LOCALITY: SIERRA COUNTY
DETERMINATION: SIE-2013-1
___________________________________________________________________________________________________________________________________________________________________
| | | | EMPLOYER PAYMENTS |STRAIGHT-TIME| OVERTIME HOURLY RATE
CRAFT (JOURNEY LEVEL) | ISSUE | EXPIRATION | BASIC | HEALTH | | VACATION | | | |TOTAL | | | SUNDAY
| DATE | DATE | HOURLY | AND | PENSION | / | TRAINING | OTHER |HOURS |HOURLY| DAILY | SATURDAY | AND
| | | RATE | WELFARE | | HOLIDAY | | | | RATE | | | HOLIDAY
# BRICKLAYER, BLOCKLAYER: | | | | | | | | | | | | |
BRICKLAYER, BLOCKLAYER, | | | | | | | | | | | | |
STONEMASON |08/22/2012|04/30/2013**|A 32.610| 9.690| 9.020|B 2.500| 0.800|C 1.130|D 8.0|55.750|E 73.310|E 73.310| 90.860
POINTER, CLEANER, | | | | | | | | | | | | |
CAULKER, WATERPROOFER |08/22/2012|06/30/2013**|A 34.680| 9.690| 7.530|F - | 1.250| 0.400|D 8.0|53.550| 70.890|G 70.890| 88.230
# BRICK TENDER |08/22/2010|06/30/2011* |H 30.420| 6.040| 7.160|F - | 0.340| - |D 8.0|43.960|E 59.170|E 59.170| 74.380
# CARPET, LINOLEUM, | | | | | | | | | | | | |
RESILIENT TILE LAYER |02/22/2013|12/31/2013**|A 28.200| 9.700| 6.580|I - | 0.500| 0.110| 8.0|45.090|J 59.190|J 59.190| 73.290
# ELECTRICIAN: | | | | | | | | | | | | |
COMM & SYSTEM INSTALLER |02/22/2013|11/30/2013**| 24.380| 9.000|K 1.950|L 2.030| 1.100|M 0.110| 8.0|39.420| 52.040| 52.040| 64.650
COMM & SYSTEM TECH. |02/22/2013|11/30/2013**| 28.080| 9.000|K 1.950|N 2.340| 1.100|M 0.110| 8.0|43.560| 58.090| 58.090| 72.620
INSIDE WIREMAN O |02/22/2012|05/31/2012* | 38.930| 10.630|K 4.500|F - | 1.370|P 0.720| 8.0|57.940| 78.300| 78.300| 98.660
CABLE SPLICER O |02/22/2012|05/31/2012* | 42.820| 10.630|K 4.500|F - | 1.370|P 0.720| 8.0|62.010| 84.400| 84.400| 106.800
INSIDE WIREMAN, | | | | | | | | | | | | |
TECHNICIAN Q |08/22/2000|11/30/2000* | 25.250| 2.250|K 4.340|F - | 0.510| - | 8.0|33.110|R 46.110|R 46.110| 59.110
CABLE SPLICER Q |08/22/2000|11/30/2000* | 27.780| 2.250|K 4.340|F - | 0.510| - | 8.0|35.710|R 50.020|R 50.020| 64.330
# FIELD SURVEYOR: | | | | | | | | | | | | |
CHIEF OF PARTY | | | | | | | | | | | | |
(018.167-010) S |02/22/1996|08/31/1996* |& 17.000| 2.200| - |T 0.915| 0.250| - | 8.0|20.360| 28.860| 28.860| 28.860
INSTRUMENTMAN | | | | | | | | | | | | |
(018.167-034) S |02/22/1996|08/31/1996* |& 12.000| 2.200| - |U 0.650| 0.250| - | 8.0|15.100| 21.100| 21.100| 21.100
CHAINMAN/RODMAN | | | | | | | | | | | | |
(869.567-010) S |02/22/1996|08/31/1996* |& 10.000| 2.200| - |V 0.540| 0.250| - | 8.0|12.990| 17.990| 17.990| 17.990
# GLAZIER |02/22/2013|12/31/2013**|A 32.190| 9.700|W 9.640| - | 0.540|X 0.380| 8.0|52.450|Y 68.540| 84.640| 84.640
# MARBLE FINISHER Z |02/22/2013|07/31/2013**|AA 28.020| 9.690| 2.980|I - | 0.450| 0.200| 8.0|41.340|AB 55.350| 69.360| 69.360
# MARBLE MASON Z |02/22/2013|07/31/2013**|AA 39.220| 9.220| 10.560|I - | 0.550| 0.210| 8.0|59.760|AB 79.370| 98.980| 98.980
# PAINTER: | | | | | | | | | | | | |
BRUSH, SPRAY, | | | | | | | | | | | | |
PAPERHANGER AC |02/22/2013|12/31/2013**|AD 29.010| 9.700| 6.020|I - | 0.310| 0.360|D 8.0|45.400| 59.900|AE 59.900| 74.410
SANDBLASTER, STEAM | | | | | | | | | | | | |
CLEANER, WATERBLASTER AC |02/22/2013|12/31/2013**|AD 29.510| 9.700| 6.020|I - | 0.310| 0.360|D 8.0|45.900| 60.650|AE 60.650| 75.410
EXOTIC MATERIALS |02/22/2013|12/31/2013**|AD 30.010| 9.700| 6.020|I - | 0.310| 0.360|D 8.0|46.400| 61.400|AE 61.400| 76.410
TAPER AC |02/22/2013|12/31/2013**|AF 36.190| 9.700| 8.660|AG - | 0.360| 0.290| 8.0|55.200| 70.150|D 70.150|AE 85.100
TAPER CLEAN-UP AH |02/22/2012|12/31/2012* |AI 14.450| 9.700| - | - | - | - | 8.0|24.150| 30.900|D 30.900|AE 37.660
BRUSH & ROLLER AJ |02/22/2013|06/30/2013* |AK 23.600| 5.590| 4.050| - | 0.300| 0.050| 8.0|33.590| 45.390|AL 45.390|AL 57.190
SPRAY PAINTER, | | | | | | | | | | | | |
PAPERHANGER AJ |02/22/2013|06/30/2013* |AK 24.450| 5.590| 4.050| - | 0.300| 0.050| 8.0|34.440| 46.670|AL 46.670|AL 58.890
SANDBLASTER, SPECIAL | | | | | | | | | | | | |
COATING-BRUSH AJ |02/22/2013|06/30/2013* |AK 24.100| 5.590| 4.050| - | 0.300| 0.050| 8.0|34.090| 46.140|AL 46.140|AL 58.190
STRUCTURAL STEEL & | | | | | | | | | | | | |
STEEPLEJACK 40', SPECIAL | | | | | | | | | | | | |
COATING APPLICATION | | | | | | | | | | | | |
SPRAY AJ |02/22/2013|06/30/2013* |AK 24.600| 5.590| 4.050| - | 0.300| 0.050| 8.0|34.590| 46.890|AL 46.890|AL 59.190
SPECIAL COATING (SPRAY | | | | | | | | | | | | |
STEEL) AJ |02/22/2013|06/30/2013* |AK 24.850| 5.590| 4.050| - | 0.300| 0.050| 8.0|34.840| 47.270|AL 47.270|AL 59.690
SWING STAGE AJ |02/22/2013|06/30/2013* |AK 25.600| 5.590| 4.050| - | 0.300| 0.050| 8.0|35.590| 48.390|AL 48.390|AL 61.190
TAPER AJ |08/22/2012|06/30/2013**|AM 27.020| 5.590| 4.730|I - | 0.250| 0.050| 8.0|37.640| 51.150|AL 51.150|AL 64.660
STEEPLEJACK TAPER AJ |08/22/2012|06/30/2013**|AM 28.520| 5.590| 4.730|I - | 0.250| 0.050| 8.0|39.140| 53.400|AL 53.400|AL 67.660
# PLASTERER |02/22/2013|06/30/2013**|AN 28.440| 11.730| 8.230| 3.000| 0.900| 0.500| 8.0|52.800| 66.250|AO 66.250| 79.690
# PLASTER TENDER |08/22/2012|06/30/2015* | 28.370| 6.540| 8.450| 2.280| 0.370|AP 0.020| 8.0|46.030|J 60.220|J 60.220| 74.400
# PLUMBER: | | | | | | | | | | | | |
PLUMBER, STEAMFITTER, | | | | | | | | | | | | |
REFRIGERATION FITTER | | | | | | | | | | | | |
(HVAC) |02/22/2013|06/30/2013**| 36.200| 10.780| 12.310|F - | 1.200| 1.820| 8.0|62.310|E 80.410|E 80.410| 98.510
UNDERGROUND UTILITY | | | | | | | | | | | | |
PIPEFITTER |02/22/2013|06/30/2013**| 26.350| 4.750|AQ 2.800| 2.000| 0.450| 0.600|D 8.0|36.950| 50.130| 50.130| 63.300
LANDSCAPE PIPEFITTER |02/22/2013|06/30/2013**| 26.350| 4.750|AQ 2.800| 2.000| 0.450| 0.550|D 8.0|36.900| 50.080| 50.080| 63.250
UNDERGROUND UTILITY | | | | | | | | | | | | |
ASSISTANT JOURNEYMAN AR |02/22/2013|06/30/2013**| 15.250| 4.750|AQ 2.800| 2.000| 0.450| 0.600|D 8.0|25.850| 33.470| 33.470| 41.100
LANDSCAPE ASSISTANT | | | | | | | | | | | | |
JOURNEYMAN AR |02/22/2013|06/30/2013**| 15.250| 4.750|AQ 2.800| 2.000| 0.450| 0.550|D 8.0|25.800| 33.420| 33.420| 41.050
UNDERGROUND UTILITY | | | | | | | | | | | | |
TRADESMAN AS |02/22/2013|06/30/2013**| 10.600| 4.750|AQ 2.800| 2.000| 0.450| 0.600|D 8.0|21.200| 26.500| 26.500| 31.800
LANDSCAPE TRADESMAN I AT |02/22/2013|06/30/2013**| 10.400| 4.750|AQ - | 2.000| 0.450| 0.550|D 8.0|18.150| 23.350| 23.350| 28.550
LANDSCAPE TRADESMAN II AT|02/22/2013|06/30/2013**| 10.600| 4.750|AQ 2.800| 2.000| 0.450| 0.550|D 8.0|21.150| 26.450| 26.450| 31.750
FIRE SPRINKLER FITTER | | | | | | | | | | | | |
(PROTECTION AND CONTROL | | | | | | | | | | | | |
SYSTEMS, OVERHEAD AND | | | | | | | | | | | | |
UNDERGROUND) |02/22/2013|03/31/2013* | 33.030| 8.420|AU 10.500| - | 0.450| 0.250| 8.0|52.650| 69.170| 69.170| 85.680
# ROOFER |08/22/2012|07/31/2013**| 27.990| 7.250| 4.400| 4.340| 0.320| - |AV 8.0|44.300|J 58.290|J 58.290| 72.290
BITUMASTIC, ENAMELER, | | | | | | | | | | | | |
COAL TAR, PITCH AND | | | | | | | | | | | | |
MASTIC WORKER |08/22/2012|07/31/2013**| 29.990| 7.250| 4.400| 4.340| 0.320| - |AV 8.0|46.300|J 61.290|J 61.290| 76.290
# SHEET METAL WORKER |02/22/2013|06/30/2013* |A 37.810| 11.050|AQ 16.080|F - | 0.790| 0.680| 8.0|66.410|E 85.320|E 85.320| 104.220
MECHANICAL JOB WHERE | | | | | | | | | | | | |
COST OF PROJECT IS | | | | | | | | | | | | |
$500,000 OR UNDER |02/22/2013|06/30/2013* |A 29.080| 10.800|AQ 14.640|F - | 0.670| 0.380| 8.0|55.570|E 70.110|E 70.110| 84.650
METAL DECK & SIDING |08/22/2012|06/30/2013* |H 33.110| 13.280| 16.400|F - | 0.300| - | 8.0|63.090|R 79.650|R 79.650| 96.200
# TERRAZZO FINISHER | | | | | | | | | | | | |
TERRAZZO FINISHER |02/22/2013|06/30/2013**|AF 32.420| 8.530| 4.580|F - | 0.800| 0.790| 7.0|47.120|AW 61.250|AW 61.250| 75.380
# TERRAZZO WORKER |02/22/2013|06/30/2013**|AF 39.800| 9.690| 13.130|F - | 0.800| 0.880| 7.0|64.300|AW 81.560|AW 81.560| 98.810
# TILE FINISHER |08/22/2011|07/31/2012* | 19.650| 6.300| 0.650|A 1.350| 0.350| 0.200| 8.0|28.500| 38.320| 38.320| 48.150
# TILE SETTER |08/22/2011|07/31/2012* | 32.850| 9.250| 6.050|A 3.100| 0.350| 0.050| 8.0|51.650| 68.070| 68.070| 84.500
WATER WELL DRILLER |11/22/1987|02/29/1988* | 12.350| 2.150| 1.000| 0.480| - | - | 8.0|15.980|AX 22.160|AX 22.160|AX 22.160
PUMP INSTALLER |11/22/1987|02/29/1988* | 12.350| 2.150| 1.000| 0.480| - | - | 8.0|15.980|AX 22.160|AX 22.160|AX 22.160
HELPER |11/22/1987|02/29/1988* | 10.030| 2.150| 1.000| 0.430| - | - | 8.0|13.610|AX 18.630|AX 18.630|AX 18.630
HELPER: 3-6 MONTHS |11/22/1987|02/29/1988* | 9.740| 2.150| 1.000| 0.440| - | - | 8.0|13.330|AX 18.200|AX 18.200|AX 18.200
HELPER: 0-3 MONTHS |11/22/1987|02/29/1988* | 8.930| 2.150| 1.000| 0.420| - | - | 8.0|12.500|AX 16.970|AX 16.970|AX 16.970
___________________________________________________________________________________________________________________________________________________________________
GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
* EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT
AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.
** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
# INDICATES AN APPRENTICEABLE CRAFT. THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @
HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP. TO OBTAIN ANY APPRENTICE WAGE RATES AS OF JULY 1, 2008 AND PRIOR TO SEPTEMBER 1, 2012,
PLEASE CONTACT THE DIVISION OF APPRENTICESHIP STANDARDS OR REFER TO THE DIVISION OF APPRENTICESHIP STANDARDS' WEBSITE AT
HTTP://WWW.DIR.CA.GOV/DAS/DAS.HTML.
& THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.
____________
A INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B AMOUNT INCLUDED IN FACTORING OVERTIME RATES.
C INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE (IMI), AND LABOR MANAGEMENT COOPERATION COMMITTEE (LMCC)
D SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
RATE.
F INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY. ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I INCLUDED IN BASIC HOURLY RATE.
J RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
HOURLY RATE.
K IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
BENEFIT BOARD.
L VACATION/HOLIDAY AMOUNT; AFTER FIVE YEARS OF SERVICE EQUALS $2.59 PER HOUR.
M IN ADDITION TO THE AMOUNT SHOWN, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER FOR EACH OVERTIME HOUR, $0.11 IS ADDED TO THE TOTAL HOURLY
RATE AND OVERTIME HOURLY RATES FOR THE LABOR MANAGEMENT COOPERATION COMMITTEE FUND.
N VACATION/HOLIDAY AMOUNT; AFTER FIVE YEARS OF SERVICE EQUALS $2.99 PER HOUR.
O PORTION OF COUNTY LYING WEST OF THE MAIN WATERSHED DIVIDE.
P IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.
Q APPLIES TO PORTION OF COUNTY LYING ON OR EAST OF THE MAIN WATERSHED DIVIDE.
R RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
HOURLY RATE.
S DICTIONARY OF OCCUPATIONAL TITLES, FOURTH EDITION, 1977, U.S. DEPARTMENT OF LABOR.
T $1.11 AFTER 5 YEARS SERVICE; $1.44 AFTER 6 YEARS SERVICE.
U 78¢ AFTER 5 YEARS SERVICE; $1.02 AFTER 6 YEARS SERVICE.
V 65¢ AFTER 5 YEARS SERVICE; 85¢ AFTER 6 YEARS SERVICE.
W INCLUDES $2.50 FOR THE INDIVIDUAL ACCOUNT RETIREMENT PLAN.
X INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
Y RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND
HOLIDAY OVERTIME RATE.
Z EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.
AA INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AB RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AC PORTION OF COUNTY LYING OUTSIDE THE TAHOE BASIN WATERSHED.
AD INCLUDES AN AMOUNT FOR DUES CHECK-OFF, WAGE EQUALITY DUES, ORGANIZING DUES, BENEFICIAL AND HOLIDAY.
AE DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AF INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AG INCLUDED IN STRAIGHT-TIME HOURLY RATE WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AH PORTION OF COUNTY LYING OUTSIDE THE TAHOE BASIN WATERSHED. PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AI INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.
AJ PORTION OF COUNTY LYING IN THE TAHOE BASIN AREA.
AK INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION.
AL SATURDAYS AND SUNDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT TIME IF THE JOB IS SHUT DOWN DURING THE NORMAL WORK WEEK DUE TO INCLEMENT
WEATHER.
AM INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
AN INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF. PLASTERS OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $2.00 PER DAY ABOVE THE
WAGE RATE.
AO RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AP AMOUNT IS FOR INDUSTRY STABILIZATION ($0.02).
AQ PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE
RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AR THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AS THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON
EACH JOBSITE.
AT THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON
EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION
OF A JOURNEYMAN PIPEFITTER.
AU INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AV SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT TIME RATES IN THE EVENT THAT ADVERSE WEATHER CONDITIONS ON ONE OR MORE DAYS DURING THE
REGULAR WORK WEEK PREVENT EMPLOYEES FROM WORKING.
AW RATE APPLIES TO THE FIRST 3 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE
SUNDAY/HOLIDAY OVERTIME RATE.
AX RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK. DOUBLE-TIME IS PAID FOR WORK ON RECOGNIZED HOLIDAYS.
RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
THE DIRECTOR OF INDUSTRIAL RELATIONS. IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE. YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/PWD. HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINAT
TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH
WORKER TO EXECUTE THE WORK. YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT
HTTP://WWW.DIR.CA.GOV/OPRL/PWD. TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE
OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.