GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: DEL NORTE COUNTY

DETERMINATION: DEL-2002-2

____________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|       OVERTIME HOURLY RATE       
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION | TRAINING |      | TOTAL|          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     |  AND/OR  | HOURS|HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |   RATE   |  WELFARE |          |  HOLIDAY |   OTHER  |      | RATE |          |          |   HOLIDAY  
____________________________________________________________________________________________________________________________________________________________
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |      |      |          |          |
   POINTER, CLEANER,        |          |            |          |          |          |          |          |      |      |          |          |
   CAULKER, WATERPROOFER    |08/22/2002|06/30/2003* |A   31.500|     3.950|     5.650|B     -   |     0.350|C  8.0|41.450|    57.200|D   57.200|    72.950
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |      |      |          |          |
   STONEMASON               |08/22/2002|06/30/2003* |E   32.850|     3.750|     6.850|B     -   |     0.350|C  8.0|43.800|F   60.225|D   60.225|    76.650
  BRICK TENDER              |08/22/2002|06/30/2003**|E   24.390|     3.590|     2.770|B     -   |     0.150|C  7.0|30.900|    43.095|    43.095|    55.290
   1ST 1,500 HOURS G        |08/22/2002|06/30/2003* |E   11.800|     3.590|     2.770|B     -   |     0.150|C  7.0|18.310|    24.210|    24.210|    30.110
   2ND 1,500 HOURS G        |08/22/2002|06/30/2003* |E   14.300|     3.590|     2.770|B     -   |     0.150|C  7.0|20.810|    27.960|    27.960|    35.110
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |      |      |          |          |
   RESILIENT TILE LAYER     |08/22/1998|05/31/1999* |    18.000|H    2.310|     1.550|I    1.440|      -   |   8.0|23.300|    42.740|    42.740|    42.740
# ELECTRICIAN:              |          |            |          |          |          |          |          |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2002|11/30/2002* |    24.320|     2.200|J    2.600|      -   |     0.600|   8.0|30.450|    42.975|    42.975|    55.500
   COMM & SYSTEM TECH.      |02/22/2002|11/30/2002* |    27.690|     2.200|J    2.600|      -   |     0.600|   8.0|33.920|    48.180|    48.180|    62.440
   INSIDE WIREMAN           |08/22/2002|05/31/2003* |A   26.120|     3.500|J    4.650|      -   |     0.200|   8.0|35.250|K   48.700|K   48.700|    62.150
   CABLE SPLICER            |08/22/2002|05/31/2003* |A   28.730|     3.500|J    4.650|      -   |     0.200|   8.0|37.940|K   52.735|K   52.735|    67.530
   TUNNEL WIREMAN           |08/22/2002|05/31/2003* |A   26.620|     3.500|J    4.650|      -   |     0.200|   8.0|35.770|K   49.480|K   49.480|    63.190
   TUNNEL CABLE SPLICER     |08/22/2002|05/31/2003* |A   29.230|     3.500|J    4.650|      -   |     0.200|   8.0|38.460|K   53.515|K   53.515|    68.570
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |      |      |          |          |
   (018.167-010) L          |08/22/2002|02/28/2003* |    33.280|     5.890|M    4.250|N    3.000|     0.590|   8.0|47.010|    63.650|    63.650|    80.290
   INSTRUMENTMAN            |          |            |          |          |          |          |          |      |      |          |          |
   (018.167-034) L          |08/22/2002|02/28/2003* |    30.190|     5.890|M    4.250|N    3.000|     0.590|   8.0|43.920|    59.015|    59.015|    74.110
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |      |      |          |          |
   (869.567-010) L          |08/22/2002|02/28/2003* |    27.310|     5.890|M    4.250|N    3.000|     0.590|   8.0|41.040|    54.695|    54.695|    68.350
# GLAZIER                   |08/22/1997|08/31/1998* |&   10.000|      -   |      -   |     0.500|      -   |   8.0|10.500|    15.500|    15.500|    15.500
# MARBLE FINISHER           |08/22/2002|07/31/2003**|A   22.320|     3.470|     2.750|     2.850|     0.250|   8.0|31.640|O   42.800|    53.960|    53.960
# MARBLE SETTER             |08/22/2002|07/31/2003* |A   31.440|     3.950|     7.660|     4.000|     0.350|   8.0|47.400|P   62.400|    77.400|    77.400
# PAINTER:                  |          |            |          |          |          |          |          |      |      |          |          |
   TAPER                    |08/22/2002|07/31/2003* |A   28.930|     3.500|     5.580|     1.700|     0.250|   8.0|39.960|    54.425|C   54.425|    68.890
   TAPER CLEAN-UP           |08/22/2001|07/31/2002* |A   13.290|     3.500|      -   |      -   |      -   |   8.0|16.790|    23.435|C   23.435|    30.080
   BRUSH & ROLLER           |02/19/1994|05/31/1994* |    13.950|     2.060|     0.900|     1.000|     0.020|   8.0|17.930|Q   24.905|    24.905|R   31.880
   PAPERHANGER,             |          |            |          |          |          |          |          |      |      |          |          |
   SANDBLASTER, SPRAY       |          |            |          |          |          |          |          |      |      |          |          |
   PAINTER, STRUCTURAL STEEL|08/22/1998|09/30/1998* |    14.200|     2.060|     0.900|     1.000|     0.020|   8.0|18.180|Q   25.280|    25.280|R   32.380
# PLASTERER                 |08/22/2002|06/30/2003**|S   22.830|     4.480|     4.500|     3.500|     0.500|   8.0|35.810|    46.725|C   46.725|R   57.640
  PLASTER TENDER            |08/22/1999|06/30/2000* |    19.760|     2.240|     2.160|     2.100|     0.330|   8.0|26.590|T   36.470|T   36.470|    46.350
   ENTRY LEVEL (FIRST THRU  |          |            |          |          |          |          |          |      |      |          |          |
   30TH DAY) U              |08/22/1999|06/30/2000* |     9.880|      -   |      -   |     2.100|      -   |   8.0|11.980|T   16.920|T   16.920|    21.860
   ENTRY LEVEL (2ND TO 4TH  |          |            |          |          |          |          |          |      |      |          |          |
   MONTH) U                 |08/22/1999|06/30/2000* |    13.830|     2.240|     2.160|     2.100|     0.330|   8.0|21.660|T   28.575|T   28.575|    35.490
   ENTRY LEVEL (4TH TO 8TH  |          |            |          |          |          |          |          |      |      |          |          |
   MONTH) U                 |08/22/1999|06/30/2000* |    15.810|     2.240|     2.160|     2.100|     0.330|   8.0|22.640|T   30.545|T   30.545|    38.450
   ENTRY LEVEL (8TH TO 12TH |          |            |          |          |          |          |          |      |      |          |          |
   MONTH) U                 |08/22/1999|06/30/2000* |    17.780|     2.240|     2.160|     2.100|     0.330|   8.0|24.610|T   33.500|T   33.500|    42.390
# PLUMBER:                  |          |            |          |          |          |          |          |      |      |          |          |
   PLUMBER, PIPEFITTER      |08/22/2002|09/30/2002**|A   30.510|     6.620|     4.700|B     -   |     0.960|   8.0|42.790|V   58.045|V   58.045|    73.300
   UNDERGROUND              |          |            |          |          |          |          |          |      |      |          |          |
   UTILITY/LANDSCAPE        |          |            |          |          |          |          |          |      |      |          |          |
   PIPEFITTER               |08/22/2002|06/30/2003* |    22.250|     2.700|     2.100|     1.500|     0.250|C  8.0|28.800|    39.925|    39.925|R   51.050
   UNDERGROUND              |          |            |          |          |          |          |          |      |      |          |          |
   UTILITY/LANDSCAPE        |          |            |          |          |          |          |          |      |      |          |          |
   ASSISTANT JOURNEYMAN W   |08/22/2002|06/30/2003* |    12.250|     2.700|     2.100|     1.500|     0.250|C  8.0|18.800|    24.925|    24.925|R   31.050
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |      |      |          |          |
   TRADESMAN W              |08/22/2002|06/30/2003* |     8.250|     2.700|     2.100|     1.500|     0.250|C  8.0|14.800|    18.925|    18.925|R   23.050
   LANDSCAPE TRADESMAN I X  |08/22/2002|06/30/2003* |     8.250|     2.700|      -   |     1.500|     0.250|C  8.0|12.700|    16.825|    16.825|R   20.950
   LANDSCAPE TRADESMAN II X |08/22/2002|06/30/2003* |     8.250|     2.700|     2.100|     1.500|     0.250|C  8.0|14.800|    18.925|    18.925|R   23.050
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |      |      |          |          |
   UNDERGROUND)             |08/22/2002|12/31/2002**|    27.350|     3.900|Y    5.450|      -   |     0.200|   8.0|36.900|    50.575|    50.575|    64.250
# ROOFER                    |02/22/2000|03/31/2000* |&   10.000|     1.840|     1.200|     0.500|     0.300|   8.0|13.840|    18.840|    18.840|    18.840
# SHEET METAL WORKER        |          |            |          |          |          |          |          |      |      |          |          |
   (FOR TOTAL HVAC &        |          |            |          |          |          |          |          |      |      |          |          |
   ARCHITECTURAL SHEET      |          |            |          |          |          |          |          |      |      |          |          |
   METAL COST OF MORE THAN  |          |            |          |          |          |          |          |      |      |          |          |
   $125,000)                |08/22/2002|05/31/2003**|A   21.920|     4.520|     5.120|B     -   |Z    0.670|   8.0|32.230|T   43.190|T   43.190|    54.150
   SHEET METAL WORKER (FOR  |          |            |          |          |          |          |          |      |      |          |          |
   TOTAL HVAC &             |          |            |          |          |          |          |          |      |      |          |          |
   ARCHITECTURAL SHEET      |          |            |          |          |          |          |          |      |      |          |          |
   METAL COST OF $125,000   |          |            |          |          |          |          |          |      |      |          |          |
   OR LESS)                 |08/22/2002|05/31/2003**|A   16.640|     3.060|     2.320|B     -   |     0.300|   8.0|22.320|T   30.640|T   30.640|    38.960
# SHEET METAL WORKER (HVAC) |          |            |          |          |          |          |          |      |      |          |          |
   METAL DECK & SIDING      |08/22/2002|06/30/2003**|E   30.420|     4.500|     7.730|B     -   |Z    0.640|   8.0|43.290|K   58.500|K   58.500|    73.710
# TERRAZZO WORKER           |08/22/2002|06/30/2003**|AA  34.600|     3.750|     6.850|B     -   |     0.100|   7.0|45.300|AB  60.240|AB  60.240|    75.180
   TERRAZZO FINISHER        |08/22/2002|06/30/2003**|AA  24.770|     3.700|     3.050|B     -   |     0.050|   7.0|31.570|AB  42.880|AB  42.880|    54.190
# TILE FINISHER             |08/22/2002|03/31/2003**|A   17.360|AC   3.700|AC   2.620|     0.700|AC   0.250|   8.0|24.630|    26.740|C   26.740|    35.420
   RED CIRCLED FINISHER     |08/22/2002|03/31/2003**|A   23.120|AC   3.700|AC   3.100|     1.300|AC   0.250|   8.0|31.470|    35.980|C   35.980|    47.540
# TILE SETTER               |08/22/2002|03/31/2003**|A   31.180|AC   3.700|AC   3.850|     2.350|AC   0.250|   8.0|41.330|    49.120|C   49.120|    64.710
  WATER WELL DRILLER        |          |            |          |          |          |          |          |      |      |          |          |
   DRILLER, PUMP REPAIRMAN  |02/22/2001|01/31/2002* |    18.170|     3.400|     1.500|AD   0.730|      -   |   8.0|23.800|AE  32.885|AE  32.885|AE  32.885
   PUMP INSTALLER           |02/22/2001|01/31/2002* |    16.250|     3.400|     1.500|AF   0.660|      -   |   8.0|21.810|AE  29.935|AE  29.935|AE  29.935
   HELPER                   |02/22/2001|01/31/2002* |    11.800|     3.400|     1.500|AG   0.510|      -   |   8.0|17.210|AE  23.110|AE  23.110|AE  23.110
____________________________________________________________________________________________________________________________________________________________
                                     GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                               PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
E  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
F  RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
G  THE EMPLOYER SHALL NOT BE PERMITTED AN ENTRY LEVEL MASON TENDER UNLESS A REGULAR MASON TENDER IS EMPLOYED. AN EMPLOYER SHALL NOT BE PERMITTED TO
   EMPLOY A SECOND ENTRY LEVEL MASON TENDER UNTIL FOUR (4) REGULAR MASON TENDERS ARE EMPLOYED.
H  THE HEALTH & WELFARE CONTRIBUTION IS REQUIRED FOR EACH HOUR WORKED UP TO A MAXIMUM OF 40 HOURS IN ANY ONE WEEK. THIS COULD AFFECT EITHER THE TOTAL
   HOURLY RATE OR THE OVERTIME HOURLY RATES.
I  AMOUNT IS EQUAL TO 8% OF THE HOURLY RATE AND  IS FACTORED AT THE APPLICABLE OVERTIME HOURLY RATES.
J  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
K  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
L  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
M  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
N  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
O  RATE ONLY APPLIES TO THE FIRST DAILY OVERTIME HOUR WORKED, MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME HOURS ARE PAID AT THE SATURDAY, SUNDAY, AND
   HOLIDAY OVERTIME RATE.
P  RATE APPLIES TO FIRST OVERTIME HOUR ONLY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
Q  PURSUANT TO SECTION 1815 OF THE LABOR CODE, "WORK PERFORMED BY EMPLOYEES OF CONTRACTORS IN EXCESS OF 8 HOURS PER DAY, AND 40 HOURS DURING ANY ONE
   WEEK, SHALL BE PERMITTED UPON PUBLIC WORK UPON COMPENSATION FOR ALL HOURS WORKED IN EXCESS OF 8 HOURS PER DAY AT NOT LESS THAN 1-1/2 TIMES THE BASIC
   RATE OF PAY."
R  RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
S  INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.
T  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
U  THE RATIO OF TRAINEES SHALL BE ONE TRAINEE TO TWO JOURNEYMEN PLASTER TENDERS.
V  RATE APPLIES TO THE FIRST 4 HOURS MONDAY THROUGH FRIDAY AND FIRST 10 HOURS ON SATURDAY; ALL OTHERTIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
W  THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER ON EACH JOB SITE.
X  THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE
   PERFORMED BY LANDSCAPE IRRIGATION TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN.
Y  INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
Z  INCLUDES AN AMOUNT FOR SUPPLEMENTAL UNEMPLOYMENT BENEFITS.
AA INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AB RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
AC NOT INCLUDED IN THE OVERTIME HOURLY RATE.
AD RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.28 AFTER 2 YEARS; $1.38 AFTER 5 YEARS; $1.53 AFTER 10 YEARS
AE COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
AF RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.21 AFTER 2 YEARS; $1.31 AFTER 5 YEARS; $1.46 AFTER 10 YEARS.
AG RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.06 AFTER 2 YEARS; $1.16 AFTER 5 YEARS; $1.31 AFTER 10 YEARS.