State of California
Department of Industrial Relations
Division of Labor Statistics and Research

Provision Selection Page

V San Diego

CRAFT:  CARPENTER

Page Classification Determination Holidays,
Scope of Work,
Travel &
Subsistence
Predetermined
Increase
22   Engineering Construction SD-23-31-4-2001-1

NO INCREASE *
22   Building Construction SD-23-31-4-2001-1A

INCREASE
22   Terrazzo Installer/Finisher SD-31-741-1-2000-1

NO INCREASE *

A single asterisk after the expiration date of a determination indicates that no increase is required for projects advertised while that determination is in effect.  The determination remains in effect until it is canceled, modified, or superceded by a new determination by the Director of Industrial Relations.  A new determination will become effective 10 days after it is issued.  Contact the Division of Labor Statistics and Research at (415) 703-4774 after 10 days from the expiration date, if no subsequent determination is issued.

BACK