|    57.390
# PLASTER TENDER U          |08/22/2002|08/05/2003* |    23.000|     3.400|     3.310|V    3.040|     0.420|   8.0|33.170|W   44.670|W   44.670|    56.170
   PLASTER CLEAN-UP LABORER |08/22/2002|08/05/2003* |    20.450|     3.400|     3.310|V    3.040|     0.420|   8.0|30.620|W   40.845|W   40.845|    51.070
# PLUMBER:                  |          |            |          |          |          |          |          |      |      |          |          |
   PLUMBER, INDUSTRIAL AND  |          |            |          |          |          |          |          |      |      |          |          |
   GENERAL PIPEFITTER       |08/22/2002|06/30/2003**|Q   29.810|     4.020|X    5.560|B     -   |     0.430|   8.0|39.820|Y   54.455|Y   54.455|    67.600
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |      |      |          |          |
   PIPELAYER                |08/22/2002|06/30/2003* |Q   20.250|     4.020|X    5.400|B     -   |     0.330|   8.0|30.000|    39.855|C   39.855|    48.670
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |      |      |          |          |
   PIPE TRADESMAN           |08/22/2002|06/30/2003* |Q   11.350|     4.020|     0.250|      -   |     0.080|   8.0|15.700|    21.105|C   21.105|    26.510
   SERVICE & REPAIR         |          |            |          |          |          |          |          |      |      |          |          |
   (PLUMBER/HVAC-FITTER)    |08/22/2002|06/30/2003* |Q   28.920|     4.020|X    5.320|B     -   |     0.100|   8.0|38.360|    52.550|Z   52.550|    65.250
   IRRIGATION AND LAWN      |          |            |          |          |          |          |          |      |      |          |          |
   SPRINKLER FITTER         |08/22/2002|06/30/2003* |AA  23.270|     4.020|X    5.190|B     -   |     0.350|C  8.0|32.830|    44.465|    44.465|    54.905
   LANDSCAPE IRRIGATION     |          |            |          |          |          |          |          |      |      |          |          |
   TRADESMEN AB             |08/22/2002|06/30/2003* |AA  10.170|     2.000|X    0.750|      -   |     0.050|C  8.0|12.970|    18.055|    18.055|    23.140
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |      |      |          |          |
   UNDERGROUND)             |08/22/2002|12/31/2002**|    26.750|     3.900|AC   5.450|      -   |     0.200|   8.0|36.300|    49.675|    49.675|    63.050
# ROOFER                    |02/22/2002|08/31/2002* |E   24.770|     2.000|AD   3.200|B     -   |     0.200|   8.0|30.170|    41.955|AE  41.955|    53.740
   PITCH WORK               |02/22/2002|08/31/2002* |E   26.520|     2.000|AD   3.200|B     -   |     0.200|   8.0|31.920|    44.580|AE  44.580|    57.240
   PREPARER                 |02/22/1998|08/31/1998* |E   16.240|      -   |     1.000|B     -   |      -   |   8.0|17.240|    24.760|AE  24.760|    32.280
# SHEET METAL WORKER (HVAC) |08/22/2002|12/31/2002**|H   29.440|     4.630|     6.140|      -   |     0.550|   8.0|40.760|    55.480|C   55.480|    70.200
   MAINTENANCE              |08/22/2002|12/31/2002**|H   29.440|     4.630|     6.140|      -   |     0.550|   8.0|40.760|    55.480|C   55.480|    55.480
# TERRAZZO WORKER           |02/22/2001|08/31/2001* |E   26.780|     3.000|     1.790|B     -   |     0.550|C  8.0|32.120|AF  45.510|AG  45.510|AH  58.900
   TERRAZZO FINISHER        |02/22/2001|08/31/2001* |E   20.530|     3.000|     1.790|B     -   |     0.550|C  8.0|25.870|AF  36.135|AG  36.135|AH  46.400
# TILE FINISHER             |08/22/2002|05/31/2003**|Q   16.650|     1.460|     1.250|      -   |     0.200|C  8.0|19.560|R   27.885|S   27.885|    36.210
# TILE LAYER                |08/22/2002|05/31/2003**|Q   26.500|     3.350|     3.900|      -   |     0.200|C  8.0|33.950|R   47.200|S   47.200|    60.450
____________________________________________________________________________________________________________________________________________________________
                                     GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                               PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
B  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
E  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
F  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
G  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
H  INCLUDES AMOUNT WITHHELD FOR WORKING DUES.
I  RATE APPLIES TO THE FIRST 3 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
J  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
K  EMPLOYEE RECEIVES AN AMOUNT EQUAL TO 2% OF THE PRECEDING YEAR'S STRAIGHT-TIME HOURLY EARNINGS AFTER ONE YEAR OF CONTINUOUS SERVICE FOR THE EMPLOYER;
   AN AMOUNT EQUAL TO 4% OF THE PRECEDING YEAR'S STRAIGHT-TIME HOURLY EARNINGS IS PAID AFTER 2 YEARS OF CONTINUOUS SERVICE; AN AMOUNT EQUAL TO 6% OF THE
   PRECEDING YEAR'S STRAIGHT-TIME HOURLY EARNINGS IS PAID AFTER 10 YEARS OF CONTINUOUS SERVICE. WHEN AN EMPLOYEE IS TERMINATED PRIOR TO HAVING 1 YEAR OF
   SERVICE, 2% OF HIS ACCUMULATED STRAIGHT-TIME EARNINGS SHALL BE PAID. WORKERS RECEIVE 8 PAID HOLIDAYS PER YEAR.
L  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SATURDAY OVERTIME HOURLY
   RATE. RATE DOES NOT INCLUDE VACATION/HOLIDAY PAYMENT. PLEASE SEE FOOTNOTE FOR VACATION/HOLIDAY PAYMENT.
M  RATE DOES NOT INCLUDE VACATION/HOLIDAY PAYMENT. PLEASE SEE FOOTNOTE FOR VACATION/HOLIDAY PAYMENT.
N  RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE. RATE DOES NOT INCLUDE VACATION/HOLIDAY PAYMENT, PLEASE
   SEE FOOTNOTE FOR VACATION/HOLIDAY PAYMENT.
O  INCLUDES AN AMOUNT PER HOUR WORKED OR PAID TO DISABILITY FUND.
P  RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
Q  INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
R  RATE APPLIES TO THE FIRST 2 OVERTIME HOURS ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
S  RATE APPLIES TO THE FIRST 10 HOURS WORKED OR UP TO 50 HOURS IN A GIVEN WEEK. ALL HOURS IN EXCESS OF 10 HOURS OR 50 HOURS ARE AT THE SUNDAY/HOLIDAY
   RATE.
T  RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
U  THE RATIO OF PLASTER TENDERS TO PLASTERERS SHALL BE AS FOLLOWS:  FOR INSIDE BROWN COATINGS THERE SHALL BE NOT MORE THAN 3 PLASTERERS TO 2 PLASTER
   TENDERS; FOR INSIDE FINISH COATINGS THERE SHALL BE NOT MORE THAN 3 PLASTERERS TO 1 PLASTER TENDER; ON OUTSIDE FINISH AND BROWN COATINGS AND FOR ALL
   OTHER WORK, THERE SHALL BE NOT MORE THAN 2 PLASTERERS TO 1 PLASTER TENDER.
V  INCLUDES AN AMOUNT PER HOUR WORKED OR PAID FOR SUPPLEMENTAL DUES.
W  APPLIES TO ALL WORK PERFORMED AFTER THE FIRST EIGHT HOURS ON MONDAY THROUGH FRIDAY AND THE FIRST EIGHT HOURS ON SATURDAY.  ALL OTHER TIME IS PAID AT
   THE SUNDAY AND HOLIDAY OVERTIME RATE.
X  INCLUDES AMOUNT FOR NATIONAL PENSION AND RETIREE'S X-MAS FUND.
Y  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
Z  SATURDAY MAY BE WORKED AT STRAIGHT-TIME RATE, PROVIDED THAT THE HOURS DO NOT EXCEED 8 HOURS PER DAY OR 40 HOURS PER WEEK.
AA INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF AND ADMINISTRATIVE DUES.
AB THE FIRST WORKER WILL BE A JOURNEYMAN PLUMBER. THERE MUST BE AT LEAST ONE JOURNEYMAN OR APPRENTICE FOR EACH TRADESMAN USED.
AC INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AD INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
AE SATURDAY IN THE SAME WORKWEEK MAY BE WORKED AT STRAIGHT-TIME IF THE JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER, DURING
   DECEMBER THROUGH APRIL ONLY.
AF RATE APPLIES TO FIRST TWO DAILY OVERTIME HOURS WORKED; ALL OTHER OVERTIME IS PAID AT THE HOLIDAY OVERTIME HOURLY RATE.
AG RATE APPLIES TO THE FIRST 8 HOURS WORKED ON A SIXTH OR SEVENTH CONSECUTIVE DAY DURING ANY ON CALENDAR WEEK UP TO 50 HOURS IN ANY ON CALENDAR WEEK. 
   ALL OTHER TIME IS PAID AT THE HOLIDAY RATE.
AH RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.