GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: SAN MATEO COUNTY

DETERMINATION: SMA-2002-1

____________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|       OVERTIME HOURLY RATE       
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION | TRAINING |      | TOTAL|          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     |  AND/OR  | HOURS|HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |   RATE   |  WELFARE |          |  HOLIDAY |   OTHER  |      | RATE |          |          |   HOLIDAY  
____________________________________________________________________________________________________________________________________________________________
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |      |      |          |          |
   POINTER, CLEANER,        |          |            |          |          |          |          |          |      |      |          |          |
   CAULKER, WATERPROOFER    |08/22/2001|06/30/2002**|A   30.450|     3.500|     5.650|B     -   |     0.350|C  8.0|39.950|    55.175|D   55.175|    70.400
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |      |      |          |          |
   STONEMASON               |02/22/2002|06/30/2002**|A   31.800|     3.500|     6.650|B     -   |     0.350|   8.0|42.300|E   57.580|C   57.580|    72.860
  BRICK TENDER              |08/22/2001|06/30/2002**|F   23.320|     3.530|     6.080|B     -   |      -   |   8.0|32.930|    43.100|G   43.100|    53.270
   TRAINEE 1ST 3 MONTHS     |08/22/2001|06/30/2002* |F   13.990|     3.530|      -   |B     -   |      -   |   8.0|17.520|    23.620|G   23.620|    29.720
   TRAINEE 2ND 3 MONTHS     |08/22/2001|06/30/2002* |F   16.330|     3.530|      -   |B     -   |      -   |   8.0|19.860|    26.980|G   26.980|    34.100
   TRAINEE 3RD 3 MONTHS     |08/22/2001|06/30/2002**|F   18.650|     3.530|     6.080|B     -   |      -   |   8.0|28.260|    36.395|G   36.395|    44.530
   TRAINEE 4TH 3 MONTHS     |08/22/2001|06/30/2002**|F   20.990|     3.530|     6.080|B     -   |      -   |   8.0|30.600|    39.755|G   39.755|    48.910
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |      |      |          |          |
   RESILIENT TILE LAYER     |02/22/2002|06/30/2002* |A   30.000|     3.550|H    4.600|     3.200|     0.500|   8.0|41.850|I   56.850|I   56.850|    71.850
   CARPET LAYER HELPER      |02/22/2002|06/30/2002* |A   28.500|     3.550|H    4.600|     3.040|     0.500|   8.0|40.190|I   54.440|I   54.440|    68.690
   FLR COV HNDR 1ST 2 YRS   |02/22/2002|06/30/2002* |A    9.530|     2.910|      -   |     0.600|      -   |   8.0|13.040|I   17.805|I   17.805|    22.570
   FLR COV HNDR AFTER 2 YRS |02/22/2002|06/30/2002* |A   11.470|     2.910|      -   |     1.200|      -   |   8.0|15.580|I   21.315|I   21.315|    27.050
   MATERIAL HNDR 1ST 2 YRS  |02/22/2002|06/30/2002* |A   18.290|     3.550|H    4.360|     1.980|     0.500|   8.0|28.680|I   37.825|I   37.825|    46.970
   MATERIAL HNDR AFTER 2 YRS|02/22/2002|06/30/2002* |A   20.100|     3.550|H    4.400|     2.210|     0.500|   8.0|30.760|I   40.810|I   40.810|    50.860
# ELECTRICIAN:              |          |            |          |          |          |          |          |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2002|11/30/2002* |    24.320|     2.200|J    2.600|      -   |     0.600|   8.0|30.450|    42.975|    42.975|    55.500
   COMM & SYSTEM TECH.      |02/22/2002|11/30/2002* |    27.690|     2.200|J    2.600|      -   |     0.600|   8.0|33.920|    48.180|    48.180|    62.440
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |      |      |          |          |
   TECHNICIAN               |02/22/2002|05/31/2002* |A   40.300|     3.850|J    6.000|B     -   |     0.450|   8.0|51.810|K   72.565|    93.320|    93.320
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |      |      |          |          |
   CHIEF OF PARTY           |          |            |          |          |          |          |          |      |      |          |          |
   (018.167-010) L          |02/22/2001|02/28/2002**|    32.470|     5.190|H    4.100|M    2.850|     0.590|   8.0|45.200|    61.435|    61.435|    77.670
   INSTRUMENTMAN            |          |            |          |          |          |          |          |      |      |          |          |
   (018.167-034) L          |02/22/2001|02/28/2002**|    29.490|     5.190|H    4.100|M    2.850|     0.590|   8.0|42.220|    56.965|    56.965|    71.710
   CHAINMAN/RODMAN          |          |            |          |          |          |          |          |      |      |          |          |
   (869.567-010) L          |02/22/2001|02/28/2002**|    26.730|     5.190|H    4.100|M    2.850|     0.590|   8.0|39.460|    52.825|    52.825|    66.190
# GLAZIER                   |08/22/2001|06/30/2002* |A   30.470|     3.480|     5.590|B     -   |     0.520|   8.0|40.060|K   55.295|    70.530|    70.530
# MARBLE FINISHER           |02/22/2002|07/31/2002**|A   21.670|     3.220|     2.450|     2.450|     0.250|   8.0|30.040|N   40.875|    51.710|    51.710
# MARBLE SETTER             |02/22/2002|07/31/2002**|A   30.340|     3.500|     7.060|     3.500|     0.350|   8.0|44.750|O   59.250|    73.750|    73.750
# PAINTER:                  |          |            |          |          |          |          |          |      |      |          |          |
   COMMERCIAL & INDUSTRIAL  |02/22/2002|06/30/2002**|A   27.350|     3.500|     4.910|P    1.200|     0.210|   8.0|37.170|    50.520|    50.520|    63.870
   POWER CLEANER, SAND      |          |            |          |          |          |          |          |      |      |          |          |
   BLASTER, SPRAYPAINTER,   |          |            |          |          |          |          |          |      |      |          |          |
   WATERBLASTER             |02/22/2002|06/30/2002**|A   27.850|     3.500|     4.910|P    1.200|     0.210|   8.0|37.670|    51.270|    51.270|    64.870
   SPRAY/WASHING EXOTIC     |          |            |          |          |          |          |          |      |      |          |          |
   MATERIAL                 |02/22/2002|06/30/2002**|A   28.100|     3.500|     4.910|P    1.200|     0.210|   8.0|37.920|    51.645|    51.645|    65.370
   TAPER                    |02/22/2002|07/31/2002**|A   30.780|     3.500|     6.460|     2.000|     0.220|   8.0|42.960|    58.350|C   58.350|    73.740
   TAPER CLEAN-UP           |02/22/2002|07/31/2002* |A   14.130|     3.500|      -   |      -   |      -   |   8.0|17.630|    24.695|C   24.695|    31.760
# PLASTERER                 |08/22/2000|06/30/2001* |A   27.210|     3.950|     6.250|B     -   |     0.500|C  8.0|37.910|Q   51.515|Q   51.515|    65.120
  PLASTER TENDER            |08/22/2001|06/30/2002**|F   23.320|     3.530|     6.080|B     -   |     0.080|   8.0|33.010|    43.195|G   43.195|    53.380
   TRAINEE 1ST 3 MONTHS     |08/22/2001|06/30/2002* |F   11.660|      -   |      -   |B     -   |      -   |   8.0|11.660|    16.750|G   16.750|    21.845
   TRAINEE 2ND 3 MONTHS     |08/22/2001|06/30/2002* |F   11.660|     3.530|      -   |B     -   |      -   |   8.0|15.190|    20.280|G   20.280|    25.375
   TRAINEE 2ND 6 MONTHS     |08/22/2001|06/30/2002* |F   13.990|     3.530|      -   |B     -   |      -   |   8.0|17.520|    23.630|G   23.630|    29.740
   TRAINEE 3RD 6 MONTHS     |08/22/2001|06/30/2002**|F   17.490|     3.530|     6.080|B     -   |     0.080|   8.0|27.180|    34.820|G   34.820|    42.460
   TRAINEE 4TH 6 MONTHS     |08/22/2001|06/30/2002**|F   20.990|     3.530|     6.080|B     -   |     0.080|   8.0|30.680|    39.850|G   39.850|    49.015
# PLUMBER:                  |          |            |          |          |          |          |          |      |      |          |          |
   UNDERGROUND              |          |            |          |          |          |          |          |      |      |          |          |
   UTILITY/LANDSCAPE        |          |            |          |          |          |          |          |      |      |          |          |
   PIPEFITTER               |08/22/2001|06/30/2002**|    22.250|     2.650|     1.800|     1.250|     0.250|   8.0|28.200|    39.325|    39.325|R   50.450
   UNDERGROUND              |          |            |          |          |          |          |          |      |      |          |          |
   UTILITY/LANDSCAPE        |          |            |          |          |          |          |          |      |      |          |          |
   ASSISTANT JOURNEYMAN S   |08/22/2001|06/30/2002**|    12.250|     2.650|     1.800|     1.250|     0.250|   8.0|18.200|    24.325|    24.325|R   30.450
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |      |      |          |          |
   TRADESMAN S              |08/22/2001|06/30/2002**|     8.250|     2.650|     1.800|     1.250|     0.250|   8.0|14.200|    18.325|    18.325|R   22.450
   LANDSCAPE TRADESMAN I T  |08/22/2001|06/30/2002* |     8.250|     2.650|      -   |     1.250|     0.250|   8.0|12.400|    16.525|    16.525|R   20.650
   LANDSCAPE TRADESMAN II T |08/22/2001|06/30/2002**|     8.250|     2.650|     1.800|     1.250|     0.250|   8.0|14.200|    18.325|    18.325|R   22.450
   PLUMBER, STEAMFITTER     |08/22/2001|06/30/2002* |    37.900|     4.630|     6.170|B     -   |U    0.760|   8.0|49.460|V   68.410|V   68.410|    87.360
   REFRIGERATION FITTER     |          |            |          |          |          |          |          |      |      |          |          |
   (HVAC)                   |08/22/2001|06/30/2002* |    39.150|     4.830|     6.170|B     -   |U    0.810|   8.0|50.960|V   70.535|V   70.535|    90.110
   SPRINKLER FITTER (FIRE   |          |            |          |          |          |          |          |      |      |          |          |
   PROTECTION AND FIRE      |          |            |          |          |          |          |          |      |      |          |          |
   CONTROL SYSTEMS)         |08/22/2001|07/31/2002* |A   35.540|     3.400|     8.400|B     -   |     0.500|   8.0|47.840|    65.610|    65.610|    83.380
# ROOFER                    |08/22/2001|07/31/2002**|    22.870|     4.140|     3.700|     3.210|     0.220|   8.0|34.140|    45.575|C   45.575|    45.575
   BITUMASTIC, ENAMELER,    |          |            |          |          |          |          |          |      |      |          |          |
   PIPE WRAPPER, COAL TAR   |          |            |          |          |          |          |          |      |      |          |          |
   PITCH BUILD-UP           |08/22/2001|07/31/2002**|    24.870|     4.140|     3.700|     3.210|     0.220|   8.0|36.140|    48.575|C   48.575|    48.575
   MASTIC WORKER, KETTLEMAN |          |            |          |          |          |          |          |      |      |          |          |
   (2 KETTLES WITHOUT PUMPS)|08/22/2001|07/31/2002**|    23.120|     4.140|     3.700|     3.210|     0.220|   8.0|34.390|    45.950|C   45.950|    45.950
   ROOF REMOVAL WORKER      |08/22/2001|07/31/2002**|    21.850|     4.060|     3.400|     3.210|     0.200|   8.0|32.720|    43.645|C   43.645|    43.645
# SHEET METAL WORKER (HVAC) |08/22/2001|06/30/2002**|W   37.240|     4.420|     7.780|B     -   |X    1.070|   8.0|50.510|Y   69.130|Y   69.130|    87.750
   METAL DECK & SIDING      |08/22/2001|06/30/2002**|W   29.270|     4.400|     7.430|B     -   |X    0.640|   8.0|41.740|Y   56.375|Y   56.375|    71.010
# SHEET METAL WORKER (HVAC):|          |            |          |          |          |          |          |      |      |          |          |
   TOTAL HVAC CONTRACT OF   |          |            |          |          |          |          |          |      |      |          |          |
   $270,000 OR LESS         |08/22/2001|06/30/2002**|W   33.420|     4.420|     7.070|B     -   |X    1.070|   8.0|45.980|Y   62.690|Y   62.690|    79.400
   SERVICE TECHNICIAN       |08/22/2001|06/30/2002**|A   21.880|     3.010|     4.070|B     -   |X    1.070|   8.0|30.030|Q   40.970|Q   40.970|    51.910
   SERVICE TECHNICIAN,      |          |            |          |          |          |          |          |      |      |          |          |
   ADDITIONAL 6 MONTHS      |08/22/2001|06/30/2002**|A   23.270|     3.010|     4.070|B     -   |X    1.070|   8.0|31.420|Q   43.055|Q   43.055|    54.690
   SERVICE TECHNICIAN,      |          |            |          |          |          |          |          |      |      |          |          |
   ADDITIONAL 12 MONTHS     |08/22/2001|06/30/2002**|A   24.810|     3.010|     4.320|B     -   |X    1.070|   8.0|33.210|Q   45.615|Q   45.615|    58.020
   KEY SERVICE EMPLOYEE     |08/22/2001|06/30/2002**|A   24.860|     3.010|     6.890|B     -   |X    1.070|   8.0|35.830|Q   48.260|Q   48.260|    60.690
   SERVICE TECHNICIAN IN    |          |            |          |          |          |          |          |      |      |          |          |
   TRAINING, FIRST 6 MONTHS |08/22/2001|06/30/2002* |A   12.920|     3.010|     0.610|B     -   |X    1.070|   8.0|17.610|Q   24.070|Q   24.070|    30.530
   SERVICE TECHNICIAN IN    |          |            |          |          |          |          |          |      |      |          |          |
   TRAINING, SECOND 6 MONTHS|08/22/2001|06/30/2002* |A   16.450|     3.010|     0.710|B     -   |X    1.070|   8.0|21.240|Q   29.465|Q   29.465|    37.690
   SERVICE TECHNICIAN IN    |          |            |          |          |          |          |          |      |      |          |          |
   TRAINING, THIRD 6 MONTHS |08/22/2001|06/30/2002* |A   18.330|     3.010|     0.710|B     -   |X    1.070|   8.0|23.120|Q   32.285|Q   32.285|    41.450
   SERVICE TECHNICIAN IN    |          |            |          |          |          |          |          |      |      |          |          |
   TRAINING, FOURTH 6 MONTHS|08/22/2001|06/30/2002* |A   20.890|     3.010|     0.710|B     -   |X    1.070|   8.0|25.680|Q   36.125|Q   36.125|    46.570
   AIR CONDITIONING         |          |            |          |          |          |          |          |      |      |          |          |
   SPECIALIST               |08/22/2001|06/30/2002**|A   19.040|     3.010|     2.110|B     -   |X    1.070|   8.0|25.230|Y   34.750|Y   34.750|    44.270
   AIR CONDITIONING         |          |            |          |          |          |          |          |      |      |          |          |
   SPECIALIST IN TRAINING,  |          |            |          |          |          |          |          |      |      |          |          |
   FIRST 6 MONTHS           |08/22/2001|06/30/2002* |A   10.260|     3.010|     0.610|B     -   |X    1.000|   8.0|14.880|Y   20.010|Y   20.010|    25.140
   AIR CONDITIONING         |          |            |          |          |          |          |          |      |      |          |          |
   SPECIALIST IN TRAINING,  |          |            |          |          |          |          |          |      |      |          |          |
   SECOND 6 MONTHS          |08/22/2001|06/30/2002* |A   13.120|     3.010|     0.710|B     -   |X    1.000|   8.0|17.840|Y   24.400|Y   24.400|    30.960
   AIR CONDITIONING         |          |            |          |          |          |          |          |      |      |          |          |
   SPECIALIST IN TRAINING,  |          |            |          |          |          |          |          |      |      |          |          |
   THIRD 6 MONTHS           |08/22/2001|06/30/2002* |A   14.530|     3.010|     0.710|B     -   |X    1.000|   8.0|19.250|Y   26.515|Y   26.515|    33.780
   AIR CONDITIONING         |          |            |          |          |          |          |          |      |      |          |          |
   SPECIALIST IN TRAINING,  |          |            |          |          |          |          |          |      |      |          |          |
   FOURTH 6 MONTHS          |08/22/2001|06/30/2002* |A   16.020|     3.010|     0.710|B     -   |X    1.000|   8.0|20.740|Y   28.750|Y   28.750|    36.760
# TERRAZZO WORKER           |08/22/2001|06/30/2002**|F   33.800|     3.500|     6.650|B     -   |     0.100|   7.0|44.050|Q   58.615|Q   58.615|    73.180
   TERRAZZO FINISHER        |08/22/2001|06/30/2002**|F   24.020|     3.450|     3.050|B     -   |     0.050|   7.0|30.570|Q   41.530|Q   41.530|    52.490
# TILE FINISHER             |08/22/2001|03/31/2002**|A   16.460|Z    3.450|Z    2.370|     0.700|Z    0.100|   8.0|23.080|    25.390|C   25.390|    33.620
   RED CIRCLED FINISHER     |08/22/2001|03/31/2002**|A   22.720|Z    3.450|Z    2.850|     1.300|Z    0.150|   8.0|30.470|    35.380|C   35.380|    46.740
# TILE SETTER               |08/22/2001|03/31/2002**|A   29.780|Z    3.450|Z    3.600|     2.350|Z    0.150|   8.0|39.330|    47.020|C   47.020|    61.910
  WATER WELL DRILLER        |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AA   0.630|      -   |   8.0|17.310|AB  23.660|AB  23.660|AB  23.660
   PUMP INSTALLER           |08/22/1998|12/31/1998* |    12.700|     3.200|     0.780|AA   0.630|      -   |   8.0|17.310|AB  23.660|AB  23.660|AB  23.660
   HELPER                   |08/22/1998|12/31/1998* |    10.380|     3.200|     0.780|AC   0.520|      -   |   8.0|14.880|AB  20.070|AB  20.070|AB  20.070
____________________________________________________________________________________________________________________________________________________________
                                     GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                               PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT DIVISION OF LABOR STATISTICS AND RESEARCH
   (415) 703-4774 FOR NEW RATES AFTER 10 DAYS FROM THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE DIVISION OF LABOR STATISTICS AND RESEARCH FOR SPECIFIC RATES (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT. RATES FOR APPRENTICES ARE AVAILABLE IN THE GENERAL PREVAILING WAGE APPRENTICESHIP SCHEDULES.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
C  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
D  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
E  RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
F  INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
G  RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
H  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
I  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
J  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
K  RATE APPLIES TO THE FIRST 2 OVERTIME HOURS; ALL OTHER TIME IS PAID AT THE SATURDAY OVERTIME HOURLY RATE.
L  DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
M  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
N  RATE ONLY APPLIES TO THE FIRST DAILY OVERTIME HOUR WORKED, MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME HOURS ARE PAID AT THE SATURDAY, SUNDAY, AND
   HOLIDAY OVERTIME RATE.
O  RATE APPLIES TO FIRST OVERTIME HOUR ONLY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
P  INCLUDES AN AMOUNT PER HOUR WORKED FOR BENEFICIAL FUND.
Q  RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
R  RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
S  THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER ON EACH JOB SITE.
T  THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER ON EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE
   PERFORMED BY LANDSCAPE IRRIGATION TRADESMEN WITHOUT THE SUPERVISION OF A JOURNEYMAN.
U  INCLUDES AMOUNT FOR SUPPLEMENTAL VACATION.
V  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
W  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
X  INCLUDES AN AMOUNT FOR SUPPLEMENTAL UNEMPLOYMENT BENEFITS.
Y  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
Z  NOT INCLUDED IN THE OVERTIME HOURLY RATE.
AA RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.88 AFTER 2 YEARS OF EMPLOYMENT.
AB RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK AND FOR ALL HOURS ON SUNDAYS AND HOLIDAYS. RATE DOES NOT INCLUDE ANY
   ADDITIONAL AMOUNT THAT MAY BE REQUIRED FOR VACATION/HOLIDAY PAYMENT.
AC RATE APPLIES TO FIRST YEAR OF EMPLOYMENT ONLY; $0.72 AFTER 2 YEARS OF EMPLOYMENT.