GENERAL PREVAILING WAGE DETERMINATION FOR SHIFT DIFFERENTIAL PAY MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN BERNARDINO COUNTY

DETERMINATION: SBR-2002-2

____________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|       OVERTIME HOURLY RATE       
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION | TRAINING |      | TOTAL|          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     |  AND/OR  | HOURS|HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |   RATE   |  WELFARE |          |  HOLIDAY |   OTHER  |      | RATE |          |          |   HOLIDAY  
____________________________________________________________________________________________________________________________________________________________
# PLUMBER:                  |          |            |          |          |          |          |          |      |      |          |          |
   PLUMBER, INDUSTRIAL AND  |          |            |          |          |          |          |          |      |      |          |          |
   GENERAL PIPEFITTER (2ND  |          |            |          |          |          |          |          |      |      |          |          |
   SHIFT)                   |08/22/2002|06/30/2003**|A   33.830|     4.020|B    5.560|C     -   |     0.430|   8.0|43.840|D   60.485|D   60.485|    75.640
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |      |      |          |          |
   PIPELAYER (2ND SHIFT)    |08/22/2002|06/30/2003* |A   22.980|     4.020|B    5.400|C     -   |     0.330|   8.0|32.730|    43.950|E   43.950|F   54.130
   SEWER AND STORM DRAIN    |          |            |          |          |          |          |          |      |      |          |          |
   PIPE TRADESMAN (2ND      |          |            |          |          |          |          |          |      |      |          |          |
   SHIFT)                   |08/22/2002|06/30/2003* |A   13.050|     4.020|     0.250|      -   |     0.080|   8.0|17.400|    23.655|E   23.655|    29.910
   SERVICE & REPAIR         |          |            |          |          |          |          |          |      |      |          |          |
   (PLUMBER/HVAC-FITTER)    |          |            |          |          |          |          |          |      |      |          |          |
   (2ND SHIFT)              |08/22/2002|06/30/2003* |A   32.810|     4.020|B    5.320|C     -   |     0.100|   8.0|42.250|    58.385|G   58.385|    73.030
   IRRIGATION AND LAWN      |          |            |          |          |          |          |          |      |      |          |          |
   SPRINKLER FITTER SECOND  |          |            |          |          |          |          |          |      |      |          |          |
   SHIFT                    |08/22/2002|06/30/2003* |H   26.400|     4.020|B    5.190|C     -   |     0.350|E  7.0|35.960|    49.160|    49.160|    61.170
   LANDSCAPE IRRIGATION     |          |            |          |          |          |          |          |      |      |          |          |
   TRADESMAN SECOND SHIFT   |08/22/2002|06/30/2003* |I   11.700|     2.000|B    0.750|      -   |     0.050|E  7.0|14.500|    20.350|    20.350|    26.200
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |      |      |          |          |
   UNDERGROUND)- 2ND SHIFT J|08/22/2002|12/31/2002**|    37.180|     3.900|     6.950|C     -   |     0.650|   8.0|48.680|    67.270|K   67.270|    85.860
____________________________________________________________________________________________________________________________________________________________
                       GENERAL PREVAILING WAGE DETERMINATION FOR SHIFT DIFFERENTIAL PAY MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                               PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
B  INCLUDES AMOUNT FOR NATIONAL PENSION AND RETIREE'S X-MAS FUND.
C  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
D  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
E  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
F  THE CORRECT SUNDAY AND HOLIDAY RATE IS $46.18.
G  SATURDAY MAY BE WORKED AT STRAIGHT-TIME RATE, PROVIDED THAT THE HOURS DO NOT EXCEED 8 HOURS PER DAY OR 40 HOURS PER WEEK.
H  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF AND ADMINISTRATIVE DUES.
J  APPLIES TO THE CITIES OF ONTARIO AND MONTCLAIR.
K  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.