GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1
FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: CONTRA COSTA COUNTY

DETERMINATION: CON-2015-2

___________________________________________________________________________________________________________________________________________________________________
                            |          |            |          |              EMPLOYER PAYMENTS            |STRAIGHT-TIME|          OVERTIME HOURLY RATE          
  CRAFT (JOURNEY LEVEL)     |   ISSUE  | EXPIRATION |   BASIC  |  HEALTH  |          | VACATION |          |         |      |TOTAL |          |          |   SUNDAY
                            |   DATE   |    DATE    |  HOURLY  |    AND   |  PENSION |    /     | TRAINING |  OTHER  |HOURS |HOURLY|   DAILY  | SATURDAY |     AND
                            |          |            |    RATE  |  WELFARE |          |  HOLIDAY |          |         |      | RATE |          |          |   HOLIDAY  
# BRICKLAYER, BLOCKLAYER:   |          |            |          |          |          |          |          |         |      |      |          |          |
   BRICKLAYER, BLOCKLAYER,  |          |            |          |          |          |          |          |         |      |      |          |          |
   STONEMASON               |08/22/2015|04/30/2016**|A   38.800|     9.790|    10.040|B    3.030|     0.800|C   1.240|D  8.0|63.700|E   84.600|E   84.600|   105.500
   POINTER, CLEANER,        |          |            |          |          |          |          |          |         |      |      |          |          |
   CAULKER, WATERPROOFER    |08/22/2015|06/30/2016**|A   43.390|     9.790|    10.790|F     -   |     1.460|    0.400|D  8.0|65.830|    87.520|G   87.520|   109.220
# BRICK TENDER              |08/22/2015|04/30/2016**|A   32.180|    10.000|    10.100|F     -   |     0.390|      -  |   8.0|52.670|H   68.760|H   68.760|    84.850
# CARPET, LINOLEUM,         |          |            |          |          |          |          |          |         |      |      |          |          |
   SOFT FLOOR LAYER         |08/22/2015|12/31/2015**|A   46.150|     9.900|    11.300|I     -   |     0.630|    0.340|   8.0|68.320|J   91.400|J   91.400|   114.470
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   AFTER 3 YEARS            |08/22/2015|12/31/2015**|A   23.050|     9.900|     5.650|I     -   |     0.050|    0.340|   8.0|38.990|J   50.510|J   50.510|    62.040
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   LESS THAN 3 YEARS        |08/22/2015|12/31/2015**|A   18.430|     9.900|     4.520|I     -   |     0.050|    0.340|   8.0|33.240|J   42.460|J   42.460|    51.670
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, FIRST 3 MONTHS  |08/22/2015|12/31/2015**|A   14.730|     9.900|     3.620|I     -   |     0.050|    0.340|   8.0|28.640|J   36.000|J   36.000|    43.370
   FLOOR COVERING HANDLER   |          |            |          |          |          |          |          |         |      |      |          |          |
   TRAINEE, SECOND 3 MONTHS |08/22/2015|12/31/2015**|A   16.580|     9.900|     4.070|I     -   |     0.050|    0.340|   8.0|30.940|J   39.230|J   39.230|    47.520
# ELECTRICIAN:              |          |            |          |          |          |          |          |         |      |      |          |          |
   COMM & SYSTEM INSTALLER  |08/22/2015|11/30/2015**|    33.320|     9.550|K    4.650|      -   |     1.100|L   0.210|   8.0|50.000|M   67.240|M   67.240|    84.490
   COMM & SYSTEM TECH.      |08/22/2015|11/30/2015**|    37.940|     9.550|K    4.650|      -   |     1.100|L   0.210|   8.0|54.780|M   74.410|M   74.410|    94.050
   INSIDE WIREMAN,          |          |            |          |          |          |          |          |         |      |      |          |          |
   TECHNICIAN               |08/22/2015|02/28/2016**|A   46.510|    13.100|K   10.000|      -   |     0.650|N   0.860|   8.0|72.520|O   96.470|O   96.470|   120.420
   CABLE SPLICER            |08/22/2015|02/28/2016**|A   52.920|    13.100|K   10.000|      -   |     0.650|N   0.860|   8.0|79.120|O  106.370|O  106.370|   133.630
# FIELD SURVEYOR:           |          |            |          |          |          |          |          |         |      |      |          |          |
   CHIEF OF PARTY P         |08/22/2015|02/29/2016**|    38.070|    13.030|Q   10.640|R    3.410|     0.770|    0.160|   8.0|66.080|S   85.110|T   85.110|   104.150
   INSTRUMENTMAN P          |08/22/2015|02/29/2016**|    34.980|    13.030|Q   10.640|R    3.410|     0.770|    0.160|   8.0|62.990|S   80.480|T   80.480|    97.970
   CHAINMAN/RODMAN P        |08/22/2015|02/29/2016**|    32.100|    13.030|Q   10.640|R    3.410|     0.770|    0.160|   8.0|60.110|S   76.160|T   76.160|    92.210
# GLAZIER                   |08/22/2015|12/31/2015**|A   43.430|     9.900|U   14.290|      -   |     0.550|V   0.380|   8.0|68.550|W   90.260|   111.980|   111.980
# MARBLE FINISHER X         |08/22/2015|07/31/2016**|Y   30.220|     9.790|     3.930|I     -   |     0.450|    0.550|   8.0|44.940|Z   60.050|    75.160|    75.160
# MARBLE MASON X            |08/22/2015|07/31/2016**|Y   40.410|     9.790|    14.390|I     -   |     0.800|    0.770|   8.0|66.160|Z   86.360|   106.570|   106.570
# PAINTER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   BRUSH AND SPRAY          |02/22/2015|12/31/2015**|AA  36.400|     9.900|Q   11.160|I     -   |     0.420|    0.380|D  8.0|58.260|    76.460|AB  76.460|    94.660
   INDUSTRIAL PAINTER       |02/22/2015|12/31/2015**|AA  36.900|     9.900|Q   11.160|I     -   |     0.420|    0.380|D  8.0|58.760|    77.210|AB  77.210|    95.660
   SANDBLASTER, STEAM       |          |            |          |          |          |          |          |         |      |      |          |          |
   CLEANER, WATERBLASTER    |02/22/2015|12/31/2015**|AA  36.900|     9.900|Q   11.160|I     -   |     0.420|    0.380|D  8.0|58.760|    77.210|AB  77.210|    95.660
   EXOTIC MATERIALS         |02/22/2015|12/31/2015**|AA  37.150|     9.900|Q   11.160|I     -   |     0.420|    0.380|D  8.0|59.010|    77.580|AB  77.580|    96.160
   PAPERHANGER/WALLCOVERING |02/22/2015|12/31/2015**|AA  37.400|     9.900|Q   11.160|I     -   |     0.420|    0.380|D  8.0|59.260|    77.960|AB  77.960|    96.660
   TAPER                    |08/22/2015|12/31/2015**|AC  42.320|     9.900|    11.020|I     -   |     0.410|    0.390|   8.0|64.040|    85.200|D   85.200|AB 106.360
   TAPER CLEAN-UP AD        |08/22/2015|12/31/2015* |AE  16.900|     9.900|      -   |      -   |      -   |      -  |   8.0|26.800|    35.250|D   35.250|AB  43.700
# PLASTERER                 |08/22/2015|06/30/2016**|AF  38.490|    13.030|    10.630|F     -   |     1.090|    1.050|D  8.0|64.290|AG  80.920|AG  80.920|    97.540
# PLASTER TENDER AH         |08/22/2015|06/30/2016* |AI  32.400|     9.330|    12.770|F     -   |     0.340|    0.580|   8.0|55.420|AJ  69.070|AJ  69.070|    82.720
   GUN MAN AH               |08/22/2015|06/30/2016* |AI  33.150|     9.330|    12.770|F     -   |     0.340|    0.580|   8.0|56.170|AJ  70.190|AJ  70.190|    84.220
# PLUMBER:                  |          |            |          |          |          |          |          |         |      |      |          |          |
   PLUMBER, PIPE FITTER &   |          |            |          |          |          |          |          |         |      |      |          |          |
   REFRIGERATION FITTER     |          |            |          |          |          |          |          |         |      |      |          |          |
   (HVAC)                   |08/22/2015|06/30/2016* |A   53.420|    17.560|AK  15.130|      -   |     1.750|    1.700|   8.0|89.560|E  116.270|E  116.270|   142.980
   SERVICE TECHNICIAN       |08/22/2015|06/30/2016* |A   52.530|    17.560|AK  15.130|      -   |     1.750|    1.700|   8.0|88.670|   114.930|AL 114.930|   114.930
   STEAMFITTER              |08/22/2015|06/30/2016**|A   53.460|AM  17.550|AN  13.840|      -   |     3.700|    0.300|   8.0|94.350|E  123.830|E  123.830|   153.310
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPEFITTER               |08/22/2015|06/30/2016**|    26.600|     6.600|AK   3.000|     2.000|     0.450|    0.600|D  8.0|39.250|    52.550|    52.550|    65.850
   LANDSCAPE PIPEFITTER     |08/22/2015|06/30/2016**|    26.600|     6.600|AK   3.000|     2.000|     0.450|    0.600|D  8.0|39.250|    52.550|    52.550|    65.850
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   ASSISTANT JOURNEYMAN AO  |08/22/2015|06/30/2016**|    15.600|     6.600|AK   3.000|     2.000|     0.450|    0.600|D  8.0|28.250|    36.050|    36.050|    43.850
   LANDSCAPE ASSISTANT      |          |            |          |          |          |          |          |         |      |      |          |          |
   JOURNEYMAN AO            |08/22/2015|06/30/2016**|    15.600|     6.600|AK   3.000|     2.000|     0.450|    0.600|D  8.0|28.250|    36.050|    36.050|    43.850
   UNDERGROUND UTILITY      |          |            |          |          |          |          |          |         |      |      |          |          |
   TRADESMAN AP             |08/22/2015|06/30/2016**|    10.900|     6.600|AK   3.000|     2.000|     0.450|    0.600|D  8.0|23.550|    29.000|    29.000|    34.450
   LANDSCAPE TRADESMAN I AQ |08/22/2015|06/30/2016**|    10.550|     6.600|AK    -   |     2.000|     0.450|    0.600|D  8.0|20.200|    25.480|    25.480|    30.750
   LANDSCAPE TRADESMAN II AQ|08/22/2015|06/30/2016**|    10.900|     6.600|AK   3.000|     2.000|     0.450|    0.600|D  8.0|23.550|    29.000|    29.000|    34.450
   SPRINKLER FITTER (FIRE   |          |            |          |          |          |          |          |         |      |      |          |          |
   PROTECTION AND FIRE      |          |            |          |          |          |          |          |         |      |      |          |          |
   CONTROL SYSTEMS)         |08/22/2015|07/31/2016**|A   56.520|     9.770|    16.400|F     -   |     1.100|    0.400|   8.0|84.190|   112.450|   112.450|   140.710
# ROOFER                    |08/22/2015|07/31/2016**|    32.470|     8.420|     5.630|     3.610|     0.850|    0.640|   8.0|51.620|J   67.860|AR  67.860|    84.090
   BITUMASTIC, ENAMELER,    |          |            |          |          |          |          |          |         |      |      |          |          |
   PIPE WRAPPER, COAL TAR   |          |            |          |          |          |          |          |         |      |      |          |          |
   PITCH BUILD-UP           |08/22/2015|07/31/2016**|    34.470|     8.420|     5.630|     3.610|     0.850|    0.640|   8.0|53.620|J   70.860|AR  70.860|    88.090
   MASTIC WORKER, KETTLEMAN |08/22/2015|07/31/2016**|    32.720|     8.420|     5.630|     3.610|     0.850|    0.640|   8.0|51.870|J   68.230|AR  68.230|    84.590
# SHEET METAL WORKER        |08/22/2015|06/26/2016* |AA  52.200|AS  13.460|AT  26.420|F     -   |     1.410|    1.150|   8.0|94.640|O  123.640|O  123.640|   152.640
   TOTAL SHEET METAL        |          |            |          |          |          |          |          |         |      |      |          |          |
   CONTRACT OF $200,000 OR  |          |            |          |          |          |          |          |         |      |      |          |          |
   LESS                     |08/22/2015|06/26/2016* |AA  46.300|AS  13.460|AT  25.140|F     -   |     1.410|    1.150|   8.0|87.460|O  113.190|O  113.190|   138.910
   SERVICE MECHANIC (TOTAL  |          |            |          |          |          |          |          |         |      |      |          |          |
   SHEET METAL CONTRACT OF  |          |            |          |          |          |          |          |         |      |      |          |          |
   $200,000 OR LESS)        |08/22/2015|06/26/2016* |AA  35.720|AU  12.940|AT  14.680|F     -   |     1.310|    1.150|   8.0|65.800|AV  84.910|AV  84.910|   104.020
   SERVICE TECHNICIAN       |          |            |          |          |          |          |          |         |      |      |          |          |
   (TOTAL SHEET METAL       |          |            |          |          |          |          |          |         |      |      |          |          |
   CONTRACT OF $200,000 OR  |          |            |          |          |          |          |          |         |      |      |          |          |
   LESS)                    |08/22/2015|06/26/2016* |AA  32.370|AU  12.940|AT   9.410|F     -   |     1.310|    1.150|   8.0|57.180|AV  74.160|AV  74.160|    91.150
   AIR CONDITIONING         |          |            |          |          |          |          |          |         |      |      |          |          |
   SPECIALIST (TOTAL SHEET  |          |            |          |          |          |          |          |         |      |      |          |          |
   METAL CONTRACT OF        |          |            |          |          |          |          |          |         |      |      |          |          |
   $200,000 OR LESS)        |08/22/2015|06/26/2016* |AA  28.810|AU  12.940|AT   4.330|F     -   |     1.290|    1.150|   8.0|48.520|O   63.380|O   63.380|    78.230
   AIR CONDITIONING         |          |            |          |          |          |          |          |         |      |      |          |          |
   JOURNEYMAN (TOTAL SHEET  |          |            |          |          |          |          |          |         |      |      |          |          |
   METAL CONTRACT OF        |          |            |          |          |          |          |          |         |      |      |          |          |
   $200,000 OR LESS)        |08/22/2015|06/26/2016* |AA  33.510|AS  12.960|AT   9.690|F     -   |     1.290|    1.150|   8.0|58.600|O   76.100|O   76.100|    93.610
   METAL DECK & SIDING      |02/22/2015|06/30/2015* |AA  33.860|AK  13.530|AW  18.000|F     -   |AX   0.300|      -  |   8.0|65.690|O   83.620|O   83.620|   101.550
# TERRAZZO FINISHER AY      |08/22/2015|06/30/2016**|AZ  33.780|     9.790|     5.140|F     -   |     0.800|    0.530|   8.0|50.040|O   64.820|O   64.820|    79.600
# TERRAZZO WORKER AY        |08/22/2015|06/30/2016**|AZ  41.010|     9.790|    14.940|F     -   |     0.800|    0.710|   8.0|67.250|O   85.070|O   85.070|   102.890
# TILE FINISHER             |08/22/2015|03/31/2016* |BA  22.790|     8.830|     3.460|     0.700|     0.450|    1.130|   8.0|37.360|    48.760|D   48.760|    60.150
   RED CIRCLED FINISHER     |08/22/2015|03/31/2016* |BA  28.480|     8.830|     3.690|     1.300|     0.350|    1.140|   8.0|43.790|    58.030|D   58.030|    72.270
# TILE SETTER               |08/22/2015|03/31/2016* |BA  39.520|     8.830|     4.690|     2.350|     0.690|    1.730|   8.0|57.810|    77.570|D   77.570|    97.330
  WATER WELL DRILLER        |          |            |          |          |          |          |          |         |      |      |          |          |
   DRILLER, PUMP REPAIRMAN  |08/22/2007|01/31/2008* |    20.170|     8.120|     3.690|BB   0.800|      -   |      -  |   8.0|32.780|BC  42.870|BC  42.870|BC  42.870
   PUMP INSTALLER           |08/22/2007|01/31/2008* |    17.860|     8.120|     3.690|BD   0.720|      -   |      -  |   8.0|30.390|BC  39.320|BC  39.320|BC  39.320
   HELPER                   |08/22/2007|01/31/2008* |    12.470|     8.120|     3.690|BE   0.530|      -   |      -  |   8.0|24.810|BC  31.040|BC  31.040|BC  31.040
___________________________________________________________________________________________________________________________________________________________________
                                        GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS
                                  PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1


*  EFFECTIVE UNTIL SUPERSEDED BY A NEW DETERMINATION ISSUED BY THE DIRECTOR OF INDUSTRIAL RELATIONS. CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT
   AT (415) 703-4774 FOR THE NEW RATES AFTER TEN DAYS AFTER THE EXPIRATION DATE IF NO SUBSEQUENT DETERMINATION IS ISSUED.


** THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED.  IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD
   BE INCORPORATED IN CONTRACTS ENTERED INTO NOW.  CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
#  INDICATES AN APPRENTICEABLE CRAFT.  THE CURRENT APPRENTICE WAGE RATES ARE AVAILABLE ON THE INTERNET @
   HTTP://WWW.DIR.CA.GOV/OPRL/PWAPPWAGE/PWAPPWAGESTART.ASP.  TO OBTAIN ANY APPRENTICE WAGE RATES AS OF JULY 1, 2008 AND PRIOR TO SEPTEMBER 27, 2012,
   PLEASE CONTACT THE DIVISION OF APPRENTICESHIP STANDARDS OR REFER TO THE DIVISION OF APPRENTICESHIP STANDARDS' WEBSITE AT
   HTTP://WWW.DIR.CA.GOV/DAS/DAS.HTML.
&  THE BASIC HOURLY RATE AND EMPLOYER PAYMENTS ARE NOT TAKEN FROM A COLLECTIVE BARGAINING AGREEMENT FOR THIS CRAFT OR CLASSIFICATION.

____________
A  INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF.
B  INCLUDES AN AMOUNT FACTORED AT THE OVERTIME MULTIPLIER RATE.
C  INCLUDES AMOUNT FOR INDUSTRY PROMOTION FUND, INTERNATIONAL MASONRY INSTITUTE (IMI), AND LABOR MANAGEMENT COOPERATION COMMITTEE (LMCC)
D  SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
E  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 10 HOURS ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME HOURLY
   RATE.
F  INCLUDED IN STRAIGHT-TIME HOURLY RATE.
G  RATE APPLIES TO THE FIRST 10 HOURS WORKED ON SATURDAY.  ALL OTHER HOURS ARE PAID AT THE SUNDAY/HOLIDAY RATE.
H  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE. SATURDAYS IN THE SAME WORK WEEK MAY BE WORKED AT STRAIGHT-TIME IF JOB IS SHUT DOWN DURING THE NORMAL WORKWEEK DUE TO INCLEMENT WEATHER.
I  INCLUDED IN BASIC HOURLY RATE.
J  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 12 HOURS WORKED ON SATURDAY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
K  IN ADDITION, AN AMOUNT EQUAL TO 3% OF THE  BASIC HOURLY RATE IS ADDED TO THE TOTAL HOURLY RATE AND OVERTIME HOURLY RATES FOR THE NATIONAL EMPLOYEES
   BENEFIT BOARD.
L  IN ADDITION, AN AMOUNT EQUAL TO 0.5% OF THE BASIC HOURLY RATE, WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER, IS ADDED TO THE TOTAL HOURLY
   RATE AND OVERTIME HOURLY RATES.
M  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   RATE.
N  AMOUNT IS FOR INDUSTRY FUND.
O  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS ON SATURDAY ONLY; ALL OTHER TIME IS PAID AT THE SUNDAY AND HOLIDAY OVERTIME
   HOURLY RATE.
P  ALL CREWS, WITHOUT CONSIDERATION TO THE NUMBER OF INDIVIDUALS IN THE CREW, SHALL INCLUDE A CHIEF OF PARTY.  A CREW CONSISTS OF ONE (1) OR MORE
   EMPLOYEES PERFORMING FIELD AND CONSTRUCTION SURVEY WORK.
Q  INCLUDES AN AMOUNT PER HOUR WORKED FOR ANNUITY TRUST FUND.
R  INCLUDES AN AMOUNT PER HOUR WORKED FOR SUPPLEMENTAL DUES.
S  RATE APPLIES TO THE FIRST 4 DAILY OVERTIME HOURS, MONDAY THROUGH FRIDAY.  ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.
T  RATE APPLIES TO THE FIRST 12 OVERTIME HOURS WORKED.  ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE.  IN THE EVENT IT IS NOT REASONABLY
   POSSIBLE TO COMPLETE 40 HOURS OF WORK ON AN 8 HOUR DAY, MONDAY THROUGH FRIDAY, THEN THE BALANCE OF THE 40 HOURS, UP TO 8 HOURS, MAY BE WORKED ON
   SATURDAY AT THE STRAIGHT-TIME RATE.
U  INCLUDES AN AMOUNT PER HOUR WORKED FOR IUPAT, IARP, AND RETIREE PENSION.
V  INCLUDES AMOUNTS FOR INDUSTRY FUND, WORK PRESERVATION FUND, AND LABOR MANAGEMENT COOPERATION INITIATIVE
W  RATE APPLIES TO THE FIRST 2 DAILY OVERTIME HOURS AND FIRST 8 HOURS WORKED ON DESIGNATED DAYS OFF; ALL OTHER TIME IS PAID AT THE SATURDAY, SUNDAY AND
   HOLIDAY OVERTIME RATE.
X  EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SCAFFFOLD SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
Y  INCLUDES AN AMOUNT FOR DUES CHECK-OFF AND VACATION/HOLIDAY WHICH ARE FACTORED INTO OVERTIME RATES.
Z  RATE APPLIES TO FIRST 2 OVERTIME HOURS MONDAY THROUGH FRIDAY; ALL OTHER OVERTIME IS PAID AT THE DOUBLE TIME RATE.
AA INCLUDES AMOUNT FOR VAC/HOL AND DUES CHECK OFF.
AB DESIGNATED DAYS OFF SHALL BE PAID AT THE SATURDAY OVERTIME RATE; PLEASE REFER TO THE HOLIDAY PROVISIONS FOR A LIST OF DESIGNATED DAYS OFF.
AC INCLUDES AMOUNTS FOR VACATION AND DUES CHECK OFF
AD PLEASE NOTE THAT THE TAPER CLEAN-UP APPLIES ONLY TO THE TAPER CLASSIFICATION.
AE INCLUDES AN AMOUNT FOR DUES CHECK OFF
AF INCLUDE AMOUNTS WITHHELD FOR DUES CHECK OFF AND VACATION WHICH IS NOT FACTORED INTO OVERTIME.  EMPLOYEES OPERATING AND WORKING BEHIND PLASTER GUNS
   SHALL RECEIVE AN ADDITIONAL $5.00 PER DAY ABOVE THE WAGE RATE.  EMPLOYEES WORKING ON AN EXTERIOR SUSPENDED SCAFFOLD SHALL BE PAID AN ADDITIONAL $10.00
   PER DAY ABOVE THE WAGE RATE.
AG RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAYS AND DESIGNATED DAYS OFF. ALL OTHER TIME IS
   PAID AT THE SUNDAY AND HOLIDAY OVERTIME RATE.
AH ALL HOD CARRIERS WORKING ON THE HOSE SHALL RECEIVE $5.00 PER DAY OVER SCALE.
AI INCLUDES AN AMOUNT FOR VACATION, DUES CHECK-OFF AND ORGANIZING DUES WHICH ARE NOT FACTORED INTO OVERTIME.
AJ RATE APPLIES TO THE FIRST 4 OVERTIME HOURS MONDAY THROUGH FRIDAY AND THE FIRST 8 HOURS WORKED ON SATURDAY. ALL OTHER TIME IS PAID AT THE SUNDAY AND
   HOLIDAY OVERTIME RATE.
AK PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE
   RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AL SATURDAY MAY BE PAID AT STRAIGHT TIME IF THE WORK WEEK IS TUESDAY THROUGH SATURDAY.
AM IN ADDITION, AN AMOUNT OF $0.50 FOR HEALTH REIMBURSEMENT ACCOUNT IS ADDED TO THE TOTAL HOURLY RATE AND FACTORED INTO OVERTIME. PURSUANT TO LABOR CODE
   SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL
   HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AN IN ADDITION, AN AMOUNT OF $5.00 FOR 401A SUPPLEMENTAL PENSION IS ADDED TO THE TOTAL HOURLY RATE AND FACTORED INTO OVERTIME. PURSUANT TO LABOR CODE
   SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL
   HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AO THERE MUST BE AT LEAST ONE JOURNEYMAN PIPEFITTER PER CONTRACTOR ON EACH JOBSITE.
AP THERE SHALL BE NO MORE THAN THREE TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER COMBINATION EMPLOYED PER CONTRACTOR ON
   EACH JOBSITE.
AQ THERE SHALL BE NO MORE THAN FOUR TRADESMEN TO EVERY TWO JOURNEYMAN PIPEFITTER/ASSISTANT JOURNEYMAN PIPEFITTER  COMBINATION EMPLOYED PER CONTRACTOR ON
   EACH JOBSITE. MAINTENANCE WORK, BOTH DURING AND AFTER THE PLANT ESTABLISHMENT PERIOD, MAY BE PERFORMED BY LANDSCAPE TRADESMEN WITHOUT THE SUPERVISION
   OF A JOURNEYMAN PIPEFITTER.
AR APPLIES TO THE FIRST 12 HOURS WORKED ON SATURDAY.  ALL OTHER OVERTIME IS PAID AT THE SUNDAY/HOLIDAY RATE. IN THE EVENT THAT CONDITIONS OVER WHICH THE
   ROOFING CONTRACTOR HAS NO CONTROL (I.E. ADVERSE WEATHER, PROJECT DELAYS, LOGISTICAL PROBLEMS, GENERAL CONTRACTOR OR BUILDING OWNER REQUIREMENTS, ETC.)
   PREVENT EMPLOYEES FROM WORKING ON ONE OR MORE DAYS DURING THE REGULAR WORK WEEK, WORK PERFORMED ON SATURDAY MAY BE PAID AT THE STRAIGHT TIME RATES.
AS INCLUDES SMOHIT AND SHC.  EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY
   RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL
   PREVAILING RATE OF PER DIEM WAGES.
AT INCLUDES AN AMOUNT FOR PENSION WHICH IS FACTORED AT THE APPLICABLE OVERTIME MULTIPLIER.  PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT
   PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME
   MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF PER DIEM WAGES.
AU INCLUDES SHC.  EFFECTIVE 1/1/2013, PURSUANT TO LABOR CODE SECTIONS 1773.1 AND 1773.8, THE AMOUNT PAID FOR THIS EMPLOYER PAYMENT MAY VARY RESULTING IN
   A LOWER TAXABLE BASIC HOURLY WAGE RATE, BUT THE TOTAL HOURLY RATES FOR STRAIGHT TIME AND OVERTIME MAY NOT BE LESS THAN THE GENERAL PREVAILING RATE OF
   PER DIEM WAGES.
AV RATE APPLIES TO FIRST 4 DAILY OVERTIME HOURS AND THE FIRST 8 HOURS WORKED ON SATURDAY DURING THE EMPLOYEES NORMAL WORKING HOURS.  ALL OTHER OVERTIME
   HOURS SHALL BE PAID AT THE SUNDAY AND HOLIDAY DOUBLE TIME RATE.
AW INCLUDES AN AMOUNT FOR PENSION FACTORED AT THE OVERTIME MULTIPLIER RATE.
AX INCLUDES $0.03 FOR SCHOLAR FUND.
AY THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).
AZ INCLUDES AN AMOUNT FOR VACATION/DUES CHECK OFF WHICH IS NOT FACTORED IN THE OVERTIME RATES.
BA INCLUDES AMOUNT WITHHELD FOR DUES CHECK OFF, WHICH IS FACTORED IN THE OVERTIME RATES. ANY EMPLOYEE WORKING UNDERGROUND SHALL RECEIVE $1.00 PER HOUR IN
   ADDITION TO REGULAR WAGES.
BB RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.35 AFTER 2 YEARS; $1.45 AFTER 5 YEARS; $1.60 AFTER 10 YEARS
BC COMPUTATION IS BASED ON THE LOWEST VACATION AMOUNT. THESE RATES SHOULD BE INCREASED BY ANY ADDITIONAL VACATION/HOLIDAY PAY THAT IS REQUIRED.
BD RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.27 AFTER 2 YEARS; $1.37 AFTER 5 YEARS; $1.52 AFTER 10 YEARS.
BE RATE APPLIES TO FIRST TWO YEARS OF EMPLOYMENT ONLY; $1.08 AFTER 2 YEARS; $1.18 AFTER 5 YEARS; $1.33 AFTER 10 YEARS.

RECOGNIZED HOLIDAYS: HOLIDAYS UPON WHICH THE GENERAL PREVAILING HOURLY WAGE RATE FOR HOLIDAY WORK SHALL BE PAID, SHALL BE ALL HOLIDAYS IN THE
   COLLECTIVE BARGAINING AGREEMENT, APPLICABLE TO THE PARTICULAR CRAFT, CLASSIFICATION, OR TYPE OF WORKER EMPLOYED ON THE PROJECT, WHICH IS ON FILE WITH
   THE DIRECTOR OF INDUSTRIAL RELATIONS.  IF THE PREVAILING RATE IS NOT BASED ON A COLLECTIVELY BARGAINED RATE, THE HOLIDAYS UPON WHICH THE PREVAILING
   RATE SHALL BE PAID SHALL BE AS PROVIDED IN SECTION 6700 OF THE GOVERNMENT CODE.  YOU MAY OBTAIN THE HOLIDAY PROVISIONS FOR THE CURRENT DETERMINATIONS
   ON THE INTERNET AT HTTP://WWW.DIR.CA.GOV/OPRL/PWD.  HOLIDAY PROVISIONS FOR THE CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE
   OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.

TRAVEL AND/OR SUBSISTENCE: IN ACCORDANCE WITH LABOR CODE SECTIONS 1773.1 AND 1773.9, CONTRACTORS SHALL MAKE TRAVEL AND/OR SUBSISTENCE PAYMENTS TO EACH
   WORKER TO EXECUTE THE WORK.  YOU MAY OBTAIN THE TRAVEL AND/OR SUBSISTENCE PROVISIONS FOR THE CURRENT DETERMINATIONS ON THE INTERNET AT
   HTTP://WWW.DIR.CA.GOV/OPRL/PWD.  TRAVEL AND/OR SUBSISTENCE REQUIREMENTS FOR CURRENT OR SUPERSEDED DETERMINATIONS MAY BE OBTAINED BY CONTACTING THE
   OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774.