General prevailing wage determinations made
by the director of industrial relations
Pursuant to California Labor Code
part 7, chapter 1, article 2, sections 1770, 1773, and 1773.1
Craft: Drywall Installer/Lather (Carpenter)
| Page |
Drywall Installer/Lather (Carpenter) |
Determination |
Holidays, scope of
work, travel & subsistence |
Predetermined increase |
| 35 |
For projects advertised for bids on or
after September 1, 2004 but through November 30, 2004 |
NC-31-X-16-2004-2 |
|
Increase
|
| 35 |
For projects advertised for bids on or
after December 1, 2004 |
NC-31-X-16-2004-2 |
|
Increase |
Return
to main table
* A single asterisk after the
expiration date of a determination indicates that no increase is required for
projects advertised while that determination is in effect. The
determination remains in effect until it is canceled, modified, or superceded by
a new determination by the Director of Industrial Relations. A new
determination will become effective 10 days after it is issued. Contact
the Division of Labor Statistics and Research at (415) 703-4774 after 10 days
from the expiration date, if no subsequent determination is
issued.
To view the above current prevailing wage determinations,
current predetermined increases, and the current holiday, advisory scope of
work, and travel and subsistence provisions for each craft, you must first
download a free copy of the Adobe Acrobat Reader available by clicking on the
icon below:
|