GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS

LOCALITY: MENDOCINO COUNTY

DETERMINATION: MEN-2026-1

PREDETERMINED INCREASES

CRAFT CLASSIFICATION CRAFT FOOTNOTE ISSUE DATE EXPIRATION DATE DATE OF NEXT INCREASE 1 AMOUNT OF INCREASE 1 INCREASE FOOTNOTE 1 DATE OF NEXT INCREASE 2 AMOUNT OF INCREASE 2 INCREASE FOOTNOTE 2 DATE OF NEXT INCREASE 3 AMOUNT OF INCREASE 3 INCREASE FOOTNOTE 3 DATE OF NEXT INCREASE 4 AMOUNT OF INCREASE 4 INCREASE FOOTNOTE 4 DATE OF NEXT INCREASE 5 AMOUNT OF INCREASE 5 INCREASE FOOTNOTE 5 DATE OF NEXT INCREASE 6 AMOUNT OF INCREASE 6 INCREASE FOOTNOTE 6 DATE OF NEXT INCREASE 7 AMOUNT OF INCREASE 7 INCREASE FOOTNOTE 7 DATE OF NEXT INCREASE 8 AMOUNT OF INCREASE 8 INCREASE FOOTNOTE 8
BRICKLAYER, BLOCKLAYER: BRICKLAYER, BLOCKLAYER, STONEMASON 08/22/2025 04/30/2026** 05/01/2026 $3.250 A
BRICK TENDER 08/22/2025 06/30/2026** 07/01/2026 $3.120 A
CARPET, LINOLEUM, SOFT FLOOR LAYER 02/22/2026 12/31/2026** 01/01/2027 $4.000 A
ELECTRICIAN: COMM & SYSTEM INSTALLER 02/22/2026 11/30/2026** 12/01/2026 $3.400 A
ELECTRICIAN: COMM & SYSTEM TECH. 02/22/2026 11/30/2026** 12/01/2026 $3.400 A
ELECTRICIAN: INSIDE WIREMAN 08/22/2025 05/31/2026** 06/01/2026 $4.300 A
ELECTRICIAN: CABLE SPLICER 08/22/2025 05/31/2026** 06/01/2026 $4.300 A
ELECTRICIAN: TUNNEL WIREMAN 08/22/2025 05/31/2026** 06/01/2026 $4.300 A
ELECTRICIAN: TUNNEL CABLE SPLICER 08/22/2025 05/31/2026** 06/01/2026 $4.300 A
MARBLE FINISHER B 08/22/2025 07/31/2026** 08/01/2026 $2.500 A 08/01/2027 $2.500 A 08/01/2028 $2.750 A
MARBLE MASON B 08/22/2025 07/31/2026** 08/01/2026 $3.150 A 08/01/2027 $3.250 A 08/01/2028 $3.400 A
PLASTERER 08/22/2025 06/30/2026** 07/01/2026 $4.000 C 07/01/2027 $4.000 C 07/01/2028 $4.000 C
PLUMBER: PLUMBER, STEAMFITTER 08/22/2025 06/30/2026** 07/01/2026 $4.750 A 07/01/2027 $5.000 A 07/01/2028 $5.000 A
PLUMBER: PLUMBING SERVICE AND REPAIR 08/22/2025 06/30/2026** 07/01/2026 $4.040 A 07/01/2027 $4.250 A 07/01/2028 $4.250 A
PLUMBER: REFRIGERATION FITTER (HVAC) 08/22/2025 06/30/2026** 07/01/2026 $4.750 A 07/01/2027 $5.000 A 07/01/2028 $5.000 A
PLUMBER: AIR CONDITIONING & REFRIGERATION/HVAC - SERVICE WORK 08/22/2025 06/30/2026** 07/01/2026 $4.750 A 07/01/2027 $5.000 A 07/01/2028 $5.000 A
PLUMBER: LIGHT COMMERCIAL D 08/22/2025 06/30/2026** 07/01/2026 $4.040 A 07/01/2027 $4.250 A 07/01/2028 $4.250 A
PLUMBER: LANDSCAPE/IRRIGATION PIPEFITTER 08/22/2025 06/30/2026** 07/01/2026 $4.040 A 07/01/2027 $4.250 A 07/01/2028 $4.250 A
PLUMBER: UNDERGROUND/UTILITY PIPEFITTER 08/22/2025 06/30/2026** 07/01/2026 $4.040 A 07/01/2027 $4.250 A 07/01/2028 $4.250 A
PLUMBER: FIRE SPRINKLER FITTER (PROTECTION AND CONTROL SYSTEMS, OVERHEAD AND UNDERGROUND) 02/22/2026 03/31/2026** 04/01/2026 $3.170 E 01/01/2027 $1.000 F 04/01/2027 $3.170 E 01/01/2028 $1.000 F 04/01/2028 $0.500 G 01/01/2029 $1.000 F 04/01/2029 $0.500 G 01/01/2030 $1.000 F
ROOFER 08/22/2025 07/31/2026** 08/01/2026 $4.000 A
ROOFER BITUMASTIC, ENAMELER, PIPE WRAPPER, COAL TAR PITCH BUILD-UP 08/22/2025 07/31/2026** 08/01/2026 $4.000 A
ROOFER MASTIC WORKER, KETTLEMAN 08/22/2025 07/31/2026** 08/01/2026 $4.000 A
SHEET METAL WORKER 02/22/2026 06/28/2026** 06/29/2026 $5.200 A 06/28/2027 $5.400 A 07/03/2028 $5.600 A
SHEET METAL WORKER TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS 02/22/2026 06/28/2026** 06/29/2026 $4.200 A 06/28/2027 $4.400 A 07/03/2028 $4.600 A
SHEET METAL WORKER SERVICE MECHANIC (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 02/22/2026 06/28/2026** 06/29/2026 $3.120 A 06/28/2027 $3.240 A 07/03/2028 $3.360 A
SHEET METAL WORKER SERVICE TECHNICIAN (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 02/22/2026 06/28/2026** 06/29/2026 $2.860 A 06/28/2027 $2.970 A 07/03/2028 $3.080 A
SHEET METAL WORKER AIR CONDITIONING SPECIALIST (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 02/22/2026 06/28/2026** 06/29/2026 $2.340 A 06/28/2027 $2.430 A 07/03/2028 $2.520 A
SHEET METAL WORKER AIR CONDITIONING PRO (TOTAL SHEET METAL CONTRACT OF $200,000 OR LESS) 02/22/2026 06/28/2026** 06/29/2026 $2.860 A 06/28/2027 $2.970 A 07/03/2028 $3.080 A
TERRAZZO FINISHER H 08/22/2025 06/30/2026** 07/01/2026 $2.500 A
TERRAZZO WORKER H 08/22/2025 06/30/2026** 07/01/2026 $3.000 A
TILE SETTER 08/22/2025 03/31/2026** 04/01/2026 $3.000 A 04/01/2027 $3.500 A
WATER WELL DRILLER: 08/22/2025 06/30/2026** 07/01/2026 $2.000 A
WATER WELL DRILLER: PUMP INSTALLER 08/22/2025 06/30/2026** 07/01/2026 $2.000 A
WATER WELL DRILLER: HELPER 08/22/2025 06/30/2026** 07/01/2026 $2.000 A

Return to wage page

FOOTNOTES

**
THE RATE TO BE PAID FOR WORK PERFORMED AFTER THIS DATE HAS BEEN DETERMINED. IF WORK WILL EXTEND PAST THIS DATE, THE NEW RATE MUST BE PAID AND SHOULD BE INCORPORATED IN CONTRACTS ENTERED INTO NOW. CONTACT THE OFFICE OF THE DIRECTOR RESEARCH UNIT FOR SPECIFIC RATES AT (415) 703-4774.
A
THE PREDETERMINED INCREASE SHOWN IS TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS. PLEASE CONTACT THE OFFICE OF THE DIRECTOR - RESEARCH UNIT AT (415) 703-4774 WHEN THE PREDETERMINED INCREASE BECOMES DUE TO CONFIRM THE DISTRIBUTION. PLEASE ALSO EXAMINE THE IMPORTANT NOTICES TO SEE IF ANY MODIFICATIONS HAVE BEEN ISSUED, AS THERE MAY BE REDUCTIONS TO PREDETERMINED INCREASES.
B
EMPLOYEES WORKING ON ANY SUSPENDED PLATFORM/SWING STAGE SHALL BE PAID AN ADDITIONAL $20.00 PER DAY ABOVE THE WAGE RATE.
C
$0.25 TO HEALTH&WELFARE, $0.50 TO PENSION, AND $3.25 TO BE ALLOCATED TO WAGES AND/OR EMPLOYER PAYMENTS.
D
APPLIES TO ALL WORK EXCEPT HVAC/REFRIGERATION AND NEW CONSTRUCTION OR REMODEL OF PRISONS AND/OR JAILS, HOSPITALS, CASINOS, COLLEGES, AIRPORTS, WASTEWATER TREATMENT PLANTS, GEYSERS, AND RESEARCH FACILITIES.
E
$3.17 TO BASIC HOURLY RATE.
F
$0.95 TO HEALTH AND WELFARE, AND $0.05 TO PENSION.
G
$0.50 TO PENSION.
H
THE RATIO OF TERRAZZO FINISHER HOURS TO TERRAZZO WORKER HOURS SHALL NOT EXCEED TWO (2) TO ONE (1).

Return to main page