GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS
LOCALITY: LAKE COUNTY
DETERMINATION: LAK-2026-2
PREDETERMINED INCREASES
| CRAFT | CLASSIFICATION | CRAFT FOOTNOTE | ISSUE DATE | EXPIRATION DATE | DATE OF NEXT INCREASE 1 | AMOUNT OF INCREASE 1 | INCREASE FOOTNOTE 1 | DATE OF NEXT INCREASE 2 | AMOUNT OF INCREASE 2 | INCREASE FOOTNOTE 2 | DATE OF NEXT INCREASE 3 | AMOUNT OF INCREASE 3 | INCREASE FOOTNOTE 3 | DATE OF NEXT INCREASE 4 | AMOUNT OF INCREASE 4 | INCREASE FOOTNOTE 4 | DATE OF NEXT INCREASE 5 | AMOUNT OF INCREASE 5 | INCREASE FOOTNOTE 5 | DATE OF NEXT INCREASE 6 | AMOUNT OF INCREASE 6 | INCREASE FOOTNOTE 6 | DATE OF NEXT INCREASE 7 | AMOUNT OF INCREASE 7 | INCREASE FOOTNOTE 7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| BRICKLAYER, BLOCKLAYER: | POINTER, CLEANER, CAULKER, WATERPROOFER | 08/22/2026 | 06/30/2027** | 07/01/2027 | $4.000 | A | 07/01/2028 | $4.250 | A | 07/01/2029 | $4.750 | A | |||||||||||||
| CARPET, LINOLEUM, | SOFT FLOOR LAYER | 08/22/2026 | 12/31/2026** | 01/01/2027 | $4.000 | B | |||||||||||||||||||
| ELECTRICIAN: | COMM & SYSTEM INSTALLER | 02/22/2026 | 11/30/2026** | 12/01/2026 | $3.400 | A | |||||||||||||||||||
| ELECTRICIAN: | COMM & SYSTEM TECH. | 02/22/2026 | 11/30/2026** | 12/01/2026 | $3.400 | A | |||||||||||||||||||
| MARBLE FINISHER | C | 08/22/2026 | 07/31/2027** | 08/01/2027 | $2.500 | A | 08/01/2028 | $2.750 | A | ||||||||||||||||
| MARBLE MASON | C | 08/22/2026 | 07/31/2027** | 08/01/2027 | $3.250 | A | 08/01/2028 | $3.400 | A | ||||||||||||||||
| PAINTER: | TAPER | 08/22/2026 | 06/30/2027** | 07/01/2027 | $5.000 | A | 07/01/2028 | $5.000 | A | 07/01/2029 | $5.000 | A | |||||||||||||
| PLASTERER | 08/22/2026 | 06/30/2027** | 07/01/2027 | $4.000 | D | 07/01/2028 | $4.000 | D | |||||||||||||||||
| PLUMBER: | PLUMBER, STEAMFITTER | 08/22/2026 | 06/30/2027** | 07/01/2027 | $5.000 | A | 07/01/2028 | $5.000 | A | ||||||||||||||||
| PLUMBER: | PLUMBING SERVICE AND REPAIR | 08/22/2026 | 06/30/2027** | 07/01/2027 | $4.250 | A | 07/01/2028 | $4.250 | A | ||||||||||||||||
| PLUMBER: | REFRIGERATION FITTER (HVAC) | 08/22/2026 | 06/30/2027** | 07/01/2027 | $5.000 | A | 07/01/2028 | $5.000 | A | ||||||||||||||||
| PLUMBER: | AIR CONDITIONING & REFRIGERATION/HVAC - SERVICE WORK | 08/22/2026 | 06/30/2027** | 07/01/2027 | $5.000 | A | 07/01/2028 | $5.000 | A | ||||||||||||||||
| PLUMBER: | LIGHT COMMERCIAL | E | 08/22/2026 | 06/30/2027** | 07/01/2027 | $4.250 | A | 07/01/2028 | $4.250 | A | |||||||||||||||
| PLUMBER: | LANDSCAPE/IRRIGATION PIPEFITTER | 08/22/2026 | 06/30/2027** | 07/01/2027 | $4.250 | A | 07/01/2028 | $4.250 | A | ||||||||||||||||
| PLUMBER: | UNDERGROUND/UTILITY PIPEFITTER | 08/22/2025 | 06/30/2027** | 07/01/2027 | $4.250 | A | 07/01/2028 | $4.250 | A | ||||||||||||||||
| PLUMBER: | FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) | 08/22/2026 | 12/31/2026** | 01/01/2027 | $1.000 | F | 04/01/2027 | $3.170 | G | 01/01/2028 | $1.000 | F | 04/01/2028 | $0.500 | H | 01/01/2029 | $1.000 | F | 04/01/2029 | $0.500 | H | 01/01/2030 | $1.000 | F | |
| SHEET METAL WORKER | 08/22/2026 | 06/27/2027** | 06/28/2027 | $5.400 | A | 07/03/2028 | $5.600 | A | |||||||||||||||||
| SHEET METAL WORKER | TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS | 08/22/2026 | 06/27/2027** | 06/28/2027 | $4.400 | A | 07/03/2028 | $4.600 | A | ||||||||||||||||
| SHEET METAL WORKER | SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) | 08/22/2026 | 06/27/2027** | 06/28/2027 | $3.240 | A | 07/03/2028 | $3.360 | A | ||||||||||||||||
| SHEET METAL WORKER | SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) | 08/22/2026 | 06/27/2027** | 06/28/2027 | $2.970 | A | 07/03/2028 | $3.080 | A | ||||||||||||||||
| SHEET METAL WORKER | AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) | 08/22/2026 | 06/27/2027** | 06/28/2027 | $2.430 | A | 07/03/2028 | $2.520 | A | ||||||||||||||||
| SHEET METAL WORKER | AIR CONDITIONING PRO (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) | 08/22/2026 | 06/27/2027** | 06/28/2027 | $2.970 | A | 07/03/2028 | $3.080 | A | ||||||||||||||||
| TILE SETTER | 08/22/2026 | 03/31/2027** | 04/01/2027 | $3.500 | A |
FOOTNOTES
- **
- THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
- A
- THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
- B
- $2.50 TO BASIC HOURLY RATE, $0.50 TO HEALTH & WELFARE, AND $1.00 TO PENSION.
- C
- EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SWING STAGE SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
- D
- $0.25 TO HEALTH&WELFARE, $0.50 TO PENSION, AND $3.25 TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS.
- E
- APPLIES TO ALL WORK EXCEPT HVAC/REFRIGERATION AND NEW CONSTRUCTION OR REMODEL OF PRISONS AND/OR JAILS, HOSPITALS, CASINOS, COLLEGES, AIRPORTS, WASTEWATER TREATMENT PLANTS, GEYSERS, AND RESEARCH FACILITIES.
- F
- $0.95 TO HEALTH AND WELFARE, AND $0.05 TO PENSION.
- G
- $3.17 TO BASIC HOURLY RATE.
- H
- $0.50 TO PENSION.