GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: PLACER COUNTY

DETERMINATION: PLA-2014-1

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON               |08/22/2013|04/30/2014* |A   33.980|     9.690|     9.100|B    2.500|     0.800|C   1.180|D  8.0|57.250|E   75.490|E   75.490|    93.730
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |08/22/2013|06/30/2014**|A   36.400|     9.690|     7.700|F     -   |     1.360|    0.400|D  8.0|55.550|    73.750|G   73.750|    91.950
# BRICK TENDER              |08/22/2013|06/29/2014**|H   31.520|     6.640|     9.500|F     -   |     0.390|      -  |D  8.0|48.050|E   63.810|E   63.810|    79.570
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   RESILIENT TILE LAYER I   |08/22/2013|06/30/2014**|A   25.400|     5.890|     5.400|J     -   |     0.250|      -  |   8.0|36.940|    49.640|    49.640|K   62.340
   RESILIENT TILE LAYER L   |02/22/2014|06/30/2014* |A   28.200|     9.700|     6.830|J     -   |     0.500|    0.110|   8.0|45.340|M   59.440|M   59.440|    73.540
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |02/22/2014|11/30/2014* |    24.680|     9.550|N    2.200|O    2.060|     1.100|P   0.110|   8.0|40.560|    53.330|    53.330|    66.100
   COMM & SYSTEM TECH.      |02/22/2014|11/30/2014* |    28.380|     9.550|N    2.200|Q    2.360|     1.100|P   0.110|   8.0|44.690|    59.380|    59.380|    74.060
   INSIDE WIREMAN           |02/22/2014|05/31/2014* |    39.060|    11.130|N    5.000|F     -   |     1.240|R   0.470|   8.0|58.700|    79.130|    79.130|    99.550
   CABLE SPLICER            |02/22/2014|05/31/2014* |    42.970|    11.130|N    5.000|F     -   |     1.240|R   0.470|   8.0|62.790|    85.260|    85.260|   107.740
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY S         |02/22/2014|02/28/2015* |    37.290|    12.530|T   10.000|U    3.380|     0.720|    0.160|   8.0|64.080|V   82.720|W   82.720|   101.370
   INSTRUMENTMAN S          |02/22/2014|02/28/2015* |    34.200|    12.530|T   10.000|U    3.380|     0.720|    0.160|   8.0|60.990|V   78.090|W   78.090|    95.190
   CHAINMAN/RODMAN S        |02/22/2014|02/28/2015* |    31.320|    12.530|T   10.000|U    3.380|     0.720|    0.160|   8.0|58.110|V   73.770|W   73.770|    89.430
# GLAZIER                   |02/22/2014|06/30/2014* |A   32.190|     9.700|X   10.390|      -   |     0.540|Y   0.380|   8.0|53.200|Z   69.290|    85.390|    85.390
# MARBLE FINISHER AA        |08/22/2013|07/31/2014* |AB  28.050|     9.690|     3.870|J     -   |     0.450|    0.530|   8.0|42.590|AC  56.610|    70.640|    70.640
# MARBLE MASON AA           |08/22/2013|07/31/2014* |AB  39.300|     9.690|    11.990|J     -   |     0.800|    0.730|   8.0|62.510|AC  82.160|   101.810|   101.810
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   BRUSH, SPRAY,            |          |            |          |          |          |          |          |         |      |      |          |          |
   PAPERHANGER AD           |02/22/2014|06/30/2014* |AE  29.970|     9.700|     6.310|J     -   |     0.310|    0.360|D  8.0|46.650|    61.630|AF  61.630|    76.620
   SANDBLASTER, STEAM       |          |            |          |          |          |          |          |         |      |      |          |          |
   CLEANER, WATERBLASTER AD |02/22/2014|06/30/2014* |AE  30.470|     9.700|     6.310|J     -   |     0.310|    0.360|D  8.0|47.150|    62.380|AF  62.380|    77.620
   EXOTIC MATERIALS         |02/22/2014|06/30/2014* |AE  30.970|     9.700|     6.310|J     -   |     0.310|    0.360|D  8.0|47.650|    63.130|AF  63.130|    78.620
   TAPER AD                 |02/22/2014|06/30/2014* |AG  36.190|     9.700|     9.140|AH    -   |     0.360|    0.290|   8.0|55.680|    70.630|D   70.630|AF  85.580
   TAPER CLEAN-UP AI        |02/22/2014|06/30/2014* |AJ  14.450|     9.700|      -   |      -   |      -   |      -  |   8.0|24.150|    30.900|D   30.900|AF  37.660
   BRUSH & ROLLER I         |08/22/2013|06/30/2015* |AK  23.300|     5.890|     4.050|      -   |     0.300|    0.050|   8.0|33.590|    45.240|AL  45.240|AL  56.890
   SPRAY PAINTER,           |          |            |          |          |          |          |          |         |      |      |          |          |
   PAPERHANGER I            |08/22/2013|06/30/2015* |AK  24.150|     5.890|     4.050|      -   |     0.300|    0.050|   8.0|34.440|    46.510|AL  46.510|AL  58.590
   SANDBLASTER, SPECIAL     |          |            |          |          |          |          |          |         |      |      |          |          |
   COATING-BRUSH I          |08/22/2013|06/30/2015* |AK  23.800|     5.890|     4.050|      -   |     0.300|    0.050|   8.0|34.090|    45.990|AL  45.990|AL  57.890
   STRUCTURAL STEEL &       |          |            |          |          |          |          |          |         |      |      |          |          |
   STEEPLEJACK 40', SPECIAL |          |            |          |          |          |          |          |         |      |      |          |          |
   COATING APPLICATION      |          |            |          |          |          |          |          |         |      |      |          |          |
   SPRAY I                  |08/22/2013|06/30/2015* |AK  24.300|     5.890|     4.050|      -   |     0.300|    0.050|   8.0|34.590|    46.740|AL  46.740|AL  58.890
   SPECIAL COATING (SPRAY   |          |            |          |          |          |          |          |         |      |      |          |          |
   STEEL) I                 |08/22/2013|06/30/2015* |AK  24.550|     5.890|     4.050|      -   |     0.300|    0.050|   8.0|34.840|    47.110|AL  47.110|AL  59.390
   SWING STAGE I            |08/22/2013|06/30/2015* |AK  25.300|     5.890|     4.050|      -   |     0.300|    0.050|   8.0|35.590|    48.240|AL  48.240|AL  60.890
   TAPER I                  |08/22/2013|06/30/2014**|AM  27.020|     5.890|     5.000|J     -   |     0.250|    0.050|   8.0|38.210|    51.720|AL  51.720|AL  65.230
   STEEPLEJACK TAPER I      |08/22/2013|06/30/2014**|AM  28.520|     5.890|     5.000|J     -   |     0.250|    0.050|   8.0|39.710|    53.970|AL  53.970|AL  68.230
# PLASTERER                 |08/22/2013|06/30/2014**|AN  29.240|    12.030|     8.430|     3.000|     0.950|    0.900|   8.0|54.550|    68.360|AO  68.360|    82.160
# PLASTER TENDER            |08/22/2013|06/30/2014**|    29.120|     6.640|     9.020|     2.430|     0.390|AP  0.030|   8.0|47.630|M   62.190|M   62.190|    76.750
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, PIPEFITTER I    |08/22/2013|07/31/2014* |    34.340|     4.570|AQ   6.340|F     -   |      -   |AR  0.100|D  8.0|45.350|E   62.520|E   62.520|    79.690
   PLUMBER, PIPEFITTER      |          |            |          |          |          |          |          |         |      |      |          |          |
   HELPER I                 |08/22/2013|07/31/2014* |    13.630|     4.570|AQ    -   |F     -   |      -   |      -  |D  8.0|18.200|E   25.010|E   25.010|    31.830
   LIGHT COMMERCIAL PLUMBER |          |            |          |          |          |          |          |         |      |      |          |          |
   I                        |08/22/2013|07/31/2014* |    28.140|     4.570|AQ   6.340|F     -   |      -   |AR  0.100|   8.0|39.150|    53.220|    53.220|    67.290
   LIGHT COMMERCIAL PLUMBER |          |            |          |          |          |          |          |         |      |      |          |          |
   - HELPER I               |08/22/2013|07/31/2014* |    13.630|     4.570|AQ    -   |F     -   |      -   |      -  |   8.0|18.200|    25.010|    25.010|    31.830
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |08/22/2013|06/30/2014* |    26.550|     4.900|AQ   2.950|     2.000|     0.450|    0.600|D  8.0|37.450|    50.720|    50.720|    64.000
   LANDSCAPE PIPEFITTER     |08/22/2013|06/30/2014* |    26.550|     4.900|AQ   2.950|     2.000|     0.450|    0.550|D  8.0|37.400|    50.670|    50.670|    63.950
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN AS  |08/22/2013|06/30/2014* |    15.550|     4.900|AQ   2.950|     2.000|     0.450|    0.600|D  8.0|26.450|    34.220|    34.220|    42.000
   LANDSCAPE ASSISTANT      |          |            |          |          |          |          |          |         |      |      |          |          |
   JOURNEYMAN AS            |08/22/2013|06/30/2014* |    15.550|     4.900|AQ   2.950|     2.000|     0.450|    0.550|D  8.0|26.400|    34.180|    34.180|    41.950
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN AT             |08/22/2013|06/30/2014* |    10.850|     4.900|AQ   2.950|     2.000|     0.450|    0.600|D  8.0|21.750|    27.180|    27.180|    32.600
   LANDSCAPE TRADESMAN I AU |08/22/2013|06/30/2014* |    10.500|     4.900|AQ    -   |     2.000|     0.450|    0.550|D  8.0|18.400|    23.650|    23.650|    28.900
   LANDSCAPE TRADESMAN II AU|08/22/2013|06/30/2014* |    10.850|     4.900|AQ   2.950|     2.000|     0.450|    0.550|D  8.0|21.700|    27.130|    27.130|    32.550
   PLUMBER, STEAMFITTER L   |08/22/2013|06/30/2014**|A   41.770|    12.700|AQ   8.350|F     -   |     0.950|    0.450|   8.0|64.220|E   85.100|AV  85.100|   105.990
   PLUMBER (FOR TOTAL       |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBING JOBS $150,000   |          |            |          |          |          |          |          |         |      |      |          |          |
   OR UNDER) L              |08/22/2013|06/30/2014* |A   32.230|    10.070|     5.850|F     -   |     0.950|    0.450|D  8.0|49.550|E   65.670|AW  65.670|    81.780
   FIRE SPRINKLER FITTER    |          |            |          |          |          |          |          |         |      |      |          |          |
   (PROTECTION AND CONTROL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SYSTEMS, OVERHEAD AND    |          |            |          |          |          |          |          |         |      |      |          |          |
   UNDERGROUND)             |02/22/2013|03/31/2013* |    33.030|     8.420|AX  10.500|      -   |     0.450|    0.250|   8.0|52.650|    69.170|    69.170|    85.680
# ROOFER                    |08/22/2013|07/31/2014* |    28.050|     7.940|     4.800|     4.340|     0.320|      -  |AY 8.0|45.450|M   59.470|M   59.470|    73.500
   BITUMASTIC, ENAMELER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   COAL TAR, PITCH AND      |          |            |          |          |          |          |          |         |      |      |          |          |
   MASTIC WORKER            |08/22/2013|07/31/2014* |    30.050|     7.940|     4.800|     4.340|     0.320|      -  |AY 8.0|47.450|M   62.470|M   62.470|    77.500
# SHEET METAL WORKER        |08/22/2013|06/30/2014**|A   38.430|    11.550|AQ  16.960|F     -   |     0.790|    0.710|   8.0|68.440|E   87.660|E   87.660|   106.870
   METAL DECK & SIDING      |08/22/2013|09/30/2013* |H   33.110|    13.280|    16.400|F     -   |AZ   0.300|      -  |   8.0|63.090|BA  79.650|BA  79.650|    96.200
# TERRAZZO FINISHER         |02/22/2014|06/30/2014* |AG  33.150|     8.530|     5.100|F     -   |     0.800|    0.790|   8.0|48.370|BA  62.870|BA  62.870|    77.360
# TERRAZZO WORKER           |08/22/2013|06/30/2014* |AG  39.950|     9.690|    13.900|F     -   |     0.800|    0.960|   8.0|65.300|BA  82.630|BA  82.630|    99.960
# TILE FINISHER             |08/22/2011|07/31/2012* |    19.650|     6.300|     0.650|A    1.350|     0.350|    0.200|   8.0|28.500|    38.320|    38.320|    48.150
# TILE SETTER               |08/22/2011|07/31/2012* |    32.850|     9.250|     6.050|A    3.100|     0.350|    0.050|   8.0|51.650|    68.070|    68.070|    84.500
  WATER WELL DRILLER        |11/22/1987|02/29/1988* |    12.350|     2.150|     1.000|     0.480|      -   |      -  |   8.0|15.980|BB  22.160|BB  22.160|BB  22.160
   PUMP INSTALLER           |11/22/1987|02/29/1988* |    12.350|     2.150|     1.000|     0.480|      -   |      -  |   8.0|15.980|BB  22.160|BB  22.160|BB  22.160
   HELPER                   |11/22/1987|02/29/1988* |    10.030|     2.150|     1.000|     0.430|      -   |      -  |   8.0|13.610|BB  18.630|BB  18.630|BB  18.630
   HELPER: 3-6 MONTHS       |11/22/1987|02/29/1988* |     9.740|     2.150|     1.000|     0.440|      -   |      -  |   8.0|13.330|BB  18.200|BB  18.200|BB  18.200
   HELPER: 0-3 MONTHS       |11/22/1987|02/29/1988* |     8.930|     2.150|     1.000|     0.420|      -   |      -  |   8.0|12.500|BB  16.970|BB  16.970|BB  16.970
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT
   AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.


** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED.  IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW.  CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT.  THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @
   HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.  TO OBTAIN ANY APPRENTICE WAGE RATES AS OF JULY 1, 2008 AND PRIOR TO SEPTEMBER 27, 2012,
   PLEASE CONTACT THE DIVISION OF APPRENTICESHIP STANDARDS OR REFER TO THE DIVISION OF APPRENTICESHIP STANDARDS' WEBSITE AT
   HTTP://WWW.DIR.CA.GOV/DAS/DAS.HTML.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  AMOUNT INCLUDED IN FACTORING OVERTIME RATES.
C  INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE (IMI), AND LABOR MANAGEMENT COOPERATION COMMITTEE (LMCC)
D  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
F  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H  INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
I  PORTION OF COUNTY LYING IN THE TAHOE BASIN AREA.
J  INCLUDED IN BASIC HOURLY RATE.
K  RATE APPLIES TO WORK ON HOLIDAYS ONLY; SUNDAYS ARE PAID AT THE SATURDAY OVERTIME HOURLY RATE.
L  RATE APPLIES TO REMAINDER OF COUNTY.
M  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
N  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
O  VACATION/HOLIDAY AMOUNT; AFTER FIVE YEARS OF SERVICE EQUALS $2.64 PER HOUR.
P  IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES FOR THE ADMINISTRATIVE MAINTENANCE FUND.
Q  VACATION/HOLIDAY AMOUNT; AFTER FIVE YEARS OF SERVICE EQUALS $3.04 PER HOUR.
R  IN ADDITION, AN AMOUNT EQUAL TO 1.6% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES FOR THE CONTRACT ADMINISTRATION FUND.
S  ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY.  A CREW CONSISTS OF ONE (1) OR MORE
   EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
T  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
U  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
V  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY.  ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
W  RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED.  ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.  IN THE EVENT IT IS NOT REASONABLY
   POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON
   SATURDAY AT THE STRAIGHT-TIME RATE.
X  INCLUDES $2.50 FOR THE INDIVIDUAL ACCOUNT RETIREMENT PLAN.
Y  INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
Z  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND
   HOLIDAY OVERTIME RATE.
AA EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFOLD SHALL BE PAID AN ADDITIONAL $15.00 PER DAY ABOVE THE WAGE RATE.
AB INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
AC RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AD PORTION OF COUNTY LYING OUTSIDE THE TAHOE BASIN WATERSHED.
AE INCLUDES AN AMOUNT FOR DUES CHECK-OFF, WAGE EQUALITY DUES, ORGANIZING DUES, BENEFICIAL AND HOLIDAY.
AF DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AG INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AH INCLUDED IN STRAIGHT-TIME HOURLY RATE WHICH IS NOT FACTORED IN THE OVERTIME RATES.
AI PORTION OF COUNTY LYING OUTSIDE THE TAHOE BASIN WATERSHED.  PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AJ INCLUDES AN AMOUNT WITHHELD FOR DUES CHECK OFF WHICH IS NOT FACTORED IN OVERTIME AND HOLIDAY WAGE RATES.
AK INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION.
AL SATURDAYS AND SUNDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT TIME IF THE JOB IS SHUT DOWN DURING THE NORMAL WORK WEEK DUE TO INCLEMENT
   WEATHER.
AM INCLUDES AMOUNT WITHHELD FOR ADMINISTRATIVE DUES.
AN INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.  PLASTERS OPERATING AND WORKING BEHIND PLASTER GUNS SHALL RECEIVE AN ADDITIONAL $2.00 PER DAY ABOVE THE
   WAGE RATE.
AO RATE APPLIES TO THE FIRST 8 HOURS WORKED; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AP AMOUNT IS FOR INDUSTRY STABILIZATION ($0.03)
AQ PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE
   RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AR AMOUNT IS FOR CONTRACT ADMINISTRATION
AS THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AT THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON
   EACH JOBSITE.
AU THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER  COMBINATION EMPLOYED PER CONTRACTOR ON
   EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION
   OF A JOURNEYMAN PIPEFITTER.
AV RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.

AW RATE APPLIES TO THE FIRST 10 HOURS ON SATURDAY IF HOURS WORKED ARE UNDER 40 HOURS PER WEEK. FOR WORK OVER 40 HOURS IN ONE WEEK, THE SATURDAY RATE IS
   1.5X THE BASIC HOURLY RATE (NO FRINGE BENEFITS ARE INCLUDED). ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY RATE.
AX INCLUDES AN AMOUNT FOR SUPPLEMENTAL PENSION FUND.
AY SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT TIME RATES IN THE EVENT THAT ADVERSE WEATHER CONDITIONS ON ONE OR MORE DAYS DURING THE
   REGULAR WORK WEEK PREVENT EMPLOYEES FROM WORKING.
AZ INCLUDES $0.03 FOR SCHOLAR FUND.
BA RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
BB RATE APPLIES TO ALL TIME WORKED IN EXCESS OF 8 HOURS PER DAY OR 40 HOURS PER WEEK. DOUBLE-TIME IS PAID FOR WORK ON RECOGNIZED HOLIDAYS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE
   OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH
   WORKER TO EXECUTE THE WORK.  YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT
   HTTP://WWW.DIR.CA.GOV/OPRL/PWD.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE
   OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.